ODOT contract 250422 bid tabulation

D02-LG FY2026 (LIGHTING). Let by Ohio DOT on September 11, 2025, District 2. 3 bids received; low bid $946,225 by J Ranck Electric Inc, +4.9% against the engineer's estimate of $902,000.

Owner
Ohio DOT
Letting
11 SEP 2025
Pay items
62
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1J Ranck Electric Inc$946,225Low+5.0%
2U S Utility Contractor Company$1,014,893+7.0%+13%
3Miller Cable Company$1,609,885+70%+78%
ODOT contract 250422: bids by rank

Engineer's estimate: $902,000.

Bid tabulation

LinePay itemUnitQuantity1. J Ranck Electric Inc2. U S Utility Contractor Company3. Miller Cable Company
1Control center removed (202E75700)LS1$1,500.00$1,155.00$1,200.00
2Erosion control (832E30000)EACH1,000$1.00$1.00$1.00
3Connection, fused pull apart (625E00450)EACH20$200.00$145.50$180.00
4Connection, unfused pull apart (625E00460)EACH20$100.00$139.75$180.00
5Connection, unfused permanent (625E00480)EACH20$100.00$145.50$180.00
6Transformer base, type at-A (625E02500)EACH8$900.00$967.25$1,200.00
7Transformer base, type at-C (625E02600)EACH8$1,000.00$1,381.25$1,600.00
8Light pole, misc.: lightpole (725.21), 30' height (625E10500)EACH2$3,500.00$6,267.80$6,500.00
9Light pole, misc.: lightpole (725.21), 33'-6" heig (625E10500)EACH5$3,500.00$6,561.05$7,500.00
10Light pole, misc.: lightpole (725.21), 50' height (625E10500)EACH1$6,000.00$4,649.75$6,000.00
11Light pole, misc.: lightpole (725.21), VGCS, 20'-5 (625E10500)EACH2$9,500.00$4,805.00$10,000
12Light pole (installation only), as per plan (625E10503)EACH5$2,000.00$895.00$1,600.00
13Light pole (installation only), as per plan (625E10503)EACH1$2,000.00$895.00$1,500.00
14Erecting reusable downed light pole (625E10504)EACH15$700.00$952.50$2,500.00
15Erecting reusable downed light pole (625E10504)EACH5$700.00$952.50$2,000.00
16Light pole foundation, as per plan (625E14501)EACH5$2,500.00$2,135.00$4,500.00
17Bracket arm, misc.:bracket arm (625E18600)EACH10$1,500.00$3,024.70$3,000.00
18No. 4 AWG 2400 volt distribution cable (625E23200)FT3,300$5.00$5.68$5.00
19No. 4 AWG 2400 volt distribution cable, as per plan (625E23201)FT500$5.00$5.68$6.00
20No. 10 AWG pole and bracket cable, as per plan (625E23401)FT1,000$1.50$2.83$3.00
21Conduit, 1-1/2", 725.04 (625E25300)FT25$30.00$16.15$20.00
22Conduit, 2", 725.04 (625E25400)FT20$40.00$18.45$22.00
23Conduit, 2", 725.05 (625E25402)FT20$10.00$7.29$16.00
24Conduit, 3", 725.04 (625E25500)FT20$70.00$25.05$35.00
25Conduit, 3", 725.05 (625E25502)FT20$10.00$8.04$20.00
26Conduit, 3", 725.051 (625E25504)FT415$30.00$8.15$20.00
27Conduit, jacked or drilled, 725.04, 3" (625E25902)FT50$125.00$64.70$70.00
28Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH50$575.00$744.50$750.00
29Luminaire, high mast, solid state (LED), as per plan (625E26263)EACH10$1,500.00$2,077.05$3,000.00
30Luminaire, low mast, solid state (LED), as per plan (625E26273)EACH20$1,000.00$1,524.20$2,000.00
31Luminaire, underpass, solid state (LED), as per plan (625E27503)EACH30$400.00$1,217.50$900.00
32Luminaire, installation only, as per plan (625E27561)EACH10$325.00$447.50$300.00
33Luminaire, misc.:LED navigational light fixture (625E27600)EACH6$500.00$2,160.00$25,000
34Glare shield, as per plan (625E28001)EACH2$325.00$187.50$250.00
35Pull box removed and replaced (625E31506)EACH9$2,000.00$1,470.00$1,850.00
36Ground rod, as per plan (625E32001)EACH2$500.00$403.75$500.00
37Circuit breaker, tower lighting (625E33100)EACH5$275.00$807.50$1,500.00
38Control center cabinet, complete (625E34450)EACH1$6,000.00$5,900.00$12,000
39Control center cabinet, complete (625E34450)EACH1$6,000.00$4,490.00$10,000
40Control center cabinet, complete (625E34450)EACH2$6,000.00$5,325.00$13,000
41Troubleshooting underground and above ground circuitry problem (625E50100)EACH75$600.00$1,311.50$1,500.00
42Repair integral luminaire lowering mechanism of tower lighting fixture, as per plan (625E50401)EACH1$4,000.00$3,462.50$6,850.00
43Secondary surge protector, as per plan (625E50451)EACH1$625.00$375.00$1,500.00
44Lighting contactor, 100 amp (625E70000)EACH2$850.00$921.25$1,200.00
45Lighting contactor, 60 amp (625E70000)EACH2$700.00$921.25$1,000.00
46Light pole removed, as per plan (625E75401)EACH1$800.00$606.25$900.00
47Lighting, misc.: foundation and pole base inspecti (625E98000)EACH250$425.00$447.50$250.00
48Lighting, misc.:annual operation and inspection of (625E98000)EACH250$525.00$548.75$500.00
49Lighting, misc.:circuit locating (625E98000)EACH100$500.00$577.50$500.00
50Lighting, misc.:photocell, 30 amp (625E98000)EACH1$400.00$317.50$250.00
51Lighting, misc.:photocell, 60 amp (625E98000)EACH2$450.00$317.50$250.00
52Pedestal foundation, as per plan (632E64021)EACH2$4,000.00$1,326.25$1,900.00
53Law enforcement officer with patrol car for assistance (614E11110)HR160$60.00$80.50$85.00
54Maintaining traffic, misc.:double lane closure (614E18000)EACH9$1,000.00$4,762.50$5,875.00
55Maintaining traffic, misc.:ramp closure (614E18000)EACH9$1,000.00$1,615.00$4,500.00
56Maintaining traffic, misc.:roundabout closure (614E18000)EACH5$1,000.00$2,135.00$4,250.00
57Maintaining traffic, misc.:shoulder closure (614E18000)EACH45$1,450.00$1,270.00$2,500.00
58Maintaining traffic, misc.:single lane closure (614E18000)EACH18$1,750.00$2,765.00$5,250.00
59Premium for contract performance bond and for payment bond (103E05000)LS1$50,775$15,275$5,750.00
60Construction layout stakes and surveying, as per plan (623E10001)LS1$100,000$5,775.00$6,500.00
61Mobilization, as per plan (624E15001)EACH10$1,500.00$1,820.00$25,000
62Mobilization, as per plan (624E15001)EACH1$2,500.00$1,820.00$25,000
ODOT contract 250422: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of September 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy