KT Holden Construction LLC: ODOT bid record

KT Holden Construction LLC submitted 30 bids on Ohio DOT contracts in the data, from 10 AUG 2023 to 12 NOV 2026, and was the low bidder on 4 of them (13%). When it was not low, its total sat a median +12% above the low bid.

Owner
Ohio DOT
Low bid volume
$7,518,802
Latest bid
12 NOV 2026
Data through
12 NOV 2026
30Bids
4Low bids
13Win rate, percent
+12%Median gap to the low bid when not low, 26 bids

By year

YearBidsLow bidsWin rate
20233133%
20244125%
20251218%
20261119%
KT Holden Construction LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
HAM9222%
WAR500%
HIG300%
CLE300%
CLI3133%
BUT200%
BRO11100%
MOT100%
GRE100%
District 8100%
ADA100%
KT Holden Construction LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH3030 (100%)$1.00$1.00
Water659E35000MGAL3017 (57%)$1.00$1.00
Seeding and mulching659E10000SY2611 (42%)$2.27$2.60
Repair seeding and mulching659E14000SY209 (45%)$2.02$1.25
Lime659E31000ACRE278 (30%)$200.00$150.00
Sealing of concrete surfaces (epoxy-urethane)512E10100SY158 (53%)$40.00$34.00
Subgrade compaction204E10000SY197 (37%)$3.30$3.00
Commercial fertilizer659E20000TON306 (20%)$1,500.00$850.00
RPM621E00100EACH116 (55%)$200.00$52.92
Removal of ground mounted sign and disposal630E84900EACH96 (67%)$16.56$20.00
Embankment203E20000CY255 (20%)$27.00$25.00
Pavement removed202E23000SY175 (29%)$22.50$17.00
KT Holden Construction LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

KT Holden Construction LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260524WARWAR-IR 71 Rest Areas TP (PARKING AREAS)4 of 7$15,358,367+13%
29 OCT 2026260454ADAADA-SR 247-14.51/15.56 (BRIDGE REPLACEMENT (2 BRIDGES))4 of 5$5,286,695+8.0%
01 OCT 2026264025CLICLI-SR 72-02.18 (CULVERT REPLACEMENT)1 of 5$296,299Low, 13% under the second
27 AUG 2026260379BUTBUT-SR 129-09.09/09.20 (BRIDGE REPAIR)4 of 5$798,401+26%
30 JUL 2026260349HAMHAM-Inverts FY2027 (CULVERT REPLACEMENT)3 of 5$2,082,813+10%
21 MAY 2026268010District 8D08-Davids Drive Reconstruction (MINOR RECONSTRUCTION)4 of 5$2,235,528+9.0%
07 MAY 2026260238HAMHAM-Columbia Connector (BIKEWAYS)2 of 3$2,172,181+8.0%
23 APR 2026260225WARWAR-Central Greenway SUP Seg D (BIKEWAYS)3 of 5$787,976+13%
26 MAR 2026260144CLECLE-US 50-02.25 (BRIDGE REPAIR)4 of 5$755,619+15%
12 MAR 2026260122HAMHAM-CR 299-05.78 Loveland Madeira (SIDEWALK)2 of 5$1,871,213+4.0%
29 JAN 2026260049CLECLE-SR 132-12.64 (BRIDGE REPAIR)5 of 5$631,523+11%
13 NOV 2025250526HIGHIG-SR 73-00.26 (BRIDGE REPLACEMENT (1 BRIDGE))7 of 8$2,336,827+34%
11 SEP 2025250412HIGHIG-US 62-17.10 (BRIDGE REPAIR)3 of 3$323,890+46%
28 AUG 2025250376CLICLI-SR 134-02.25 (BRIDGE REPAIR)4 of 4$2,077,664+30%
17 JUL 2025250342CLICLI-SR 28-16.91 (BRIDGE REPAIR)2 of 4$595,954+29%
26 JUN 2025250319HAMHAM-IR 74-11.25 (MISCELLANEOUS)2 of 4$440,069+3.0%
22 MAY 2025250277HAMHAM-SR 264-10.42 (RELOCATION)1 of 5$2,212,186Low, 4.0% under the second
10 APR 2025250189BUTBUT-SR 126-02.92 (SLIDE REPAIR)2 of 5$5,397,265+5.0%
10 APR 2025254013GREGRE-IR 675-09.60, GRE-US 35-18.46 (CULVERT REPLACEMENT)3 of 5$1,296,330+24%
27 MAR 2025250182HAMHAM-IR 71-08.24 Ramp T (MISCELLANEOUS)6 of 6$841,288+66%
27 FEB 2025250136WARWAR-US 42-20.23 (INTERSECTION)2 of 5$1,303,469+1.0%
13 FEB 2025250097MOTMOT-Sycamore Creek Bridge Replac (BRIDGE REPLACEMENT (1 BRIDGE))4 of 7$558,540+18%
16 JAN 2025240582HAMHAM-US 52-36.85 (SLIDE REPAIR)2 of 9$1,956,795+1.0%
05 DEC 2024240563WARWAR-SR 350-08.73 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 7$4,122,504+2.0%
14 NOV 2024240525HAMHAM-Culverts FY25 (CULVERT REPLACEMENT)2 of 5$491,597+11%
KT Holden Construction LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy