Great Lakes Construction Co: ODOT bid record
Great Lakes Construction Co submitted 166 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 47 of them (28%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $491,710,432
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 32 | 9 | 28% |
| 2021 | 45 | 12 | 27% |
| 2022 | 15 | 5 | 33% |
| 2023 | 13 | 3 | 23% |
| 2024 | 22 | 8 | 36% |
| 2025 | 16 | 7 | 44% |
| 2026 | 23 | 3 | 13% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 50 | 17 | 34% |
| HAM | 17 | 8 | 47% |
| LAK | 13 | 3 | 23% |
| MED | 11 | 4 | 36% |
| SUM | 10 | 2 | 20% |
| BUT | 5 | 1 | 20% |
| LOR | 5 | 2 | 40% |
| STA | 4 | 1 | 25% |
| POR | 4 | 0 | 0% |
| District 12 | 4 | 3 | 75% |
| BEL | 3 | 0 | 0% |
| ATB | 3 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 159 | 159 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 132 | 83 (63%) | $1.00 | $1.00 |
| Guardrail removed | 202E38000 | FT | 116 | 80 (69%) | $2.40 | $2.50 |
| Guardrail, type MGS | 606E15050 | FT | 101 | 74 (73%) | $21.60 | $22.73 |
| Sign, flat sheet | 630E80100 | SF | 94 | 64 (68%) | $18.10 | $24.00 |
| Seeding and mulching | 659E10000 | SY | 105 | 61 (58%) | $1.25 | $2.60 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 102 | 61 (60%) | $750.00 | $950.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 141 | 60 (43%) | $25.00 | $34.00 |
| Ground mounted support, no. 3 post | 630E03100 | FT | 71 | 51 (72%) | $12.50 | $15.20 |
| Non-tracking tack coat | 407E20000 | GAL | 86 | 47 (55%) | $3.05 | $3.25 |
| Anchor assembly, MGS type T | 606E26550 | EACH | 65 | 46 (71%) | $1,250.00 | $1,260.00 |
| Work zone impact attenuator, 24" wide hazards, (unidirectional) | 614E12380 | EACH | 68 | 45 (66%) | $2,012.50 | $2,280.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Ruhlin Company | 62 | 36 of 62 |
| Shelly & Sands Inc | 59 | 40 of 59 |
| Complete General Construction Company | 39 | 15 of 39 |
| Kokosing Construction Company Inc | 38 | 12 of 38 |
| J D Williamson Construction Co Inc | 37 | 27 of 37 |
| Sunesis Construction Co | 26 | 9 of 26 |
| Perk Company Inc | 21 | 8 of 21 |
| Eagle Bridge Co | 20 | 12 of 20 |
| Karvo Companies Inc | 18 | 11 of 18 |
| Beaver Excavating Company | 17 | 7 of 17 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260521 | GUE | GUE-IR 70 EB Rest Area TP (PARKING AREAS) | 8 of 8 | $8,179,075 | +11% |
| 12 NOV 2026 | 260524 | WAR | WAR-IR 71 Rest Areas TP (PARKING AREAS) | 7 of 7 | $16,375,411 | +20% |
| 29 OCT 2026 | 260399 | CUY | CUY-US 422-16.20 Interchange (INTERCHANGE) | 3 of 4 | $12,428,762 | +10% |
| 29 OCT 2026 | 260477 | ATB | ATB-IR 90 Vacant Rest Areas TP (PARKING AREAS) | 2 of 3 | $9,242,650 | +1.0% |
| 01 OCT 2026 | 260449 | HEN | HEN-US 6/CR 424 Infields TP (PARKING AREAS) | 2 of 2 | $3,696,619 | +17% |
| 13 AUG 2026 | 260345 | CUY | CUY-SR 17-13.50 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $9,355,611 | Low, 6.0% under the second |
| 13 AUG 2026 | 260353 | LOR | LOR-US 6/SR 611-06.86/VAR (BRIDGE REPAIR) | 1 of 2 | $3,640,934 | Low, 7.0% under the second |
| 13 AUG 2026 | 260371 | SUM | SUM-SR 21-01.07 (BRIDGE REPAIR) | 7 of 9 | $2,514,163 | +34% |
| 30 JUL 2026 | 260327 | CUY | CUY-IR 90-20.45 Barrier (MISCELLANEOUS) | 3 of 3 | $13,077,088 | +3.0% |
| 30 JUL 2026 | 268015 | PRE | PRE-IR 70 WB Truck Parking (PARKING AREAS) | 3 of 6 | $13,841,717 | +16% |
| 16 JUL 2026 | 260328 | CUY | CUY-/GEA BH FY2027 Misc (PART 1 AND PART 2) (BRIDGE REPAIR) | 4 of 4 | $10,049,875 | +14% |
| 07 MAY 2026 | 260232 | CUY | CUY-Memorial Bridges Loop Trail (BIKEWAYS) | 2 of 3 | $2,008,550 | +4.0% |
| 07 MAY 2026 | 260233 | CUY | CUY-Old Detroit Rd Bridge Rehab (MISCELLANEOUS) | 2 of 3 | $958,463 | +1.0% |
| 23 APR 2026 | 260217 | CUY | CUY-IR 480-16.56 Slide (SLIDE REPAIR) | 2 of 4 | $860,890 | +7.0% |
| 17 APR 2026 | 268004 | SUM | SUM-IR 77-Vacant Rest Area TP | 2 of 3 | $3,373,830 | +3.0% |
| 09 APR 2026 | 268005 | MED | MED-IR 71 Rest Areas TP (PARKING AREAS) | 1 of 3 | $5,035,276 | Low, 8.0% under the second |
| 12 MAR 2026 | 260098 | SUM | SUM-SR 91-07.89 (BRIDGE REPAIR) | 3 of 3 | $2,643,491 | +21% |
| 12 MAR 2026 | 268001 | WYA | WYA-US 30 Rest Areas TP (PARKING AREAS) | 4 of 10 | $3,546,282 | +5.0% |
| 19 FEB 2026 | 260084 | District 12 | D12-BH FY2026 Overlay (BRIDGE REPAIR) | 2 of 4 | $2,356,812 | +28% |
| 19 FEB 2026 | 260096 | SUM | SUM-IR 277-03.73 (BRIDGE REPAIR) | 4 of 4 | $16,525,942 | +7.0% |
| 29 JAN 2026 | 260001 | CUY | CUY-IR 71-10.07 SW Replace | 3 of 3 | $13,327,911 | +21% |
| 15 JAN 2026 | 260010 | CUY | CUY-IR 480-13.04 Ramps (MINOR RECONSTRUCTION) | 5 of 9 | $2,271,659 | +21% |
| 15 JAN 2026 | 268000 | TRU | TRU-IR 80-11.32 Truck Parking (PARKING AREAS) | 4 of 7 | $4,905,531 | +4.0% |
| 18 DEC 2025 | 250610 | CUY | CUY-IR 77-15.46/VAR Decks (BRIDGE REPAIR) | 1 of 5 | $25,286,681 | Low, 5.0% under the second |
| 23 OCT 2025 | 250500 | LAK | LAK-US 6-02.06 Super (BRIDGE REPAIR) | 3 of 3 | $7,478,757 | +7.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.