Perk Company Inc: ODOT bid record

Perk Company Inc submitted 117 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 20 of them (17%). When it was not low, its total sat a median +20% above the low bid.

Owner
Ohio DOT
Low bid volume
$53,326,948
Latest bid
12 NOV 2026
Data through
12 NOV 2026
117Bids
20Low bids
17Win rate, percent
+20%Median gap to the low bid when not low, 97 bids

By year

YearBidsLow bidsWin rate
202019211%
202117424%
20229333%
202321419%
20241417%
202518317%
202619316%
Perk Company Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY571526%
District 12700%
LAK6117%
GEA500%
POR400%
FRA4125%
MED300%
LOR3133%
District 4200%
BEL200%
MEG200%
MOT2150%
Perk Company Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH8787 (100%)$1.00$1.00
Sign, flat sheet630E80100SF6942 (61%)$18.00$24.00
Removal of ground mounted sign and disposal630E84900EACH5626 (46%)$25.00$20.00
Ground mounted support, no. 3 post630E03100FT5526 (47%)$13.40$15.20
Removal of ground mounted post support and disposal630E86002EACH6223 (37%)$30.00$23.50
Commercial fertilizer659E20000TON5822 (38%)$1,000.00$850.00
Removal of pole mounted sign and disposal630E87500EACH2422 (92%)$20.00$25.00
Erosion control, as per plan832E30001EACH2222 (100%)$1.00$1.00
Ground mounted support, no. 2 post630E02100FT4221 (50%)$12.50$15.00
Lane arrow646E20300EACH2620 (77%)$175.00$175.00
Sign support assembly, pole mounted630E79500EACH2620 (77%)$75.00$145.00
Portable changeable message sign, as per plan614E18601SNMT7319 (26%)$1,100.00$950.00
Perk Company Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Karvo Companies Inc3923 of 39
Shelly & Sands Inc3121 of 31
Catts Construction Inc2316 of 23
Great Lakes Construction Co2113 of 21
Chagrin Valley Paving Inc168 of 16
Eclipse Co LLC159 of 15
Shelly Company156 of 15
Ronyak Paving Inc137 of 13
Tri-Mor Corp104 of 10
C A Agresta Construction Co106 of 10
Perk Company Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260501GEAGEA-SR 87-03.18 Replace (BRIDGE REPLACEMENT (1 BRIDGE))2 of 4$2,596,271+16%
12 NOV 2026260512TRUTRU-SR 534-22.36/26.04 (BRIDGE REPAIR)5 of 5$2,086,073+29%
15 OCT 2026260426LAKLAK-US 20-00.04 Wickliffe (TWO LANE RESURFACING)2 of 5$6,861,8670.0%
27 AUG 2026260382CUYCUY-East 66th Street TLCI (MINOR RECONSTRUCTION)1 of 3$8,636,872Low, 9.0% under the second
27 AUG 2026260391CUYCUY-IR 480-11.64 BH (BRIDGE REPAIR)3 of 6$585,320+35%
13 AUG 2026260353LORLOR-US 6/SR 611-06.86/VAR (BRIDGE REPAIR)2 of 2$3,891,947+7.0%
13 AUG 2026260371SUMSUM-SR 21-01.07 (BRIDGE REPAIR)9 of 9$2,625,158+40%
16 JUL 2026260328CUYCUY-/GEA BH FY2027 Misc (PART 1 AND PART 2) (BRIDGE REPAIR)3 of 4$9,519,749+8.0%
16 JUL 2026260339FRAFRA-IR 270/SR 665-SP-FY2027 (CONCRETE) (SPOT PATCHING / PAVEMENT REPAIR)2 of 2$1,996,586+2.0%
25 JUN 2026260307COSCOS-SR 93-19.20 (BRIDGE REPLACEMENT (1 BRIDGE))4 of 4$2,999,990+58%
25 JUN 2026260309CUYCUY-S. Waterloo Road (TWO LANE RESURFACING)2 of 3$1,296,628+2.0%
25 JUN 2026260310CUYCUY-SR 10-01.97 (FOUR LANE RESURFACING)2 of 4$4,595,464+5.0%
25 JUN 2026260311CUYCUY-Van Aken Blvd Resurfacing (FOUR LANE RESURFACING)1 of 4$1,007,100Low, 2.0% under the second
07 MAY 2026260232CUYCUY-Memorial Bridges Loop Trail (BIKEWAYS)1 of 3$1,924,944Low, 4.0% under the second
07 MAY 2026260235CUYCUY-SR 8-00.52 Pedestrian (SIDEWALK)4 of 6$1,204,428+34%
19 FEB 2026260084District 12D12-BH FY2026 Overlay (BRIDGE REPAIR)4 of 4$2,473,000+34%
29 JAN 2026260061MOTMOT-IR 75-10.44 & 10.78 (BRIDGE REPAIR)4 of 4$1,771,737+117%
29 JAN 2026260064PORPOR-SR 14/VAR-01.74/VAR (PART 1) (MINOR RECONSTRUCTION)2 of 2$6,283,380+20%
15 JAN 2026260010CUYCUY-IR 480-13.04 Ramps (MINOR RECONSTRUCTION)6 of 9$2,383,245+27%
18 DEC 2025250595PAUPAU-US 24-00.00 (SPOT PATCHING / PAVEMENT REPAIR)3 of 3$3,457,437+43%
04 DEC 2025250560LAKLAK-E 305th St. Resurface (FOUR LANE RESURFACING)3 of 5$2,742,151+3.0%
13 NOV 2025250545LOGLOG-US 33-17.82 (BRIDGE REPAIR)6 of 7$770,093+56%
09 OCT 2025250469MEDMED-US 224-15.27 (SPOT PATCHING / PAVEMENT REPAIR)2 of 4$2,030,000+14%
25 SEP 2025250438HENHEN-/LUC-US 24-15.86/-0.00 CPR (SPOT PATCHING / PAVEMENT REPAIR)7 of 8$4,294,210+25%
11 SEP 2025250413LAKLAK-IR 90-11.51 Deck (BRIDGE REPAIR)1 of 3$2,492,194Low, 4.0% under the second
Perk Company Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy