ODOT letting results, October 15, 2026
19 contracts let by Ohio DOT on October 15, 2026, $41,169,170 in low bids, a median of 2 bidders per contract. On the 19 with an engineer's estimate, the low bid came in under it 8 times; median low bid +3.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 19
- Low bids, total
- $41,169,170
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 260426 | LAK-US 20-00.04 Wickliffe (TWO LANE RESURFACING) | LAK | 5 | Geauga Highway Co | $6,840,917 | $6,861,867 | 0.0% | +8.0% | ODOT |
| 260473 | TUS-IR 77-04.02 (FOUR LANE RESURFACING) | TUS | 2 | Shelly & Sands Inc | $5,316,970 | $5,545,603 | +4.0% | +10% | ODOT |
| 260464 | WOO-/HEN-SR 18/SR 64/SR 582-00.00/09.18/05.35 (TWO LANE RESURFACING) | WOO | 2 | Gerken Paving Inc | $4,217,030 | $4,520,727 | +7.0% | -2.0% | ODOT |
| 260484 | GAL-US 35 Rest Areas TP (PARKING AREAS) | GAL | 3 | Allard Excavation LLC | $3,951,942 | $4,228,003 | +7.0% | 0.0% | ODOT |
| 260466 | JAC-SR 32-12.47 (FOUR LANE RESURFACING) | JAC | 2 | Shelly & Sands Inc | $3,318,009 | $3,934,074 | +19% | +3.0% | ODOT |
| 260472 | ROS-SR 159-03.47 (TWO LANE RESURFACING) | ROS | 3 | Fillmore Construction | $2,378,318 | $2,476,766 | +4.0% | +15% | ODOT |
| 260478 | D04-SIGN FY2027 (Systematic) (SIGNING) | District 4 | 1 | Lake Erie Construction Company | $2,234,325 | +8.0% | ODOT | ||
| 260463 | HAR-SR 81-00.00/03.98 (TWO LANE RESURFACING) | HAR | 2 | Shelly Company | $1,905,470 | $1,989,542 | +4.0% | -12% | ODOT |
| 260470 | MOT-SR 48-00.00/17.05 (TWO LANE RESURFACING) | MOT | 2 | Barrett Paving Materials Inc | $1,842,400 | $2,141,838 | +16% | +4.0% | ODOT |
| 260483 | D12-ITS MAINT-FY2027 (SIGNALIZATION) | District 12 | 1 | Miller Cable Company | $1,579,237 | +41% | ODOT | ||
| 260457 | COL-SR 518-06.69 (TWO LANE RESURFACING) | COL | 4 | Shelly & Sands Inc | $1,403,113 | $1,675,434 | +19% | -14% | ODOT |
| 260485 | MOT-BS-FY27 (BRIDGE REPAIR) | MOT | 2 | Aad Contracting Inc | $1,334,577 | $1,598,191 | +20% | -6.0% | ODOT |
| 260482 | D11-DS-FY2027 (BRIDGE REPAIR) | District 11 | 4 | Aad Contracting Inc | $1,224,789 | $1,294,132 | +6.0% | -15% | ODOT |
| 260462 | HAM-US 42-09.73/12.29 (FOUR LANE RESURFACING) | HAM | 2 | Barrett Paving Materials Inc | $1,030,900 | $1,170,712 | +14% | +9.0% | ODOT |
| 260460 | GRE-IR 675-09.41 (SPOT PATCHING / PAVEMENT REPAIR) | GRE | 2 | John R Jurgensen Company | $682,880 | $915,995 | +34% | +63% | ODOT |
| 260480 | D05-PM FY2027 (C) R-WR (PAVEMENT MARKING) | District 5 | 2 | Griffin Pavement Striping LLC | $569,451 | $765,347 | +34% | +5.0% | ODOT |
| 260479 | D05-CS FY2027 (CRACK SEALING) | District 5 | 3 | Scodeller Construction Inc | $546,123 | $824,582 | +51% | -19% | ODOT |
| 260481 | D09-BH-FY2027 (BRIDGE REPAIR) | District 9 | 1 | Axis Civil Construction LLC | $439,985 | -2.0% | ODOT | ||
| 268020 | COL-PR-FY2027 (PRUNING/OR TREE/BRUSH REMOVAL) | COL | 2 | Russell Tree Experts | $352,733 | $1,065,868 | +202% | -10% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.