ODOT contract 260470 bid tabulation
MOT-SR 48-00.00/17.05 (TWO LANE RESURFACING). Let by Ohio DOT on October 15, 2026, MOT. 2 bids received; low bid $1,842,400 by Barrett Paving Materials Inc, +3.6% against the engineer's estimate of $1,779,000.
- Owner
- Ohio DOT
- Letting
- 15 OCT 2026
- Pay items
- 44
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Barrett Paving Materials Inc | $1,842,400 | Low | +4.0% |
| 2 | John R Jurgensen Company | $2,141,838 | +16% | +20% |
Engineer's estimate: $1,779,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Barrett Paving Materials Inc | 2. John R Jurgensen Company |
|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 382 | $20.00 | $20.00 |
| 2 | Curb and gutter removed (202E32500) | FT | 46 | $40.00 | $40.00 |
| 3 | 4" concrete walk (608E10000) | SF | 150 | $25.00 | $25.00 |
| 4 | Curb ramp (608E52000) | SF | 296 | $25.00 | $25.00 |
| 5 | Detectable warning (608E53020) | SF | 80 | $80.00 | $80.00 |
| 6 | Monument assembly adjusted to grade (623E39500) | EACH | 19 | $750.00 | $1,106.67 |
| 7 | Seeding and mulching, class 1 (659E00500) | SY | 8 | $80.00 | $92.52 |
| 8 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 9 | Manhole adjusted to grade (611E99654) | EACH | 40 | $750.00 | $1,425.42 |
| 10 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 1,100 | $83.00 | $147.62 |
| 11 | Pavement repair, as per plan (253E01001) | SY | 10 | $400.00 | $300.00 |
| 12 | Pavement planing, asphalt concrete 1 1/2" depth (254E01000) | SY | 93,271 | $3.00 | $3.12 |
| 13 | Patching planed surface, as per plan (254E01601) | SY | 220 | $5.00 | $6.97 |
| 14 | Non-tracking tack coat (407E20000) | GAL | 7,928 | $3.00 | $5.00 |
| 15 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 3,889 | $255.00 | $297.05 |
| 16 | Compacted aggregate (617E10100) | CY | 67 | $200.00 | $401.61 |
| 17 | Valve box adjusted to grade (638E10800) | EACH | 22 | $350.00 | $937.12 |
| 18 | RPM (621E00100) | EACH | 644 | $47.32 | $47.32 |
| 19 | Raised pavement marker removed (621E54000) | EACH | 644 | $6.00 | $16.19 |
| 20 | Edge line, 6" (644E00104) | MI | 2.95 | $3,400.00 | $3,400.00 |
| 21 | Lane line, 6" (644E00204) | MI | 4.08 | $1,700.00 | $1,700.00 |
| 22 | Center line (644E00300) | MI | 3.61 | $5,700.00 | $5,700.00 |
| 23 | Channelizing line, 8" (644E00400) | FT | 3,297 | $2.59 | $2.59 |
| 24 | Stop line (644E00500) | FT | 556 | $8.00 | $8.00 |
| 25 | Crosswalk line, 12" (644E00620) | FT | 1,687 | $5.00 | $5.00 |
| 26 | Transverse/diagonal line (644E00700) | FT | 474 | $8.00 | $8.00 |
| 27 | Lane arrow (644E01300) | EACH | 56 | $100.00 | $100.00 |
| 28 | Lane arrow (644E01300) | EACH | 2 | $322.00 | $322.00 |
| 29 | Dotted line, 4" (644E01500) | FT | 211 | $3.50 | $3.50 |
| 30 | Dotted line, 4" (644E01500) | FT | 226 | $3.50 | $3.50 |
| 31 | Detector loop, as per plan (632E26501) | EACH | 1 | $1,800.00 | $2,350.00 |
| 32 | Loop detector tie in, as per plan (632E27201) | EACH | 1 | $100.00 | $150.00 |
| 33 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 120 | $100.00 | $132.52 |
| 34 | Work zone marking sign (614E12460) | EACH | 19 | $93.53 | $125.00 |
| 35 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 8.16 | $1,051.00 | $1,051.00 |
| 36 | Work zone center line, class III, 642 paint (614E21550) | MI | 7.22 | $2,753.00 | $2,753.00 |
| 37 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 3,674 | $1.00 | $1.00 |
| 38 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 422 | $1.00 | $1.00 |
| 39 | Work zone dotted line, class III, 4", 642 paint (614E24610) | FT | 452 | $1.00 | $1.00 |
| 40 | Work zone stop line, class III, 642 paint (614E26610) | FT | 288 | $5.00 | $5.00 |
| 41 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 42 | $25.00 | $25.00 |
| 42 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,651.30 | $7,049.59 |
| 43 | Maintaining traffic (614E11000) | LS | 1 | $155,000 | $59,963 |
| 44 | Mobilization (624E10000) | LS | 1 | $40,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.