ODOT contract 260426 bid tabulation
LAK-US 20-00.04 Wickliffe (TWO LANE RESURFACING). Let by Ohio DOT on October 15, 2026, LAK. 5 bids received; low bid $6,840,917 by Geauga Highway Co, +7.9% against the engineer's estimate of $6,342,000.
- Owner
- Ohio DOT
- Letting
- 15 OCT 2026
- Pay items
- 92
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Geauga Highway Co | $6,840,917 | Low | +8.0% |
| 2 | Perk Company Inc | $6,861,867 | 0.0% | +8.0% |
| 3 | Ronyak Paving Inc | $6,902,358 | +1.0% | +9.0% |
| 4 | Karvo Companies Inc | $7,515,000 | +10% | +18% |
| 5 | Anthony Allega Cement Contractor Inc | $7,834,442 | +15% | +24% |
Engineer's estimate: $6,342,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Geauga Highway Co | 2. Perk Company Inc | 3. Ronyak Paving Inc | 4. Karvo Companies Inc | 5. Anthony Allega Cement Contractor Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Pavement removed, as per plan (202E23001) | SY | 1,927 | $18.00 | $24.00 | $25.00 | $20.00 | $43.32 |
| 2 | Walk removed, as per plan (202E30001) | SF | 44,244 | $3.75 | $2.25 | $3.00 | $2.65 | $3.50 |
| 3 | Curb removed, as per plan (202E32001) | FT | 6,713 | $6.00 | $8.00 | $10.00 | $10.00 | $9.95 |
| 4 | Subgrade compaction (204E10000) | SY | 500 | $3.00 | $1.00 | $1.00 | $2.00 | $5.06 |
| 5 | Geotextile fabric, as per plan (204E50001) | SY | 500 | $5.00 | $1.00 | $2.00 | $4.00 | $3.71 |
| 6 | 4" concrete walk, as per plan (608E10001) | SF | 23,648 | $12.00 | $14.00 | $9.00 | $14.00 | $17.77 |
| 7 | Curb ramp, as per plan (608E52001) | SF | 12,953 | $21.00 | $30.00 | $28.00 | $24.00 | $19.13 |
| 8 | Detectable warning (608E53020) | SF | 53 | $55.00 | $100.00 | $75.00 | $25.00 | $84.04 |
| 9 | Walkway, misc.:brick paver walk (608E98000) | SF | 8,412 | $25.00 | $27.90 | $30.00 | $23.63 | $46.50 |
| 10 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 25 | $650.00 | $1,100.00 | $1,250.00 | $500.00 | $1,024.89 |
| 11 | Monument assembly reconstructed to grade, as per plan (623E39601) | EACH | 4 | $1,100.00 | $1,200.00 | $1,500.00 | $1,500.00 | $1,527.64 |
| 12 | Topsoil (659E00300) | CY | 333 | $150.00 | $62.00 | $70.00 | $75.00 | $68.26 |
| 13 | Seeding and mulching, class 1, as per plan (659E00501) | SY | 3,000 | $10.00 | $8.00 | $2.00 | $5.00 | $4.51 |
| 14 | Water (659E35000) | MGAL | 16 | $250.00 | $187.00 | $10.00 | $5.00 | $204.77 |
| 15 | Erosion control, as per plan (832E30001) | EACH | 30,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | 6" unclassified pipe underdrains with geotextile fabric, as per plan (605E13411) | FT | 200 | $30.00 | $25.00 | $17.00 | $5.00 | $42.41 |
| 17 | Catch basin adjusted to grade, as per plan (611E98631) | EACH | 85 | $1,225.00 | $1,500.00 | $1,250.00 | $1,700.00 | $1,215.07 |
| 18 | Catch basin reconstructed to grade, as per plan (611E98635) | EACH | 10 | $1,950.00 | $1,600.00 | $2,000.00 | $2,500.00 | $2,240.96 |
| 19 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 107 | $1,225.00 | $1,500.00 | $1,000.00 | $1,350.00 | $1,386.25 |
| 20 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 10 | $1,950.00 | $1,600.00 | $1,775.00 | $1,800.00 | $2,854.07 |
| 21 | Special - miscellaneous metal (611E99820) | LB | 20,000 | $3.00 | $5.00 | $4.00 | $2.25 | $2.29 |
| 22 | Partial depth pavement repair (441), as per plan (251E01001) | SY | 600 | $38.00 | $51.04 | $80.00 | $75.00 | $97.20 |
| 23 | Pavement repair, misc.: undercutting subgrade and (253E90000) | CY | 300 | $130.00 | $100.00 | $65.00 | $25.00 | $259.13 |
| 24 | Pavement planing, asphalt concrete, as per plan, T (254E01001) | SY | 85,687 | $6.91 | $3.03 | $5.00 | $8.00 | $4.10 |
| 25 | Pavement planing, portland cement concrete, T = 3- (254E01010) | SY | 4,620 | $3.50 | $4.38 | $6.00 | $8.00 | $13.65 |
| 26 | Tack coat, 702.13 (407E13900) | GAL | 5,153 | $3.25 | $4.51 | $2.00 | $3.50 | $3.71 |
| 27 | Non-tracking tack coat (407E20000) | GAL | 7,729 | $3.25 | $4.46 | $2.00 | $3.50 | $3.71 |
| 28 | Asphalt concrete surface course, type 1, (448), as per plan (441E50101) | CY | 3,298 | $260.00 | $311.96 | $275.00 | $270.00 | $294.88 |
| 29 | Asphalt concrete intermediate course, type 2, (448), as per plan (441E50301) | CY | 4,175 | $225.00 | $243.92 | $230.00 | $255.00 | $283.95 |
| 30 | 10" reinforced concrete pavement, class QC 1P, as per plan (451E15011) | SY | 1,029 | $165.00 | $200.00 | $155.00 | $125.00 | $193.16 |
| 31 | 6" non-reinforced concrete pavement, class QC MS, as per plan (452E10051) | SY | 17 | $125.00 | $200.00 | $145.00 | $125.00 | $181.09 |
| 32 | 8" non-reinforced concrete pavement, class QC MS, as per plan (452E12051) | SY | 882 | $140.00 | $165.00 | $155.00 | $100.00 | $203.04 |
| 33 | Curb, type 6, as per plan (609E26001) | FT | 4,612 | $42.00 | $30.00 | $50.00 | $65.00 | $48.82 |
| 34 | Special - pavement reinforcing fabric (690E12030) | SY | 85,863 | $5.69 | $5.55 | $4.50 | $5.75 | $5.70 |
| 35 | Void reducing asphalt membrane (vram) (872E10000) | FT | 34,663 | $3.50 | $2.00 | $1.00 | $2.75 | $2.18 |
| 36 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 10 | $1,225.00 | $1,500.00 | $1,135.00 | $1,350.00 | $1,388.31 |
| 37 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 5 | $1,950.00 | $1,600.00 | $2,000.00 | $1,700.00 | $2,854.04 |
| 38 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 173 | $650.00 | $1,200.00 | $750.00 | $850.00 | $1,100.00 |
| 39 | Service box adjusted to grade, as per plan (638E10901) | EACH | 10 | $650.00 | $100.00 | $450.00 | $500.00 | $393.55 |
| 40 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 79 | $1,225.00 | $1,500.00 | $1,200.00 | $1,350.00 | $1,385.95 |
| 41 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 10 | $1,950.00 | $1,600.00 | $2,000.00 | $1,700.00 | $2,854.07 |
| 42 | Manhole adjusted to grade, as per plan (611E99655) | EACH | 3 | $1,225.00 | $1,500.00 | $1,500.00 | $1,350.00 | $1,386.05 |
| 43 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 1 | $1,950.00 | $1,600.00 | $2,500.00 | $1,700.00 | $2,854.14 |
| 44 | Detector loop, as per plan (632E26501) | EACH | 59 | $1,735.59 | $1,700.00 | $1,700.00 | $2,100.00 | $1,856.62 |
| 45 | Edge line, 6" (646E10010) | MI | 0.03 | $3,590.00 | $5,400.00 | $5,400.00 | $2,850.00 | $3,112.67 |
| 46 | Lane line, 4" (646E10100) | MI | 6.32 | $1,995.00 | $3,200.00 | $3,200.00 | $995.00 | $1,086.67 |
| 47 | Center line (646E10200) | MI | 3.33 | $4,447.00 | $6,100.00 | $6,100.00 | $3,375.00 | $3,685.94 |
| 48 | Channelizing line, 8" (646E10300) | FT | 1,525 | $1.55 | $2.10 | $2.10 | $1.50 | $1.64 |
| 49 | Stop line (646E10400) | FT | 1,165 | $12.00 | $14.00 | $14.00 | $12.00 | $13.11 |
| 50 | Crosswalk line, 12" (646E10510) | FT | 6,369 | $5.00 | $7.00 | $7.00 | $6.50 | $7.10 |
| 51 | Transverse/diagonal line (646E10600) | FT | 330 | $8.00 | $9.00 | $9.00 | $10.00 | $10.92 |
| 52 | Island marking (646E10800) | SF | 211 | $8.00 | $5.00 | $5.00 | $6.25 | $6.83 |
| 53 | School symbol marking, 72" (646E20100) | EACH | 4 | $590.00 | $950.00 | $950.00 | $600.00 | $655.28 |
| 54 | Lane arrow (646E20300) | EACH | 16 | $165.00 | $185.00 | $185.00 | $165.00 | $180.20 |
| 55 | Word on pavement, 72" (646E20400) | EACH | 8 | $180.00 | $195.00 | $195.00 | $175.00 | $191.12 |
| 56 | Dotted line, 4" (646E20502) | FT | 213 | $3.00 | $5.00 | $5.00 | $2.00 | $2.18 |
| 57 | Crosswalk line, 24", type A125 (647E20076) | FT | 1,701 | $18.50 | $20.00 | $20.00 | $16.00 | $17.47 |
| 58 | Pull box, misc.: pull box removed and replaced to (625E31600) | EACH | 33 | $1,800.00 | $1,800.00 | $1,800.00 | $2,200.00 | $1,965.84 |
| 59 | Perennials, as per plan (see detail) (661E14001) | EACH | 1,890 | $27.71 | $25.95 | $25.95 | $26.00 | $28.34 |
| 60 | Deciduous tree, 6' height, as per plan, autumn bri (661E40021) | EACH | 48 | $1,685.79 | $553.00 | $553.00 | $553.00 | $603.95 |
| 61 | Planting, misc.: concrete planter (661E99900) | EACH | 135 | $876.00 | $1,661.40 | $1,100.00 | $500.00 | $988.34 |
| 62 | Special - trash receptacle (680E14550) | EACH | 9 | $767.00 | $1,355.00 | $1,100.00 | $800.00 | $1,322.10 |
| 63 | Special - 8' wood bench (680E17000) | EACH | 6 | $3,169.00 | $4,100.00 | $3,250.00 | $3,500.00 | $4,550.41 |
| 64 | Special - bicycle rack (690E50560) | EACH | 8 | $923.73 | $1,912.50 | $1,225.00 | $825.00 | $1,307.44 |
| 65 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 550 | $100.00 | $125.00 | $125.00 | $140.00 | $98.29 |
| 66 | Replacement sign (614E12500) | EACH | 5 | $250.00 | $200.00 | $500.00 | $240.00 | $261.41 |
| 67 | Portable changeable message sign, as per plan (614E18601) | SNMT | 18 | $950.00 | $1,000.00 | $1,100.00 | $1,100.00 | $1,130.28 |
| 68 | Work zone lane line, class I, 4", 642 paint (614E20100) | MI | 8.51 | $1,000.00 | $600.00 | $600.00 | $450.00 | $491.46 |
| 69 | Work zone lane line, class I, 4", 740.06, type I (614E20200) | MI | 0.60 | $3,500.00 | $3,800.00 | $3,800.00 | $4,725.90 | $5,161.30 |
| 70 | Work zone lane line, class III, 4", 642 paint (614E20550) | MI | 6.24 | $575.00 | $550.00 | $550.00 | $765.00 | $835.48 |
| 71 | Work zone center line, class I, 642 paint (614E21100) | MI | 13.20 | $2,000.00 | $1,800.00 | $1,800.00 | $1,505.00 | $1,643.66 |
| 72 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.91 | $17,500 | $15,775 | $15,775 | $14,974 | $16,354 |
| 73 | Work zone center line, class III, 642 paint (614E21550) | MI | 3.25 | $1,200.00 | $1,500.00 | $1,500.00 | $1,455.00 | $1,589.05 |
| 74 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 8.51 | $1,250.00 | $1,100.00 | $1,100.00 | $905.00 | $988.38 |
| 75 | Work zone edge line, class I, 4", 740.06, type I (614E22200) | MI | 0.71 | $8,750.00 | $6,300.00 | $6,300.00 | $9,217.51 | $10,067 |
| 76 | Work zone edge line, class III, 4", 642 paint (614E22350) | MI | 0.03 | $625.00 | $1,100.00 | $1,100.00 | $1,060.00 | $1,157.67 |
| 77 | Work zone channelizing line, class I, 8", 642 paint (614E23200) | FT | 2,480 | $1.25 | $1.05 | $1.05 | $0.65 | $0.71 |
| 78 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 1,365 | $0.65 | $0.95 | $0.95 | $0.60 | $0.66 |
| 79 | Work zone dotted line, class I, 4", 642 paint (614E24200) | FT | 1,025 | $1.50 | $3.00 | $3.00 | $0.55 | $0.60 |
| 80 | Work zone dotted line, class I, 4", 740.06, type I (614E24400) | FT | 650 | $2.25 | $5.00 | $5.00 | $13.50 | $14.74 |
| 81 | Work zone stop line, class I, 642 paint (614E26200) | FT | 2,070 | $6.50 | $5.50 | $5.50 | $3.50 | $3.82 |
| 82 | Work zone stop line, class III, 642 paint (614E26610) | FT | 1,035 | $3.00 | $5.00 | $5.00 | $3.45 | $3.77 |
| 83 | Work zone arrow, class I, 642 paint (614E30200) | EACH | 48 | $100.00 | $90.00 | $90.00 | $75.00 | $81.91 |
| 84 | Work zone arrow, class III, 642 paint (614E30650) | EACH | 16 | $55.00 | $90.00 | $90.00 | $70.00 | $76.45 |
| 85 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $42,240 | $67,000 | $40,560 | $94,936 | $31,307 |
| 86 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $417,500 | $192,350 | $400,000 | $512,502 | $346,313 |
| 87 | Field office, type C, as per plan (619E16021) | MNTH | 12 | $500.00 | $2,500.00 | $2,000.00 | $3,000.00 | $5,124.87 |
| 88 | Construction layout stakes and surveying (623E10000) | LS | 1 | $3,271.00 | $35,000 | $30,000 | $5,000.00 | $215,117 |
| 89 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $18,460 | $3,125.00 | $8,535.00 | $8,500.00 | $3,958.98 |
| 90 | Post construction survey monument verification and report (623E51000) | LS | 1 | $25,000 | $3,125.00 | $8,535.00 | $8,500.00 | $3,958.98 |
| 91 | Mobilization (624E10000) | LS | 1 | $158,000 | $42,206 | $355,000 | $352,696 | $198,685 |
| 100 | Asphalt concrete surface course, type 1, (448), PG64-22 (441E50000) | CY | 281 | $235.00 | $304.37 | $400.00 | $350.00 | $383.34 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 15, 2026. Compiled by Mirage Metrics.