ODOT contract 260524 bid tabulation

WAR-IR 71 Rest Areas TP (PARKING AREAS). Let by Ohio DOT on November 12, 2026, WAR. 7 bids received; low bid $13,595,884 by Prus Construction Company, -9.9% against the engineer's estimate of $15,097,000.

Owner
Ohio DOT
Letting
12 NOV 2026
Pay items
156
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Prus Construction Company$13,595,884Low-10%
2Fillmore Construction$13,897,132+2.0%-8.0%
3Eagle Bridge Co$14,385,089+6.0%-5.0%
4KT Holden Construction LLC$15,358,367+13%+2.0%
5Sunesis Construction Co$15,485,841+14%+3.0%
6Complete General Construction Company$15,503,237+14%+3.0%
7Great Lakes Construction Co$16,375,411+20%+8.0%
ODOT contract 260524: bids by rank

Engineer's estimate: $15,097,000.

Bid tabulation

LinePay itemUnitQuantity1. Prus Construction Company2. Fillmore Construction3. Eagle Bridge Co4. KT Holden Construction LLC5. Sunesis Construction Co6. Complete General Construction Company
1Clearing and grubbing (201E11000)LS1$55,000$245,000$125,000$57,884$39,920$95,000
2Pavement removed (202E23000)SY2,335$12.25$14.00$10.00$14.97$14.72$15.00
3Walk removed (202E30000)SF2,867$2.50$10.00$3.00$5.20$3.02$3.50
4Pipe removed, 24" and under (202E35100)FT1,038$36.00$20.00$10.00$54.76$15.42$30.00
5Guardrail removed (202E38000)FT120$3.50$10.00$4.00$10.20$10.00$3.00
6Catch basin removed (202E58100)EACH3$250.00$500.00$300.00$607.22$561.02$500.00
7Special - pipe cleanout, 24" and under (202E70110)FT250$35.00$40.00$30.00$44.91$20.00$40.00
8Fence removed (202E75000)FT1,984$2.75$5.00$5.00$5.10$5.00$2.50
9Gate removed (202E75250)EACH3$300.00$225.00$350.00$229.59$225.00$245.00
10Valve box removed (202E75610)EACH2$155.00$250.00$150.00$176.31$156.41$300.00
11Removal misc.: bench and trash can removed and SA (202E98000)LS1$1,500.00$1,000.00$1,000.00$827.12$1,460.50$1,000.00
12Removal misc.: bollards removed (202E98100)EACH15$1,100.00$200.00$350.00$987.99$1,163.75$600.00
13Removal misc.: rocks removed (202E98100)EACH5$137.00$200.00$200.00$147.94$202.55$625.00
14Removal misc.:concrete pad removed (202E98100)EACH3$215.00$500.00$580.00$209.61$1,109.12$650.00
15Removal misc.:post removed (202E98100)EACH2$155.00$250.00$150.00$33.28$117.32$350.00
16Removal misc.:telecom pull box removed (202E98100)EACH1$880.00$1,000.00$800.00$500.00$500.00$800.00
17Removal misc.: wall removed (202E98200)FT111$100.00$50.00$35.00$97.11$84.32$35.00
21Removal misc.:rip rap removed (202E98300)SY48$44.00$20.00$35.00$20.51$88.85$30.00
22Excavation (203E10000)CY28,549$11.50$30.00$8.50$21.66$13.46$25.00
23Embankment (203E20000)CY47,782$8.50$50.00$12.00$17.31$17.16$21.50
24Granular material, type E, as per plan (203E35141)CY42$160.00$100.00$165.00$148.13$145.73$152.50
25Subgrade compaction (204E10000)SY453$2.75$5.00$8.00$10.02$9.26$18.00
26Excavation of subgrade (204E13000)CY166$85.00$20.00$25.00$62.69$47.79$32.00
27Granular material, type C (204E30020)CY166$75.00$80.00$105.00$115.54$98.09$85.00
28Proof rolling (204E45000)HR33$150.00$200.00$400.00$244.01$257.32$350.00
29Geotextile fabric (204E50000)SY496$3.45$5.00$2.50$3.09$1.28$5.00
30Cement (206E10500)TON1,724$250.00$229.00$229.00$229.00$219.00$219.00
31Curing coat (206E11000)SY66,539$1.40$1.28$1.30$1.28$1.15$1.15
32Cement stabilized subgrade, 12 inches deep (206E15010)SY66,539$3.90$2.25$4.75$3.25$4.79$4.60
33Mixture design for chemically stabilized soils (206E30000)LS1$32,500$29,480$32,500$29,480$11,000$11,000
34Guardrail, type MGS (606E15050)FT200$35.00$27.00$32.40$27.55$27.00$32.40
35Rounded end section (606E20050)EACH1$132.00$50.00$120.00$51.02$50.00$120.00
36Anchor assembly, MGS type T (606E26550)EACH1$1,750.00$1,350.00$1,580.00$1,377.55$1,350.00$1,580.00
37Fence, type 47RA (607E15100)FT5,663$18.00$17.75$16.50$18.11$17.75$16.50
38Gate, type 47, as per plan (607E40501)EACH2$5,400.00$3,325.00$4,920.00$3,392.86$3,325.00$4,920.00
39Fence, misc.: wooden slat fence (607E98000)FT147$185.00$100.00$166.50$102.04$100.00$166.50
404" concrete walk (608E10000)SF8,176$8.50$15.00$9.00$7.03$10.90$8.00
41Curb ramp (608E52000)SF1,587$16.00$30.00$14.00$21.20$18.18$24.00
42Detectable warning (608E53020)SF10$80.00$30.00$28.00$50.23$28.00$130.00
43Preconstruction survey monument verification and report (623E50000)LS1$7,500.00$10,000$3,500.00$1,950.00$1,500.00$2,850.00
44Post construction survey monument verification and report (623E51000)LS1$7,500.00$10,000$1,500.00$1,950.00$2,500.00$4,300.00
45Topsoil stockpiled (651E10000)CY5,279$6.00$20.00$7.00$12.69$18.22$10.00
46Special - bollard (690E50600)EACH46$1,000.00$385.00$895.00$392.86$385.00$895.00
47Riprap (601E10000)SY9$275.00$186.00$525.00$597.09$614.94$650.00
48Tied concrete block mat with type 1 underlayment (601E21050)SY1,240$77.00$65.00$65.00$82.45$77.55$130.00
49Rock channel protection, type C with filter (601E32200)CY111$275.00$200.00$110.00$203.84$218.68$160.00
50Detention basin filter (601E45030)SY1,556$26.50$69.50$30.00$37.55$31.50$45.00
51Soil analysis test (659E00100)EACH2$155.00$500.00$400.00$50.00$75.00$100.00
52Topsoil (659E00300)CY7,777$23.50$50.00$10.00$41.84$43.17$32.00
53Seeding and mulching (659E10000)SY70,056$0.90$1.45$0.75$0.68$2.35$0.78
54Repair seeding and mulching (659E14000)SY3,503$1.50$2.20$0.50$0.50$1.00$1.40
55Inter-seeding (659E15000)SY3,503$1.20$2.20$0.01$0.01$1.00$1.10
56Commercial fertilizer (659E20000)TON9.78$900.00$1,400.00$1,500.00$1,500.00$1,110.00$800.00
57Lime (659E31000)ACRE14.48$11.00$450.00$50.00$50.00$630.00$10.00
58Water (659E35000)MGAL388$1.00$1.00$1.00$1.00$48.00$0.50
59Slope erosion protection (670E00500)SY4,903$2.50$2.25$2.00$1.95$2.80$2.25
60Storm water pollution prevention plan (832E15000)LS1$5,000.00$7,500.00$5,000.00$3,900.00$3,900.00$3,900.00
61Storm water pollution prevention inspections (832E15002)LS1$7,500.00$25,000$32,000$20,160$8,280.00$22,000
62Storm water pollution prevention inspection software (832E15010)LS1$20,000$10,000$20,000$17,644$17,644$17,700
63Erosion control (832E30000)EACH300,000$1.00$1.00$1.00$1.00$1.00$1.00
64Unclassified excavation, including rock (503E21104)CY50$74.00$100.00$50.00$148.59$72.37$90.00
65Concrete masonry (602E20000)CY9$2,400.00$2,000.00$2,750.00$2,969.18$2,583.60$2,750.00
666" unclassified pipe underdrains, as per plan (605E13301)FT530$28.50$25.00$15.00$20.54$19.63$22.00
676" base pipe underdrains with geotextile fabric (605E14020)FT24,739$15.00$10.00$12.00$16.65$17.94$15.00
686" conduit, type F for underdrain outlets (611E00510)FT1,850$24.00$22.00$25.00$32.76$34.39$23.00
696" conduit, type F (611E01500)FT100$34.00$35.00$6.00$12.79$28.25$16.00
7012" conduit, type B (611E04400)FT2,795$59.00$110.00$75.00$68.64$89.47$95.00
7112" conduit, type B (611E04400)FT146$99.00$160.00$105.00$88.70$110.45$110.00
7212" conduit, type C (611E04600)FT468$73.50$105.00$75.00$71.20$84.49$85.00
7315" conduit, type B (611E05900)FT856$66.00$120.00$80.00$76.77$90.19$110.00
7415" conduit, type C (611E06100)FT402$71.00$110.00$80.00$79.37$83.34$90.00
7518" conduit, type B (611E07400)FT79$93.00$125.00$110.00$98.13$113.48$125.00
7618" conduit, type C (611E07600)FT426$83.00$115.00$105.00$87.77$112.84$105.00
7721" conduit, type B (611E08900)FT35$300.00$140.00$180.00$157.86$201.99$150.00
7821" conduit, type C (611E09100)FT351$100.00$120.00$135.00$105.32$187.94$110.00
7924" conduit, type B (611E10400)FT512$106.00$140.00$140.00$147.50$149.90$135.00
8024" conduit, type C (611E10600)FT99$133.00$120.00$130.00$137.08$140.25$130.00
8122" X 34" conduit, type A, 706.04 (611E52400)FT124$335.00$400.00$260.00$324.22$317.92$235.00
82Catch basin, no. 3 (611E98150)EACH30$5,600.00$5,000.00$5,500.00$5,589.47$4,855.20$3,750.00
83Catch basin, no. 3A (611E98180)EACH38$4,400.00$4,000.00$4,500.00$3,944.75$3,939.19$3,700.00
84Catch basin, no. 2-2B (611E98470)EACH2$3,700.00$2,500.00$3,000.00$1,906.81$2,558.96$1,650.00
85Catch basin, no. 2-3 (611E98510)EACH3$4,300.00$3,250.00$3,350.00$3,632.76$4,425.08$1,950.00
86Inlet, side ditch (611E98700)EACH1$5,600.00$5,000.00$2,250.00$3,326.13$3,946.64$2,200.00
87Inlet, no. 2-6 (611E98710)EACH3$7,100.00$7,500.00$7,500.00$7,765.46$8,112.23$4,200.00
88Manhole, no. 3 (611E99574)EACH13$6,900.00$7,500.00$5,000.00$3,310.68$5,377.26$4,750.00
89Manhole reconstructed to grade (611E99660)EACH1$3,500.00$5,000.00$2,000.00$3,004.35$3,331.33$2,800.00
90Manhole reconstructed to grade, as per plan (611E99661)EACH1$7,200.00$3,500.00$2,000.00$3,700.57$3,331.33$3,000.00
91Precast reinforced concrete outlet (611E99710)EACH8$625.00$500.00$300.00$502.70$448.73$350.00
92Water quality basin, detention (611E99854)EACH3$5,750.00$35,000$5,250.00$7,235.90$5,625.39$6,500.00
93Aggregate base (304E20000)CY11,985$74.00$68.00$70.00$91.88$100.22$80.00
94Stabilized crushed aggregate (411E10000)CY34$142.00$98.00$150.00$195.37$163.06$200.00
958" non-reinforced concrete pavement, class QC 1P (452E12010)SY453$155.00$125.00$110.00$106.52$110.00$115.00
968" non-reinforced concrete pavement, class QC 1P with QC/QA (452E12020)SY64,276$85.00$1.00$95.00$93.20$91.49$90.00
97Curb, type 7 (609E28000)FT14,812$28.00$32.00$28.00$24.11$31.44$24.00
98Concrete median (609E72000)SY4,404$63.00$75.00$59.00$63.28$73.04$82.00
99Shoulder reconditioning, misc.:stabilized aggregat (617E98000)SY668$59.00$30.00$60.00$64.34$62.27$75.00
1004" water main polyvinyl chloride pipe and fittings (638E00390)FT137$93.00$174.00$200.00$93.16$121.14$100.00
1016" water main polyvinyl chloride pipe and fittings, ASTM SDR 21, as per plan (638E00991)FT604$69.00$157.00$125.00$84.95$100.41$100.00
1026" gate valve and valve box (638E07800)EACH3$3,100.00$1,484.00$2,550.00$2,950.21$2,939.22$1,800.00
1036" fire hydrant, as per plan (638E10201)EACH2$9,500.00$6,913.25$7,500.00$7,829.27$8,599.96$6,500.00
104Fire hydrant removed (638E10480)EACH1$570.00$25.00$1,000.00$1,399.15$567.47$800.00
105Meter, setting, stop and chamber, as per plan (638E11201)EACH1$75,000$65,000$50,000$53,938$108,021$35,000
106Connection, fused pull apart (625E00450)EACH10$182.00$215.50$165.00$219.90$145.00$165.00
107Connection, unfused pull apart (625E00460)EACH5$182.00$204.50$165.00$208.67$190.00$165.00
108Connection, unfused permanent (625E00480)EACH21$247.00$199.00$225.00$203.06$180.00$225.00
109Light pole, conventional, as per PLANAT20B40 (625E10491)EACH5$6,275.00$6,483.00$5,700.00$6,615.31$5,500.00$5,700.00
110Light tower, misc.:BB45 (625E13500)EACH21$19,800$21,305$18,000$21,740$17,000$18,000
111Light pole foundation, 24" X 8' deep (625E14100)EACH5$2,750.00$2,298.00$2,500.00$2,344.90$2,200.00$2,500.00
112Light tower foundation, misc.:36" X 8' (625E15700)EACH21$7,150.00$6,686.00$6,500.00$6,822.45$5,000.00$6,500.00
113No. 4 AWG 2400 volt distribution cable (625E23200)FT12,093$4.95$6.00$4.50$6.12$5.00$4.50
114No. 10 AWG pole and bracket cable (625E23400)FT1,260$1.95$2.45$1.75$2.50$1.90$1.75
1151-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320)FT2,660$15.50$15.00$14.00$15.31$22.00$14.00
116Conduit, 3", 725.051 (625E25504)FT5,302$16.50$8.70$15.00$8.88$15.00$15.00
117Conduit, jacked or drilled, 725.04 ,3" (625E25902)FT60$88.00$137.00$80.00$139.80$100.00$80.00
118Luminaire, conventional, solid state (LED), as per plan (625E26253)EACH5$363.00$419.00$330.00$427.55$650.00$330.00
119Luminaire, high mast, solid state (LED), as per plan (625E26263)EACH42$1,430.00$1,288.00$1,300.00$1,314.29$2,081.00$1,300.00
120Trench (625E29000)FT7,757$11.00$12.30$10.00$12.55$11.00$10.00
121Pull box, 725.08, 18" (625E30700)EACH21$1,650.00$1,053.00$1,500.00$1,074.49$180.00$1,500.00
122Pull box removed and replaced (625E31506)EACH3$1,925.00$1,634.00$1,750.00$1,667.35$2,200.00$1,750.00
123Pull box removed (625E31510)EACH1$525.00$583.00$475.00$594.90$500.00$475.00
124Ground rod (625E32000)EACH48$385.00$314.00$350.00$320.41$170.00$350.00
125Power service, as per plan (625E34001)EACH3$13,750$14,800$12,500$15,102$19,000$12,500
126Control center cabinet, complete (625E34450)EACH3$3,850.00$4,790.00$3,500.00$4,887.76$10,000$3,500.00
127Remove and reerect existing light pole (625E35010)EACH1$1,100.00$870.00$1,000.00$887.76$3,500.00$1,000.00
128Underground warning marking tape (625E36010)FT7,757$1.65$4.30$1.50$4.39$1.50$1.50
129Light pole removed (625E75400)EACH1$635.00$240.00$575.00$244.90$500.00$575.00
130Arc flash calculations and label, control center ( (625E76000)EACH3$4,575.00$2,750.00$4,150.00$2,806.12$2,000.00$4,150.00
131Power cable, 3 conductor, no. 2 AWG (632E69320)FT5,253$14.50$6.20$13.00$6.33$16.00$13.00
132Barrier reflector, type 2, one-way (626E00110)EACH3$16.50$15.00$15.00$15.31$15.00$15.00
133Ground mounted support, no. 3 post (630E03100)FT946$18.15$14.00$15.98$14.29$15.98$16.50
134Sign post reflector (630E08600)EACH11$49.50$49.30$58.49$50.31$58.49$45.00
135Sign, flat sheet (630E80100)SF464.30$22.00$21.50$18.05$21.94$18.05$20.00
136Sign, ground mounted extrusheet (630E80200)SF156$33.00$42.50$37.55$43.37$37.55$30.00
137Removal of ground mounted sign and disposal (630E84900)EACH5$16.50$25.00$17.85$25.51$17.85$15.00
138Removal of ground mounted post support and disposal (630E86002)EACH4$27.50$50.00$23.79$51.02$23.79$25.00
139Edge line, 6" (646E10010)MI0.85$5,200.00$8,150.00$4,735.00$8,150.00$4,735.00$4,735.00
140Edge line, 6" (646E10010)MI0.56$5,200.00$8,150.00$4,735.00$8,150.00$4,735.00$4,735.00
141Center line (646E10200)MI0.18$6,950.00$14,000$6,325.00$14,000$6,325.00$6,325.00
142Stop line (646E10400)FT26$13.50$14.00$12.25$14.00$12.25$12.25
143Crosswalk line, 12" (646E10510)FT580$8.25$4.80$7.50$4.80$7.50$7.50
144Transverse/diagonal line, as per plan (646E10601)FT1,104$2.80$2.55$2.55$2.55$2.55$2.55
145Transverse/diagonal line, as per plan (646E10601)FT156$2.80$2.55$2.55$2.55$2.55$2.55
146Handicap symbol marking (646E10900)EACH6$225.00$125.00$205.00$125.00$205.00$205.00
147Parking lot stall marking (646E20200)FT23,183$2.80$2.55$2.55$2.55$2.55$2.55
148Lane arrow (646E20300)EACH31$215.00$140.00$195.00$140.00$195.00$195.00
149Yield line (646E20800)FT77$17.50$16.00$15.95$16.00$15.95$15.95
150Removal of pavement marking (646E50000)EACH17$126.50$110.00$115.00$110.00$115.00$115.00
151Removal of pavement marking (646E50100)FT14,514$0.60$0.50$0.55$0.50$0.55$0.55
152Portable changeable message sign, as per plan (614E18601)SNMT6$950.00$1,000.00$850.00$1,531.55$880.38$1,000.00
153Premium for contract performance bond and for payment bond (103E05000)LS1$75,000$150,000$150,000$153,584$64,979$75,000
154CPM progress schedule short duration projects (108E30000)LS1$2,900.00$10,000$15,000$7,160.77$8,620.00$30,000
155Maintaining traffic (614E11000)LS1$35,000$500,000$40,000$19,607$162,797$50,000
157Construction layout stakes and surveying (623E10000)LS1$75,000$130,000$75,000$81,300$125,679$150,000
158Mobilization (624E10000)LS1$400,000$2,350,000$700,000$569,689$400,000$750,000
200Pull box, 725.08, 24" (625E30706)EACH4$1,760.00$1,427.00$1,600.00$1,456.12$2,200.00$1,600.00
201Excavation, as per plan (203E10001)CY510$35.00$50.00$20.00$131.35$53.58$32.00
ODOT contract 260524: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of November 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy