ODOT contract 260478 bid tabulation

D04-SIGN FY2027 (Systematic) (SIGNING). Let by Ohio DOT on October 15, 2026, District 4. 1 bid received; low bid $2,234,325 by Lake Erie Construction Company, +7.8% against the engineer's estimate of $2,073,000.

Owner
Ohio DOT
Letting
15 OCT 2026
Pay items
58
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Lake Erie Construction Company$2,234,325Low+8.0%
ODOT contract 260478: bids by rank

Engineer's estimate: $2,073,000.

Bid tabulation

LinePay itemUnitQuantity1. Lake Erie Construction Company
1Clearing and grubbing (201E11000)LS1$3,450.00
2Erosion control (832E30000)EACH3,000$1.00
3Ground mounted support, no. 2 post (630E02100)FT808$9.60
4Ground mounted support, no. 3 post, as per plan (630E03101)FT28,592$10.00
5Ground mounted support, no. 3 post, as per plan (630E03101)FT26$15.00
6Ground mounted support, no. 4 post, as per plan (630E04101)FT66$15.00
7Ground mounted structural beam support, W6X9 (630E06500)FT148$40.00
8Ground mounted structural beam support, W10X22 (630E07500)FT49$65.00
9Ground mounted structural beam support, W10X12 (630E07600)FT83$45.00
10One way support, no. 3 post (630E08004)FT228$14.00
11Sign post reflector (630E08600)EACH498$30.00
12Sign post reflector (630E08600)EACH509$30.00
13Sign post reflector (630E08600)EACH27$30.00
14Sign post reflector (630E08600)EACH439$30.00
15Breakaway structural beam connection (630E09000)EACH14$720.00
16Sign attachment assembly (630E75000)EACH238$685.00
17Sign hanger assembly, span wire (630E79000)EACH24$450.00
18Sign hanger assembly, mast arm (630E79100)EACH10$425.00
19Sign support assembly, pole mounted (630E79500)EACH103$95.00
20Sign support assembly, barrier mounted, as per plan (630E79611)EACH34$925.00
21Sign, flat sheet (630E80100)SF18,815$15.20
22Sign, flat sheet, as per plan (630E80101)SF199.50$16.00
23Sign, ground mounted extrusheet (630E80200)SF15,732$24.50
24Sign, overhead extrusheet (630E80224)SF12,387.30$24.00
25Sign backing assembly (630E82000)EACH163$180.00
26Ground mounted structural beam support foundation (630E84500)EACH14$1,220.00
27Removal of ground mounted sign and disposal (630E84900)EACH2,881$10.00
28Removal of ground mounted sign and reerection (630E85100)EACH52$75.00
29Removal of ground mounted sign and reerection, as per plan (630E85101)EACH23$70.00
30Removal of ground mounted major sign and disposal (630E85400)EACH148$315.00
31Removal of ground mounted post support and disposal (630E86002)EACH2,234$15.00
32Removal of ground mounted post support and disposal, as per plan (630E86003)EACH2$20.00
33Removal of ground mounted structural beam support (630E86102)EACH6$345.00
34Removal of ground mounted wooden box beam support (630E86292)EACH8$235.00
35Removal of overhead mounted sign and reerection (630E87100)EACH3$525.00
36Removal of overhead mounted sign and disposal (630E87400)EACH134$260.00
37Removal of pole mounted sign and disposal (630E87500)EACH106$35.00
38Removal of overhead sign support and disposal, as per plan (630E89703)EACH1$3,450.00
39Signing, misc.:mile marker relocation (630E97700)EACH157$20.00
40Law enforcement officer with patrol car for assistance (614E11110)HR40$85.00
41Premium for contract performance bond and for payment bond (103E05000)LS1$12,450
42Maintaining traffic (614E11000)LS1$78,200
43Field office, type B (619E16010)MNTH6$500.00
44Construction layout stakes and surveying (623E10000)LS1$28,450
45Mobilization (624E10000)LS1$52,500
100Concrete barrier removed (202E30700)FT90$300.00
101Concrete barrier, single slope, type B1 (622E10100)FT90$535.00
102Barrier reflector, type 1, 1 way (626E00102)EACH2$6.00
103Overhead sign support, type TC-15.116, design 3 (630E72430)EACH1$138,150
104Foundation, type TC-21.11 (630E83900)EACH1$14,250
105Overhead sign support foundation, concrete median barrier, type TC-21.50, dual shaft (630E84030)EACH1$21,350
106Lane line, 6", type 1 (642E00204)MI0.27$8,250.00
107Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380)EACH2$3,275.00
108Barrier reflector, type 1, 1WAY (614E13310)EACH16$6.00
109Object marker, one way (614E13350)EACH16$12.00
110Work zone edge line, class III, 6", 642 paint (614E22360)MI0.17$6,850.00
111Work zone dotted line, class III, 6", 642 paint (614E24612)FT780$1.25
112Portable barrier, unanchored (622E41100)FT720$30.00
ODOT contract 260478: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of October 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy