ODOT contract 260524 bid tabulation
WAR-IR 71 Rest Areas TP (PARKING AREAS). Let by Ohio DOT on November 12, 2026, WAR. 7 bids received; low bid $13,595,884 by Prus Construction Company, -9.9% against the engineer's estimate of $15,097,000.
- Owner
- Ohio DOT
- Letting
- 12 NOV 2026
- Pay items
- 156
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Prus Construction Company | $13,595,884 | Low | -10% |
| 2 | Fillmore Construction | $13,897,132 | +2.0% | -8.0% |
| 3 | Eagle Bridge Co | $14,385,089 | +6.0% | -5.0% |
| 4 | KT Holden Construction LLC | $15,358,367 | +13% | +2.0% |
| 5 | Sunesis Construction Co | $15,485,841 | +14% | +3.0% |
| 6 | Complete General Construction Company | $15,503,237 | +14% | +3.0% |
| 7 | Great Lakes Construction Co | $16,375,411 | +20% | +8.0% |
Engineer's estimate: $15,097,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Prus Construction Company | 2. Fillmore Construction | 3. Eagle Bridge Co | 4. KT Holden Construction LLC | 5. Sunesis Construction Co | 6. Complete General Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $55,000 | $245,000 | $125,000 | $57,884 | $39,920 | $95,000 |
| 2 | Pavement removed (202E23000) | SY | 2,335 | $12.25 | $14.00 | $10.00 | $14.97 | $14.72 | $15.00 |
| 3 | Walk removed (202E30000) | SF | 2,867 | $2.50 | $10.00 | $3.00 | $5.20 | $3.02 | $3.50 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 1,038 | $36.00 | $20.00 | $10.00 | $54.76 | $15.42 | $30.00 |
| 5 | Guardrail removed (202E38000) | FT | 120 | $3.50 | $10.00 | $4.00 | $10.20 | $10.00 | $3.00 |
| 6 | Catch basin removed (202E58100) | EACH | 3 | $250.00 | $500.00 | $300.00 | $607.22 | $561.02 | $500.00 |
| 7 | Special - pipe cleanout, 24" and under (202E70110) | FT | 250 | $35.00 | $40.00 | $30.00 | $44.91 | $20.00 | $40.00 |
| 8 | Fence removed (202E75000) | FT | 1,984 | $2.75 | $5.00 | $5.00 | $5.10 | $5.00 | $2.50 |
| 9 | Gate removed (202E75250) | EACH | 3 | $300.00 | $225.00 | $350.00 | $229.59 | $225.00 | $245.00 |
| 10 | Valve box removed (202E75610) | EACH | 2 | $155.00 | $250.00 | $150.00 | $176.31 | $156.41 | $300.00 |
| 11 | Removal misc.: bench and trash can removed and SA (202E98000) | LS | 1 | $1,500.00 | $1,000.00 | $1,000.00 | $827.12 | $1,460.50 | $1,000.00 |
| 12 | Removal misc.: bollards removed (202E98100) | EACH | 15 | $1,100.00 | $200.00 | $350.00 | $987.99 | $1,163.75 | $600.00 |
| 13 | Removal misc.: rocks removed (202E98100) | EACH | 5 | $137.00 | $200.00 | $200.00 | $147.94 | $202.55 | $625.00 |
| 14 | Removal misc.:concrete pad removed (202E98100) | EACH | 3 | $215.00 | $500.00 | $580.00 | $209.61 | $1,109.12 | $650.00 |
| 15 | Removal misc.:post removed (202E98100) | EACH | 2 | $155.00 | $250.00 | $150.00 | $33.28 | $117.32 | $350.00 |
| 16 | Removal misc.:telecom pull box removed (202E98100) | EACH | 1 | $880.00 | $1,000.00 | $800.00 | $500.00 | $500.00 | $800.00 |
| 17 | Removal misc.: wall removed (202E98200) | FT | 111 | $100.00 | $50.00 | $35.00 | $97.11 | $84.32 | $35.00 |
| 21 | Removal misc.:rip rap removed (202E98300) | SY | 48 | $44.00 | $20.00 | $35.00 | $20.51 | $88.85 | $30.00 |
| 22 | Excavation (203E10000) | CY | 28,549 | $11.50 | $30.00 | $8.50 | $21.66 | $13.46 | $25.00 |
| 23 | Embankment (203E20000) | CY | 47,782 | $8.50 | $50.00 | $12.00 | $17.31 | $17.16 | $21.50 |
| 24 | Granular material, type E, as per plan (203E35141) | CY | 42 | $160.00 | $100.00 | $165.00 | $148.13 | $145.73 | $152.50 |
| 25 | Subgrade compaction (204E10000) | SY | 453 | $2.75 | $5.00 | $8.00 | $10.02 | $9.26 | $18.00 |
| 26 | Excavation of subgrade (204E13000) | CY | 166 | $85.00 | $20.00 | $25.00 | $62.69 | $47.79 | $32.00 |
| 27 | Granular material, type C (204E30020) | CY | 166 | $75.00 | $80.00 | $105.00 | $115.54 | $98.09 | $85.00 |
| 28 | Proof rolling (204E45000) | HR | 33 | $150.00 | $200.00 | $400.00 | $244.01 | $257.32 | $350.00 |
| 29 | Geotextile fabric (204E50000) | SY | 496 | $3.45 | $5.00 | $2.50 | $3.09 | $1.28 | $5.00 |
| 30 | Cement (206E10500) | TON | 1,724 | $250.00 | $229.00 | $229.00 | $229.00 | $219.00 | $219.00 |
| 31 | Curing coat (206E11000) | SY | 66,539 | $1.40 | $1.28 | $1.30 | $1.28 | $1.15 | $1.15 |
| 32 | Cement stabilized subgrade, 12 inches deep (206E15010) | SY | 66,539 | $3.90 | $2.25 | $4.75 | $3.25 | $4.79 | $4.60 |
| 33 | Mixture design for chemically stabilized soils (206E30000) | LS | 1 | $32,500 | $29,480 | $32,500 | $29,480 | $11,000 | $11,000 |
| 34 | Guardrail, type MGS (606E15050) | FT | 200 | $35.00 | $27.00 | $32.40 | $27.55 | $27.00 | $32.40 |
| 35 | Rounded end section (606E20050) | EACH | 1 | $132.00 | $50.00 | $120.00 | $51.02 | $50.00 | $120.00 |
| 36 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,750.00 | $1,350.00 | $1,580.00 | $1,377.55 | $1,350.00 | $1,580.00 |
| 37 | Fence, type 47RA (607E15100) | FT | 5,663 | $18.00 | $17.75 | $16.50 | $18.11 | $17.75 | $16.50 |
| 38 | Gate, type 47, as per plan (607E40501) | EACH | 2 | $5,400.00 | $3,325.00 | $4,920.00 | $3,392.86 | $3,325.00 | $4,920.00 |
| 39 | Fence, misc.: wooden slat fence (607E98000) | FT | 147 | $185.00 | $100.00 | $166.50 | $102.04 | $100.00 | $166.50 |
| 40 | 4" concrete walk (608E10000) | SF | 8,176 | $8.50 | $15.00 | $9.00 | $7.03 | $10.90 | $8.00 |
| 41 | Curb ramp (608E52000) | SF | 1,587 | $16.00 | $30.00 | $14.00 | $21.20 | $18.18 | $24.00 |
| 42 | Detectable warning (608E53020) | SF | 10 | $80.00 | $30.00 | $28.00 | $50.23 | $28.00 | $130.00 |
| 43 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $7,500.00 | $10,000 | $3,500.00 | $1,950.00 | $1,500.00 | $2,850.00 |
| 44 | Post construction survey monument verification and report (623E51000) | LS | 1 | $7,500.00 | $10,000 | $1,500.00 | $1,950.00 | $2,500.00 | $4,300.00 |
| 45 | Topsoil stockpiled (651E10000) | CY | 5,279 | $6.00 | $20.00 | $7.00 | $12.69 | $18.22 | $10.00 |
| 46 | Special - bollard (690E50600) | EACH | 46 | $1,000.00 | $385.00 | $895.00 | $392.86 | $385.00 | $895.00 |
| 47 | Riprap (601E10000) | SY | 9 | $275.00 | $186.00 | $525.00 | $597.09 | $614.94 | $650.00 |
| 48 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 1,240 | $77.00 | $65.00 | $65.00 | $82.45 | $77.55 | $130.00 |
| 49 | Rock channel protection, type C with filter (601E32200) | CY | 111 | $275.00 | $200.00 | $110.00 | $203.84 | $218.68 | $160.00 |
| 50 | Detention basin filter (601E45030) | SY | 1,556 | $26.50 | $69.50 | $30.00 | $37.55 | $31.50 | $45.00 |
| 51 | Soil analysis test (659E00100) | EACH | 2 | $155.00 | $500.00 | $400.00 | $50.00 | $75.00 | $100.00 |
| 52 | Topsoil (659E00300) | CY | 7,777 | $23.50 | $50.00 | $10.00 | $41.84 | $43.17 | $32.00 |
| 53 | Seeding and mulching (659E10000) | SY | 70,056 | $0.90 | $1.45 | $0.75 | $0.68 | $2.35 | $0.78 |
| 54 | Repair seeding and mulching (659E14000) | SY | 3,503 | $1.50 | $2.20 | $0.50 | $0.50 | $1.00 | $1.40 |
| 55 | Inter-seeding (659E15000) | SY | 3,503 | $1.20 | $2.20 | $0.01 | $0.01 | $1.00 | $1.10 |
| 56 | Commercial fertilizer (659E20000) | TON | 9.78 | $900.00 | $1,400.00 | $1,500.00 | $1,500.00 | $1,110.00 | $800.00 |
| 57 | Lime (659E31000) | ACRE | 14.48 | $11.00 | $450.00 | $50.00 | $50.00 | $630.00 | $10.00 |
| 58 | Water (659E35000) | MGAL | 388 | $1.00 | $1.00 | $1.00 | $1.00 | $48.00 | $0.50 |
| 59 | Slope erosion protection (670E00500) | SY | 4,903 | $2.50 | $2.25 | $2.00 | $1.95 | $2.80 | $2.25 |
| 60 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,000.00 | $7,500.00 | $5,000.00 | $3,900.00 | $3,900.00 | $3,900.00 |
| 61 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,500.00 | $25,000 | $32,000 | $20,160 | $8,280.00 | $22,000 |
| 62 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $20,000 | $10,000 | $20,000 | $17,644 | $17,644 | $17,700 |
| 63 | Erosion control (832E30000) | EACH | 300,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 64 | Unclassified excavation, including rock (503E21104) | CY | 50 | $74.00 | $100.00 | $50.00 | $148.59 | $72.37 | $90.00 |
| 65 | Concrete masonry (602E20000) | CY | 9 | $2,400.00 | $2,000.00 | $2,750.00 | $2,969.18 | $2,583.60 | $2,750.00 |
| 66 | 6" unclassified pipe underdrains, as per plan (605E13301) | FT | 530 | $28.50 | $25.00 | $15.00 | $20.54 | $19.63 | $22.00 |
| 67 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 24,739 | $15.00 | $10.00 | $12.00 | $16.65 | $17.94 | $15.00 |
| 68 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 1,850 | $24.00 | $22.00 | $25.00 | $32.76 | $34.39 | $23.00 |
| 69 | 6" conduit, type F (611E01500) | FT | 100 | $34.00 | $35.00 | $6.00 | $12.79 | $28.25 | $16.00 |
| 70 | 12" conduit, type B (611E04400) | FT | 2,795 | $59.00 | $110.00 | $75.00 | $68.64 | $89.47 | $95.00 |
| 71 | 12" conduit, type B (611E04400) | FT | 146 | $99.00 | $160.00 | $105.00 | $88.70 | $110.45 | $110.00 |
| 72 | 12" conduit, type C (611E04600) | FT | 468 | $73.50 | $105.00 | $75.00 | $71.20 | $84.49 | $85.00 |
| 73 | 15" conduit, type B (611E05900) | FT | 856 | $66.00 | $120.00 | $80.00 | $76.77 | $90.19 | $110.00 |
| 74 | 15" conduit, type C (611E06100) | FT | 402 | $71.00 | $110.00 | $80.00 | $79.37 | $83.34 | $90.00 |
| 75 | 18" conduit, type B (611E07400) | FT | 79 | $93.00 | $125.00 | $110.00 | $98.13 | $113.48 | $125.00 |
| 76 | 18" conduit, type C (611E07600) | FT | 426 | $83.00 | $115.00 | $105.00 | $87.77 | $112.84 | $105.00 |
| 77 | 21" conduit, type B (611E08900) | FT | 35 | $300.00 | $140.00 | $180.00 | $157.86 | $201.99 | $150.00 |
| 78 | 21" conduit, type C (611E09100) | FT | 351 | $100.00 | $120.00 | $135.00 | $105.32 | $187.94 | $110.00 |
| 79 | 24" conduit, type B (611E10400) | FT | 512 | $106.00 | $140.00 | $140.00 | $147.50 | $149.90 | $135.00 |
| 80 | 24" conduit, type C (611E10600) | FT | 99 | $133.00 | $120.00 | $130.00 | $137.08 | $140.25 | $130.00 |
| 81 | 22" X 34" conduit, type A, 706.04 (611E52400) | FT | 124 | $335.00 | $400.00 | $260.00 | $324.22 | $317.92 | $235.00 |
| 82 | Catch basin, no. 3 (611E98150) | EACH | 30 | $5,600.00 | $5,000.00 | $5,500.00 | $5,589.47 | $4,855.20 | $3,750.00 |
| 83 | Catch basin, no. 3A (611E98180) | EACH | 38 | $4,400.00 | $4,000.00 | $4,500.00 | $3,944.75 | $3,939.19 | $3,700.00 |
| 84 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $3,700.00 | $2,500.00 | $3,000.00 | $1,906.81 | $2,558.96 | $1,650.00 |
| 85 | Catch basin, no. 2-3 (611E98510) | EACH | 3 | $4,300.00 | $3,250.00 | $3,350.00 | $3,632.76 | $4,425.08 | $1,950.00 |
| 86 | Inlet, side ditch (611E98700) | EACH | 1 | $5,600.00 | $5,000.00 | $2,250.00 | $3,326.13 | $3,946.64 | $2,200.00 |
| 87 | Inlet, no. 2-6 (611E98710) | EACH | 3 | $7,100.00 | $7,500.00 | $7,500.00 | $7,765.46 | $8,112.23 | $4,200.00 |
| 88 | Manhole, no. 3 (611E99574) | EACH | 13 | $6,900.00 | $7,500.00 | $5,000.00 | $3,310.68 | $5,377.26 | $4,750.00 |
| 89 | Manhole reconstructed to grade (611E99660) | EACH | 1 | $3,500.00 | $5,000.00 | $2,000.00 | $3,004.35 | $3,331.33 | $2,800.00 |
| 90 | Manhole reconstructed to grade, as per plan (611E99661) | EACH | 1 | $7,200.00 | $3,500.00 | $2,000.00 | $3,700.57 | $3,331.33 | $3,000.00 |
| 91 | Precast reinforced concrete outlet (611E99710) | EACH | 8 | $625.00 | $500.00 | $300.00 | $502.70 | $448.73 | $350.00 |
| 92 | Water quality basin, detention (611E99854) | EACH | 3 | $5,750.00 | $35,000 | $5,250.00 | $7,235.90 | $5,625.39 | $6,500.00 |
| 93 | Aggregate base (304E20000) | CY | 11,985 | $74.00 | $68.00 | $70.00 | $91.88 | $100.22 | $80.00 |
| 94 | Stabilized crushed aggregate (411E10000) | CY | 34 | $142.00 | $98.00 | $150.00 | $195.37 | $163.06 | $200.00 |
| 95 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 453 | $155.00 | $125.00 | $110.00 | $106.52 | $110.00 | $115.00 |
| 96 | 8" non-reinforced concrete pavement, class QC 1P with QC/QA (452E12020) | SY | 64,276 | $85.00 | $1.00 | $95.00 | $93.20 | $91.49 | $90.00 |
| 97 | Curb, type 7 (609E28000) | FT | 14,812 | $28.00 | $32.00 | $28.00 | $24.11 | $31.44 | $24.00 |
| 98 | Concrete median (609E72000) | SY | 4,404 | $63.00 | $75.00 | $59.00 | $63.28 | $73.04 | $82.00 |
| 99 | Shoulder reconditioning, misc.:stabilized aggregat (617E98000) | SY | 668 | $59.00 | $30.00 | $60.00 | $64.34 | $62.27 | $75.00 |
| 100 | 4" water main polyvinyl chloride pipe and fittings (638E00390) | FT | 137 | $93.00 | $174.00 | $200.00 | $93.16 | $121.14 | $100.00 |
| 101 | 6" water main polyvinyl chloride pipe and fittings, ASTM SDR 21, as per plan (638E00991) | FT | 604 | $69.00 | $157.00 | $125.00 | $84.95 | $100.41 | $100.00 |
| 102 | 6" gate valve and valve box (638E07800) | EACH | 3 | $3,100.00 | $1,484.00 | $2,550.00 | $2,950.21 | $2,939.22 | $1,800.00 |
| 103 | 6" fire hydrant, as per plan (638E10201) | EACH | 2 | $9,500.00 | $6,913.25 | $7,500.00 | $7,829.27 | $8,599.96 | $6,500.00 |
| 104 | Fire hydrant removed (638E10480) | EACH | 1 | $570.00 | $25.00 | $1,000.00 | $1,399.15 | $567.47 | $800.00 |
| 105 | Meter, setting, stop and chamber, as per plan (638E11201) | EACH | 1 | $75,000 | $65,000 | $50,000 | $53,938 | $108,021 | $35,000 |
| 106 | Connection, fused pull apart (625E00450) | EACH | 10 | $182.00 | $215.50 | $165.00 | $219.90 | $145.00 | $165.00 |
| 107 | Connection, unfused pull apart (625E00460) | EACH | 5 | $182.00 | $204.50 | $165.00 | $208.67 | $190.00 | $165.00 |
| 108 | Connection, unfused permanent (625E00480) | EACH | 21 | $247.00 | $199.00 | $225.00 | $203.06 | $180.00 | $225.00 |
| 109 | Light pole, conventional, as per PLANAT20B40 (625E10491) | EACH | 5 | $6,275.00 | $6,483.00 | $5,700.00 | $6,615.31 | $5,500.00 | $5,700.00 |
| 110 | Light tower, misc.:BB45 (625E13500) | EACH | 21 | $19,800 | $21,305 | $18,000 | $21,740 | $17,000 | $18,000 |
| 111 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 5 | $2,750.00 | $2,298.00 | $2,500.00 | $2,344.90 | $2,200.00 | $2,500.00 |
| 112 | Light tower foundation, misc.:36" X 8' (625E15700) | EACH | 21 | $7,150.00 | $6,686.00 | $6,500.00 | $6,822.45 | $5,000.00 | $6,500.00 |
| 113 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 12,093 | $4.95 | $6.00 | $4.50 | $6.12 | $5.00 | $4.50 |
| 114 | No. 10 AWG pole and bracket cable (625E23400) | FT | 1,260 | $1.95 | $2.45 | $1.75 | $2.50 | $1.90 | $1.75 |
| 115 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 2,660 | $15.50 | $15.00 | $14.00 | $15.31 | $22.00 | $14.00 |
| 116 | Conduit, 3", 725.051 (625E25504) | FT | 5,302 | $16.50 | $8.70 | $15.00 | $8.88 | $15.00 | $15.00 |
| 117 | Conduit, jacked or drilled, 725.04 ,3" (625E25902) | FT | 60 | $88.00 | $137.00 | $80.00 | $139.80 | $100.00 | $80.00 |
| 118 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 5 | $363.00 | $419.00 | $330.00 | $427.55 | $650.00 | $330.00 |
| 119 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 42 | $1,430.00 | $1,288.00 | $1,300.00 | $1,314.29 | $2,081.00 | $1,300.00 |
| 120 | Trench (625E29000) | FT | 7,757 | $11.00 | $12.30 | $10.00 | $12.55 | $11.00 | $10.00 |
| 121 | Pull box, 725.08, 18" (625E30700) | EACH | 21 | $1,650.00 | $1,053.00 | $1,500.00 | $1,074.49 | $180.00 | $1,500.00 |
| 122 | Pull box removed and replaced (625E31506) | EACH | 3 | $1,925.00 | $1,634.00 | $1,750.00 | $1,667.35 | $2,200.00 | $1,750.00 |
| 123 | Pull box removed (625E31510) | EACH | 1 | $525.00 | $583.00 | $475.00 | $594.90 | $500.00 | $475.00 |
| 124 | Ground rod (625E32000) | EACH | 48 | $385.00 | $314.00 | $350.00 | $320.41 | $170.00 | $350.00 |
| 125 | Power service, as per plan (625E34001) | EACH | 3 | $13,750 | $14,800 | $12,500 | $15,102 | $19,000 | $12,500 |
| 126 | Control center cabinet, complete (625E34450) | EACH | 3 | $3,850.00 | $4,790.00 | $3,500.00 | $4,887.76 | $10,000 | $3,500.00 |
| 127 | Remove and reerect existing light pole (625E35010) | EACH | 1 | $1,100.00 | $870.00 | $1,000.00 | $887.76 | $3,500.00 | $1,000.00 |
| 128 | Underground warning marking tape (625E36010) | FT | 7,757 | $1.65 | $4.30 | $1.50 | $4.39 | $1.50 | $1.50 |
| 129 | Light pole removed (625E75400) | EACH | 1 | $635.00 | $240.00 | $575.00 | $244.90 | $500.00 | $575.00 |
| 130 | Arc flash calculations and label, control center ( (625E76000) | EACH | 3 | $4,575.00 | $2,750.00 | $4,150.00 | $2,806.12 | $2,000.00 | $4,150.00 |
| 131 | Power cable, 3 conductor, no. 2 AWG (632E69320) | FT | 5,253 | $14.50 | $6.20 | $13.00 | $6.33 | $16.00 | $13.00 |
| 132 | Barrier reflector, type 2, one-way (626E00110) | EACH | 3 | $16.50 | $15.00 | $15.00 | $15.31 | $15.00 | $15.00 |
| 133 | Ground mounted support, no. 3 post (630E03100) | FT | 946 | $18.15 | $14.00 | $15.98 | $14.29 | $15.98 | $16.50 |
| 134 | Sign post reflector (630E08600) | EACH | 11 | $49.50 | $49.30 | $58.49 | $50.31 | $58.49 | $45.00 |
| 135 | Sign, flat sheet (630E80100) | SF | 464.30 | $22.00 | $21.50 | $18.05 | $21.94 | $18.05 | $20.00 |
| 136 | Sign, ground mounted extrusheet (630E80200) | SF | 156 | $33.00 | $42.50 | $37.55 | $43.37 | $37.55 | $30.00 |
| 137 | Removal of ground mounted sign and disposal (630E84900) | EACH | 5 | $16.50 | $25.00 | $17.85 | $25.51 | $17.85 | $15.00 |
| 138 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $27.50 | $50.00 | $23.79 | $51.02 | $23.79 | $25.00 |
| 139 | Edge line, 6" (646E10010) | MI | 0.85 | $5,200.00 | $8,150.00 | $4,735.00 | $8,150.00 | $4,735.00 | $4,735.00 |
| 140 | Edge line, 6" (646E10010) | MI | 0.56 | $5,200.00 | $8,150.00 | $4,735.00 | $8,150.00 | $4,735.00 | $4,735.00 |
| 141 | Center line (646E10200) | MI | 0.18 | $6,950.00 | $14,000 | $6,325.00 | $14,000 | $6,325.00 | $6,325.00 |
| 142 | Stop line (646E10400) | FT | 26 | $13.50 | $14.00 | $12.25 | $14.00 | $12.25 | $12.25 |
| 143 | Crosswalk line, 12" (646E10510) | FT | 580 | $8.25 | $4.80 | $7.50 | $4.80 | $7.50 | $7.50 |
| 144 | Transverse/diagonal line, as per plan (646E10601) | FT | 1,104 | $2.80 | $2.55 | $2.55 | $2.55 | $2.55 | $2.55 |
| 145 | Transverse/diagonal line, as per plan (646E10601) | FT | 156 | $2.80 | $2.55 | $2.55 | $2.55 | $2.55 | $2.55 |
| 146 | Handicap symbol marking (646E10900) | EACH | 6 | $225.00 | $125.00 | $205.00 | $125.00 | $205.00 | $205.00 |
| 147 | Parking lot stall marking (646E20200) | FT | 23,183 | $2.80 | $2.55 | $2.55 | $2.55 | $2.55 | $2.55 |
| 148 | Lane arrow (646E20300) | EACH | 31 | $215.00 | $140.00 | $195.00 | $140.00 | $195.00 | $195.00 |
| 149 | Yield line (646E20800) | FT | 77 | $17.50 | $16.00 | $15.95 | $16.00 | $15.95 | $15.95 |
| 150 | Removal of pavement marking (646E50000) | EACH | 17 | $126.50 | $110.00 | $115.00 | $110.00 | $115.00 | $115.00 |
| 151 | Removal of pavement marking (646E50100) | FT | 14,514 | $0.60 | $0.50 | $0.55 | $0.50 | $0.55 | $0.55 |
| 152 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $950.00 | $1,000.00 | $850.00 | $1,531.55 | $880.38 | $1,000.00 |
| 153 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $75,000 | $150,000 | $150,000 | $153,584 | $64,979 | $75,000 |
| 154 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $2,900.00 | $10,000 | $15,000 | $7,160.77 | $8,620.00 | $30,000 |
| 155 | Maintaining traffic (614E11000) | LS | 1 | $35,000 | $500,000 | $40,000 | $19,607 | $162,797 | $50,000 |
| 157 | Construction layout stakes and surveying (623E10000) | LS | 1 | $75,000 | $130,000 | $75,000 | $81,300 | $125,679 | $150,000 |
| 158 | Mobilization (624E10000) | LS | 1 | $400,000 | $2,350,000 | $700,000 | $569,689 | $400,000 | $750,000 |
| 200 | Pull box, 725.08, 24" (625E30706) | EACH | 4 | $1,760.00 | $1,427.00 | $1,600.00 | $1,456.12 | $2,200.00 | $1,600.00 |
| 201 | Excavation, as per plan (203E10001) | CY | 510 | $35.00 | $50.00 | $20.00 | $131.35 | $53.58 | $32.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.