| 1 | Clearing and grubbing (201E11000) | LS | 1 | $30,300 | $24,650 |
| 2 | Approach slab removed (202E22900) | SY | 133 | $57.00 | $45.25 |
| 3 | Pavement removed (202E23000) | SY | 165 | $32.00 | $33.50 |
| 4 | Wearing course removed (202E23500) | SY | 777 | $19.00 | $8.35 |
| 5 | Curb removed (202E32000) | FT | 62 | $9.00 | $20.85 |
| 6 | Guardrail removed (202E38000) | FT | 200 | $5.00 | $7.30 |
| 7 | Bridge terminal assembly removed (202E47000) | EACH | 4 | $250.00 | $650.00 |
| 8 | Special - pipe cleanout over 48" (202E70130) | FT | 448 | $140.00 | $31.75 |
| 9 | Excavation (203E10000) | CY | 360 | $38.00 | $55.50 |
| 10 | Embankment (203E20000) | CY | 74 | $63.00 | $35.30 |
| 11 | Subgrade compaction (204E10000) | SY | 387 | $3.00 | $1.75 |
| 12 | Guardrail, type MGS (606E15050) | FT | 200 | $21.00 | $21.00 |
| 13 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 2 | $2,750.00 | $2,750.00 |
| 14 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 2 | $625.00 | $625.00 |
| 15 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,500.00 | $3,480.00 |
| 16 | Crushed aggregate slope protection (601E20010) | CY | 204 | $126.00 | $210.00 |
| 17 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 4 | $130.00 | $133.00 |
| 18 | Soil analysis test (659E00100) | EACH | 2 | $400.00 | $500.00 |
| 19 | Topsoil (659E00300) | CY | 33 | $101.00 | $100.00 |
| 20 | Seeding and mulching (659E10000) | SY | 283 | $5.50 | $3.00 |
| 21 | Repair seeding and mulching (659E14000) | SY | 10 | $7.00 | $1.00 |
| 22 | Inter-seeding (659E15000) | SY | 10 | $7.00 | $1.00 |
| 23 | Commercial fertilizer (659E20000) | TON | 0.05 | $1,500.00 | $1,000.00 |
| 24 | Lime (659E31000) | ACRE | 0.07 | $1.00 | $1,000.00 |
| 25 | Water (659E35000) | MGAL | 1.60 | $60.00 | $70.00 |
| 26 | Erosion control (832E30000) | EACH | 19,500 | $1.00 | $1.00 |
| 27 | Concrete masonry (602E20000) | CY | 0.21 | $6,000.00 | $4,580.00 |
| 28 | Aggregate drains (605E31100) | FT | 55 | $20.00 | $14.85 |
| 29 | 12" conduit, type C (611E04600) | FT | 13 | $260.00 | $166.00 |
| 30 | Catch basin, no. 3A (611E98180) | EACH | 1 | $5,950.00 | $4,655.00 |
| 31 | Precast reinforced concrete outlet (611E99710) | EACH | 2 | $460.00 | $450.00 |
| 32 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 37 | $440.00 | $850.00 |
| 33 | Aggregate base (304E20000) | CY | 66 | $120.00 | $94.00 |
| 34 | Non-tracking tack coat (407E20000) | GAL | 17 | $2.00 | $85.00 |
| 35 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 6 | $650.00 | $2,500.00 |
| 36 | Asphalt concrete intermediate course, 12.5 MM, type A (449), as per plan (442E22301) | CY | 8 | $650.00 | $2,500.00 |
| 39 | Barrier reflector, type 1 (1 way) (626E00102) | EACH | 8 | $13.00 | $13.10 |
| 40 | Ground mounted support, no. 2 post (630E02100) | FT | 21 | $13.00 | $58.65 |
| 41 | Sign, flat sheet (630E80100) | SF | 2.50 | $33.00 | $61.65 |
| 42 | Removal of ground mounted sign and disposal (630E84900) | EACH | 2 | $27.00 | $17.15 |
| 43 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $27.00 | $22.85 |
| 44 | Edge line, 6" (646E10010) | MI | 0.14 | $19,000 | $19,000 |
| 45 | Lane line, 4" (646E10100) | MI | 0.07 | $19,000 | $19,000 |
| 46 | Traffic compacted surface, type A or B (410E12000) | CY | 50 | $92.00 | $90.00 |
| 47 | Traffic compacted surface, type C (410E13000) | CY | 50 | $86.00 | $90.00 |
| 48 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $100.00 | $125.00 |
| 49 | Detour signing (614E12420) | LS | 1 | $10,000 | $5,000.00 |
| 50 | Asphalt concrete for maintaining traffic (614E13000) | CY | 50 | $450.00 | $298.00 |
| 51 | Barrier reflector, type 1 (1 way) (614E13310) | EACH | 29 | $8.00 | $12.00 |
| 52 | Barrier reflector, type 2 (1 way) (614E13312) | EACH | 7 | $11.50 | $12.00 |
| 53 | Object marker, one way (614E13350) | EACH | 36 | $16.00 | $21.00 |
| 54 | Work zone edge line, class I, 6" (614E22010) | MI | 0.34 | $8,800.00 | $8,800.00 |
| 55 | Work zone channelizing line, class I, 12" (614E23010) | FT | 770 | $1.00 | $1.00 |
| 56 | Work zone dotted line, class I (614E24000) | FT | 139 | $0.75 | $0.75 |
| 57 | Water (616E10000) | MGAL | 4 | $75.00 | $200.00 |
| 58 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $270,000 | $126,715 |
| 59 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $100.00 | $33,725 |
| 61 | Epoxy coated reinforcing steel, as per plan (509E10001) | LB | 93,146 | $1.80 | $1.90 |
| 62 | No. 4 deformed GFRP reinforcement (509E30020) | FT | 9,174 | $1.80 | $2.90 |
| 63 | Dowel holes with nonshrink, nonmetallic grout, as per plan (510E10001) | EACH | 412 | $40.00 | $28.50 |
| 64 | Class QC2 concrete with QC/QA, bridge deck, as per plan (511E34447) | CY | 211 | $1,450.00 | $1,685.00 |
| 65 | Class QC2 concrete with QC/QA, bridge deck (parapet) (511E34450) | CY | 90 | $850.00 | $1,275.00 |
| 66 | Class QC1 concrete, pier (511E43210) | CY | 11 | $5,400.00 | $4,900.00 |
| 67 | Class QC1 concrete, abutment (511E45710) | CY | 31 | $2,900.00 | $1,600.00 |
| 68 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 939 | $25.00 | $33.00 |
| 69 | Concrete repair by epoxy injection (512E10600) | FT | 55 | $35.00 | $145.00 |
| 70 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 439 | $45.00 | $28.00 |
| 71 | Structural steel members, level UF, as per plan (513E10201) | LB | 8,200 | $7.50 | $10.60 |
| 72 | Welded stud shear connectors (513E20000) | EACH | 3,036 | $4.10 | $4.10 |
| 73 | Surface preparation of existing structural steel (514E00050) | SF | 9,407 | $12.00 | $16.00 |
| 74 | Field painting of existing structural steel, prime coat (514E00056) | SF | 9,407 | $3.50 | $9.00 |
| 75 | Field painting structural steel, intermediate coat (514E00060) | SF | 9,407 | $3.50 | $6.00 |
| 76 | Field painting structural steel, finish coat (514E00066) | SF | 9,407 | $3.50 | $5.00 |
| 77 | Grinding fins, tears, slivers on existing structural steel (514E00504) | MNHR | 16 | $90.00 | $150.00 |
| 78 | Final inspection repair (514E10000) | EACH | 5 | $250.00 | $250.00 |
| 79 | Structural expansion joint including elastomeric strip seal (516E11210) | FT | 61 | $975.00 | $1,635.00 |
| 80 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44101) | EACH | 12 | $1,900.00 | $2,950.00 |
| 81 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44201) | EACH | 8 | $1,700.00 | $2,525.00 |
| 82 | Jacking and temporary support of superstructure, as per plan (516E47001) | LS | 1 | $100,000 | $68,750 |
| 83 | Porous backfill with geotextile fabric (518E21200) | CY | 52 | $125.00 | $146.00 |
| 84 | 6" perforated corrugated plastic pipe (518E40000) | FT | 134 | $16.00 | $15.00 |
| 85 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 18 | $31.00 | $20.25 |
| 86 | Special - composite fiber wrap system (519E00100) | SF | 1,174 | $36.00 | $65.00 |
| 87 | Patching concrete structure, as per plan (519E11101) | SF | 40 | $150.00 | $170.00 |
| 88 | Reinforced concrete approach slabs with QC/QA (T=1 (526E30010) | SY | 203 | $485.00 | $490.00 |
| 89 | Type A installation (526E90010) | FT | 61 | $275.00 | $350.00 |
| 90 | Vandal protection fence, 6' straight, coated fabric (607E39900) | FT | 475 | $92.50 | $95.00 |
| 91 | Structure grounding system, as per plan (625E33001) | EACH | 1 | $9,780.00 | $10,275 |
| 92 | Polymer modified asphalt expansion joint system (846E00110) | CF | 25 | $591.75 | $115.00 |
| 93 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $200,000 | $93,000 |
| 94 | Conduit renewal using spray applied structural liner, arch, as per plan (833E12001) | FT | 448 | $1,995.00 | $2,745.00 |
| 95 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $40,000 | $37,600 |
| 96 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $1,000.00 | $10,000 |
| 97 | Maintaining traffic (614E11000) | LS | 1 | $105,000 | $140,650 |
| 98 | Field office, type B (619E16010) | MNTH | 12 | $3,250.00 | $2,475.00 |
| 99 | Construction layout stakes and surveying (623E10000) | LS | 1 | $30,000 | $28,900 |
| 100 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $7,500.00 | $3,500.00 |
| 101 | Mobilization (624E10000) | LS | 1 | $181,000 | $53,000 |
| 200 | Curb, type 4-C (609E24510) | FT | 100 | $90.00 | $22.00 |
| 201 | Unclassified excavation, as per plan (503E21101) | CY | 1 | $35,000 | $10,000 |
| 202 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 1 | $2,000.00 | $2,150.00 |
| 203 | Portable barrier, unanchored (622E41100) | FT | 140 | $70.00 | $58.00 |