J Ranck Electric Inc: ODOT bid record
J Ranck Electric Inc submitted 26 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 16 JUL 2026, and was the low bidder on 4 of them (15%). When it was not low, its total sat a median +46% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $4,129,332
- Latest bid
- 16 JUL 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 9 | 0 | 0% |
| 2021 | 4 | 1 | 25% |
| 2022 | 5 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2024 | 2 | 1 | 50% |
| 2025 | 3 | 1 | 33% |
| 2026 | 1 | 1 | 100% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 2 | 7 | 4 | 57% |
| District 3 | 4 | 0 | 0% |
| HAM | 3 | 0 | 0% |
| District 7 | 2 | 0 | 0% |
| District 12 | 1 | 0 | 0% |
| MAH | 1 | 0 | 0% |
| MOT | 1 | 0 | 0% |
| ATB | 1 | 0 | 0% |
| ALL | 1 | 0 | 0% |
| District 8 | 1 | 0 | 0% |
| District 5 | 1 | 0 | 0% |
| District 9 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 17 | 14 (82%) | $50.00 | $80.00 |
| Erosion control | 832E30000 | EACH | 14 | 14 (100%) | $1.00 | $1.00 |
| Luminaire, misc.:conventional, solid state (LED), | 625E27600 | EACH | 12 | 12 (100%) | $75.00 | $87.50 |
| Connection, unfused permanent | 625E00480 | EACH | 11 | 6 (55%) | $100.00 | $120.00 |
| No. 10 AWG pole and bracket cable, as per plan | 625E23401 | FT | 7 | 6 (86%) | $1.00 | $1.50 |
| Ballast for tower light fixture, as per plan | 625E19101 | EACH | 5 | 5 (100%) | $110.00 | $257.13 |
| Special - emergency response-knockdown, roadway hazard and/or live exposed wire | 625E50500 | EACH | 6 | 4 (67%) | $150.00 | $250.00 |
| No. 4 AWG 2400 volt distribution cable, as per plan | 625E23201 | FT | 7 | 3 (43%) | $3.00 | $3.22 |
| Conduit, 3", 725.05 | 625E25502 | FT | 6 | 3 (50%) | $7.50 | $12.50 |
| Luminaire, high mast, solid state (LED), as per plan | 625E26263 | EACH | 12 | 2 (17%) | $1,087.50 | $1,200.00 |
| Luminaire, low mast, solid state (LED), as per plan | 625E26273 | EACH | 8 | 2 (25%) | $1,000.00 | $1,051.35 |
| Conduit, jacked or drilled, 725.04, 3" | 625E25902 | FT | 7 | 2 (29%) | $40.00 | $58.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Perram Electric Inc | 13 | 13 of 13 |
| Miller Cable Company | 12 | 11 of 12 |
| U S Utility Contractor Company | 10 | 4 of 10 |
| Asplundh Construction LLC | 7 | 7 of 7 |
| Complete General Construction Company | 6 | 6 of 6 |
| Cornerstone Electric Inc | 5 | 4 of 5 |
| Capital Electric Line Builders Inc | 4 | 4 of 4 |
| Bansal Construction Inc | 4 | 4 of 4 |
| Greenwich Electric Inc | 4 | 4 of 4 |
| Lake Erie Construction Company | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 16 JUL 2026 | 260335 | District 2 | D02-LG FY2027 (LIGHTING) | 1 of 2 | $1,699,995 | Low, 9.0% under the second |
| 11 SEP 2025 | 250406 | CLA | CLA-SR 235/SR 571-04.36/01.05 (LIGHTING) | 6 of 9 | $105,035 | +55% |
| 11 SEP 2025 | 250422 | District 2 | D02-LG FY2026 (LIGHTING) | 1 of 3 | $946,225 | Low, 7.0% under the second |
| 16 JAN 2025 | 250030 | District 7 | D07-ITS Maint-FY 2025 (SIGNALIZATION) | 5 of 5 | $1,479,000 | +83% |
| 22 AUG 2024 | 240409 | District 2 | D02-LG FY2025 (LIGHTING) | 1 of 3 | $1,122,133 | Low, 7.0% under the second |
| 18 APR 2024 | 240251 | District 2 | D02-ITS Maint FY 2024 (SIGNALIZATION) | 3 of 3 | $1,215,650 | +35% |
| 09 NOV 2023 | 230544 | LOR | LOR-/MED-TSG FY2024 (SIGNALIZATION) | 6 of 7 | $221,740 | +32% |
| 26 OCT 2023 | 230528 | District 3 | D03-TSG FY2024(C) (SIGNALIZATION) | 5 of 5 | $165,905 | +81% |
| 13 OCT 2022 | 220559 | District 2 | D02-LG FY2023 (LIGHTING) | 2 of 2 | $738,545 | +16% |
| 15 SEP 2022 | 220510 | District 9 | D09-PR-FY2023 (PRUNING/OR TREE/BRUSH REMOVAL) | 4 of 4 | $1,452,290 | +272% |
| 26 MAY 2022 | 220325 | District 5 | D05-Statewide Lighting Optimization SE Ohio | 6 of 9 | $6,963,970 | +37% |
| 28 APR 2022 | 223004 | District 8 | D08-CLE/HAM ITS Interconnect (SIGNALIZATION) | 2 of 3 | $1,152,500 | 0.0% |
| 17 FEB 2022 | 220119 | District 7 | D07-/D08-LG FY2022/FY2023 (LIGHTING) | 2 of 2 | $5,018,345 | +49% |
| 28 OCT 2021 | 210586 | District 2 | D02-LG FY2022 (LIGHTING) | 1 of 2 | $360,980 | Low, 7.0% under the second |
| 26 AUG 2021 | 210473 | ALL | ALL-Beaverdam Lighting (LIGHTING) | 5 of 5 | $426,866 | +45% |
| 29 JUL 2021 | 210434 | District 3 | D03-LG FY2022 (LIGHTING) | 7 of 7 | $798,043 | +46% |
| 28 JAN 2021 | 210073 | District 3 | D03-LG FY2021 (LIGHTING) | 4 of 4 | $295,740 | +110% |
| 15 OCT 2020 | 200507 | District 3 | D03-TSG FY2021 (SIGNALIZATION) | 5 of 5 | $190,641 | +91% |
| 01 OCT 2020 | 200484 | District 2 | D02-LG FY2021 (LIGHTING) | 2 of 2 | $377,130 | +3.0% |
| 17 SEP 2020 | 200452 | ATB | ATB-IR 90-25.59 (LIGHTING) | 5 of 5 | $495,718 | +55% |
| 04 JUN 2020 | 200324 | MOT | MOT-SR 725/SR 741-14.85/02.93 (SIGNING) | 5 of 5 | $890,576 | +89% |
| 07 MAY 2020 | 203002 | HAM | HAM-/CLE-IR 275-10.57/32.21/10.36 (MISCELLANEOUS) | 4 of 4 | $5,225,500 | +46% |
| 26 MAR 2020 | 200171 | HAM | HAM-US 27-11.03 TSMO Pilot (SIGNALIZATION) | 7 of 7 | $553,861 | +27% |
| 27 FEB 2020 | 200119 | MAH | MAH-LG FY2020 (LIGHTING) | 7 of 7 | $1,170,687 | +82% |
| 23 JAN 2020 | 200014 | HAM | HAM-CR 453/SR 126-00.32/06.78 (GUARDRAIL REBUILDING) | 5 of 5 | $2,366,763 | +40% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.