Lake Erie Construction Company: ODOT bid record

Lake Erie Construction Company submitted 210 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 114 of them (54%). When it was not low, its total sat a median +12% above the low bid.

Owner
Ohio DOT
Low bid volume
$128,309,495
Latest bid
12 NOV 2026
Data through
12 NOV 2026
210Bids
114Low bids
54Win rate, percent
+12%Median gap to the low bid when not low, 96 bids

By year

YearBidsLow bidsWin rate
2020342162%
2021361953%
2022261662%
2023301757%
2024321753%
2025311445%
2026211048%
Lake Erie Construction Company, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
District 4181583%
District 1014536%
District 314964%
District 513969%
CUY10220%
District 810770%
District 910220%
FRA9111%
District 79667%
District 69889%
District 299100%
District 128563%
Lake Erie Construction Company, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH101101 (100%)$1.00$1.00
Law enforcement officer with patrol car for assistance614E11110HR10188 (87%)$60.00$80.00
Guardrail removed202E38000FT7547 (63%)$2.00$2.50
Water659E35000MGAL4540 (89%)$1.00$1.00
Commercial fertilizer659E20000TON4335 (81%)$375.00$850.00
Anchor assembly rebuilt, MGS type E, as per plan606E27861EACH4033 (83%)$297.50$320.00
Lime659E31000ACRE3931 (79%)$50.00$150.00
Anchor assembly, misc.: deep beam guardrail, 12 GA606E99200EACH4230 (71%)$392.50$397.50
Bridge terminal assembly rebuilt, type 1, as per plan606E35011EACH3829 (76%)$235.00$225.00
Anchor assembly, type T606E26500EACH4127 (66%)$840.00$1,000.00
Special - reshaping berm606E50000FT4027 (68%)$0.70$0.60
Guardrail, type MGS606E15050FT6926 (38%)$19.20$22.73
Lake Erie Construction Company, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
M P Dory Co11148 of 111
Cuyahoga Fence LLC4416 of 44
PDK Construction Inc3722 of 37
Cleveland Barricading Systems LLC3215 of 32
A & A Safety Inc104 of 10
RMD Holdings LTD42 of 4
Trafftech Inc41 of 4
Shelly & Sands Inc42 of 4
Hydratech Engineered Products LLC32 of 3
Perram Electric Inc31 of 3
Lake Erie Construction Company, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260499DELDEL-/UNI-SIGN-FY2027 (SIGNING)2 of 3$667,950+62%
12 NOV 2026260522MUSMUS-Flat Sheet Signs 2027 (SIGNING)2 of 2$2,312,375+13%
15 OCT 2026260478District 4D04-SIGN FY2027 (Systematic) (SIGNING)1 of 1$2,234,325Low
01 OCT 2026260446District 9D09-Guardrail Project FY2027 (GUARDRAIL REBUILDING)3 of 4$1,143,225+20%
17 SEP 2026260415District 3D03-GR FY2027 (GUARDRAIL REBUILDING)1 of 2$1,112,320Low, 5.0% under the second
27 AUG 2026260397TRUTRU-GR FY2027 (Systematic) (GUARDRAIL REBUILDING)2 of 2$751,675+3.0%
13 AUG 2026260374District 2D02-GR FY2027 (GUARDRAIL REBUILDING)1 of 1$1,675,575Low
16 JUL 2026260336District 5D05-GR FY2027 (Ding N Dent) (GUARDRAIL REBUILDING)1 of 2$1,177,325Low, 10% under the second
11 JUN 2026260289PERPER-CR VAR GR FY2027 (GUARDRAIL REBUILDING)3 of 3$314,875+26%
11 JUN 2026260295District 6D06-GR-FY2027 (GUARDRAIL REBUILDING)1 of 2$836,420Low, 8.0% under the second
11 JUN 2026260296District 7D07-GR Maint FY27 (GUARDRAIL REBUILDING)1 of 1$1,068,595Low
11 JUN 2026260298District 8D08-GR FY2027 (GUARDRAIL REBUILDING)1 of 1$1,925,725Low
11 JUN 2026260300FRAFRA-GR-FY2027 (GUARDRAIL REBUILDING)2 of 2$2,305,625+24%
26 MAR 2026260146District 12D12-GR FY2026 (GUARDRAIL REBUILDING)1 of 1$2,388,850Low
26 MAR 2026260159CUYCUY-SIGN FY2026 (SIGNING)1 of 1$477,480Low
19 FEB 2026260082District 10D10-Extrusheet Sign FY2026 (SIGNING)2 of 2$1,191,350+11%
19 FEB 2026260083District 11D11-GR-FY2026 (GUARDRAIL REBUILDING)1 of 1$4,038,120Low
29 JAN 2026260073District 9D09-GR-FY2026 (GUARDRAIL REBUILDING)2 of 3$1,024,725+12%
29 JAN 2026260075LICLIC-IR 70-01.95 (NOISE WALLS)5 of 5$124,380+67%
15 JAN 2026260030WYAWYA-US 23-09.28 (SIGNING)2 of 3$318,425+26%
15 JAN 2026260034District 3D03-SYSSIGN FY2026 (SIGNING)2 of 2$576,480+10%
18 DEC 2025250584District 5D05-Guardrail FY2026 (GUARDRAIL REBUILDING)1 of 2$2,887,120Low, 4.0% under the second
18 DEC 2025250602District 3D03-GR FY2026 (GUARDRAIL REBUILDING)1 of 2$1,023,825Low, 7.0% under the second
18 DEC 2025250604District 7D07-GR FY 2026 (GUARDRAIL REBUILDING)2 of 2$514,820+1.0%
13 NOV 2025250523HAMHAM-IR 74-00.00 Cable (GUARDRAIL REBUILDING)2 of 3$1,887,925+42%
Lake Erie Construction Company: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy