Lake Erie Construction Company: ODOT bid record
Lake Erie Construction Company submitted 210 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 114 of them (54%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $128,309,495
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 34 | 21 | 62% |
| 2021 | 36 | 19 | 53% |
| 2022 | 26 | 16 | 62% |
| 2023 | 30 | 17 | 57% |
| 2024 | 32 | 17 | 53% |
| 2025 | 31 | 14 | 45% |
| 2026 | 21 | 10 | 48% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 4 | 18 | 15 | 83% |
| District 10 | 14 | 5 | 36% |
| District 3 | 14 | 9 | 64% |
| District 5 | 13 | 9 | 69% |
| CUY | 10 | 2 | 20% |
| District 8 | 10 | 7 | 70% |
| District 9 | 10 | 2 | 20% |
| FRA | 9 | 1 | 11% |
| District 7 | 9 | 6 | 67% |
| District 6 | 9 | 8 | 89% |
| District 2 | 9 | 9 | 100% |
| District 12 | 8 | 5 | 63% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 101 | 101 (100%) | $1.00 | $1.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 101 | 88 (87%) | $60.00 | $80.00 |
| Guardrail removed | 202E38000 | FT | 75 | 47 (63%) | $2.00 | $2.50 |
| Water | 659E35000 | MGAL | 45 | 40 (89%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 43 | 35 (81%) | $375.00 | $850.00 |
| Anchor assembly rebuilt, MGS type E, as per plan | 606E27861 | EACH | 40 | 33 (83%) | $297.50 | $320.00 |
| Lime | 659E31000 | ACRE | 39 | 31 (79%) | $50.00 | $150.00 |
| Anchor assembly, misc.: deep beam guardrail, 12 GA | 606E99200 | EACH | 42 | 30 (71%) | $392.50 | $397.50 |
| Bridge terminal assembly rebuilt, type 1, as per plan | 606E35011 | EACH | 38 | 29 (76%) | $235.00 | $225.00 |
| Anchor assembly, type T | 606E26500 | EACH | 41 | 27 (66%) | $840.00 | $1,000.00 |
| Special - reshaping berm | 606E50000 | FT | 40 | 27 (68%) | $0.70 | $0.60 |
| Guardrail, type MGS | 606E15050 | FT | 69 | 26 (38%) | $19.20 | $22.73 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| M P Dory Co | 111 | 48 of 111 |
| Cuyahoga Fence LLC | 44 | 16 of 44 |
| PDK Construction Inc | 37 | 22 of 37 |
| Cleveland Barricading Systems LLC | 32 | 15 of 32 |
| A & A Safety Inc | 10 | 4 of 10 |
| RMD Holdings LTD | 4 | 2 of 4 |
| Trafftech Inc | 4 | 1 of 4 |
| Shelly & Sands Inc | 4 | 2 of 4 |
| Hydratech Engineered Products LLC | 3 | 2 of 3 |
| Perram Electric Inc | 3 | 1 of 3 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260499 | DEL | DEL-/UNI-SIGN-FY2027 (SIGNING) | 2 of 3 | $667,950 | +62% |
| 12 NOV 2026 | 260522 | MUS | MUS-Flat Sheet Signs 2027 (SIGNING) | 2 of 2 | $2,312,375 | +13% |
| 15 OCT 2026 | 260478 | District 4 | D04-SIGN FY2027 (Systematic) (SIGNING) | 1 of 1 | $2,234,325 | Low |
| 01 OCT 2026 | 260446 | District 9 | D09-Guardrail Project FY2027 (GUARDRAIL REBUILDING) | 3 of 4 | $1,143,225 | +20% |
| 17 SEP 2026 | 260415 | District 3 | D03-GR FY2027 (GUARDRAIL REBUILDING) | 1 of 2 | $1,112,320 | Low, 5.0% under the second |
| 27 AUG 2026 | 260397 | TRU | TRU-GR FY2027 (Systematic) (GUARDRAIL REBUILDING) | 2 of 2 | $751,675 | +3.0% |
| 13 AUG 2026 | 260374 | District 2 | D02-GR FY2027 (GUARDRAIL REBUILDING) | 1 of 1 | $1,675,575 | Low |
| 16 JUL 2026 | 260336 | District 5 | D05-GR FY2027 (Ding N Dent) (GUARDRAIL REBUILDING) | 1 of 2 | $1,177,325 | Low, 10% under the second |
| 11 JUN 2026 | 260289 | PER | PER-CR VAR GR FY2027 (GUARDRAIL REBUILDING) | 3 of 3 | $314,875 | +26% |
| 11 JUN 2026 | 260295 | District 6 | D06-GR-FY2027 (GUARDRAIL REBUILDING) | 1 of 2 | $836,420 | Low, 8.0% under the second |
| 11 JUN 2026 | 260296 | District 7 | D07-GR Maint FY27 (GUARDRAIL REBUILDING) | 1 of 1 | $1,068,595 | Low |
| 11 JUN 2026 | 260298 | District 8 | D08-GR FY2027 (GUARDRAIL REBUILDING) | 1 of 1 | $1,925,725 | Low |
| 11 JUN 2026 | 260300 | FRA | FRA-GR-FY2027 (GUARDRAIL REBUILDING) | 2 of 2 | $2,305,625 | +24% |
| 26 MAR 2026 | 260146 | District 12 | D12-GR FY2026 (GUARDRAIL REBUILDING) | 1 of 1 | $2,388,850 | Low |
| 26 MAR 2026 | 260159 | CUY | CUY-SIGN FY2026 (SIGNING) | 1 of 1 | $477,480 | Low |
| 19 FEB 2026 | 260082 | District 10 | D10-Extrusheet Sign FY2026 (SIGNING) | 2 of 2 | $1,191,350 | +11% |
| 19 FEB 2026 | 260083 | District 11 | D11-GR-FY2026 (GUARDRAIL REBUILDING) | 1 of 1 | $4,038,120 | Low |
| 29 JAN 2026 | 260073 | District 9 | D09-GR-FY2026 (GUARDRAIL REBUILDING) | 2 of 3 | $1,024,725 | +12% |
| 29 JAN 2026 | 260075 | LIC | LIC-IR 70-01.95 (NOISE WALLS) | 5 of 5 | $124,380 | +67% |
| 15 JAN 2026 | 260030 | WYA | WYA-US 23-09.28 (SIGNING) | 2 of 3 | $318,425 | +26% |
| 15 JAN 2026 | 260034 | District 3 | D03-SYSSIGN FY2026 (SIGNING) | 2 of 2 | $576,480 | +10% |
| 18 DEC 2025 | 250584 | District 5 | D05-Guardrail FY2026 (GUARDRAIL REBUILDING) | 1 of 2 | $2,887,120 | Low, 4.0% under the second |
| 18 DEC 2025 | 250602 | District 3 | D03-GR FY2026 (GUARDRAIL REBUILDING) | 1 of 2 | $1,023,825 | Low, 7.0% under the second |
| 18 DEC 2025 | 250604 | District 7 | D07-GR FY 2026 (GUARDRAIL REBUILDING) | 2 of 2 | $514,820 | +1.0% |
| 13 NOV 2025 | 250523 | HAM | HAM-IR 74-00.00 Cable (GUARDRAIL REBUILDING) | 2 of 3 | $1,887,925 | +42% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.