ODOT contract 250526 bid tabulation

HIG-SR 73-00.26 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on November 13, 2025, HIG. 8 bids received; low bid $1,743,419 by D G M Inc, -18% against the engineer's estimate of $2,125,000.

Owner
Ohio DOT
Letting
13 NOV 2025
Pay items
103
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1D G M Inc$1,743,419Low-18%
2George J Igel & Co Inc$2,046,912+17%-4.0%
3Alan Stone Co Inc$2,091,921+20%-2.0%
4Double Z Construction Company$2,139,927+23%+1.0%
5Complete General Construction Company$2,192,366+26%+3.0%
6Sunesis Construction Co$2,306,371+32%+9.0%
7KT Holden Construction LLC$2,336,827+34%+10%
8Eagle Bridge Co$2,348,246+35%+11%
ODOT contract 250526: bids by rank

Engineer's estimate: $2,125,000.

Bid tabulation

LinePay itemUnitQuantity1. D G M Inc2. George J Igel & Co Inc3. Alan Stone Co Inc4. Double Z Construction Company5. Complete General Construction Company6. Sunesis Construction Co
1Clearing and grubbing (201E11000)LS1$20,000$22,500$25,000$20,000$5,000.00$20,824
2Pavement removed (202E23000)SY1,611$4.00$14.25$20.00$18.00$12.50$7.11
3Pipe removed, 24" and under (202E35100)FT207$15.00$15.00$20.00$15.00$50.00$27.69
4Fence removed (202E75000)FT8$15.00$12.00$60.00$15.00$50.00$20.55
5Removal misc.: concrete retaining wall (202E98000)LS1$6,000.00$2,500.00$4,700.00$1,800.00$8,000.00$1,085.76
6Excavation (203E10000)CY446$20.00$25.00$55.00$25.00$35.00$2.66
7Embankment (203E20000)CY721$22.50$20.00$15.00$30.00$35.00$36.74
8Subgrade compaction (204E10000)SY2,551$3.00$4.00$4.00$5.00$5.50$2.62
9Proof rolling (204E45000)HR2$75.00$132.00$280.00$200.00$375.00$426.91
10Guardrail, type MGS (606E15050)FT275$25.00$23.00$25.00$21.00$36.94$23.00
11Anchor assembly, MGS type E (MASH 2016) (606E26150)EACH2$2,600.00$2,550.00$2,900.00$2,500.00$2,400.00$2,550.00
12Anchor assembly, MGS type T (606E26550)EACH2$1,450.00$1,400.00$1,400.00$1,200.00$1,100.00$1,400.00
13MGS bridge terminal assembly, type TST-2 (606E34600)EACH4$2,800.00$2,750.00$2,900.00$2,500.00$2,290.00$2,750.00
14Monument assembly, type C (623E38500)EACH1$1,000.00$1,300.00$3,500.00$1,600.00$2,000.00$3,038.81
15Right-of-way monument, type B (623E40520)EACH3$300.00$350.00$340.00$500.00$1,000.00$283.34
16Special - mailbox removed and reset (690E50350)EACH2$200.00$500.00$220.00$300.00$220.00$273.92
17Rock channel protection, type B with geotextile fabric (601E32104)CY81$120.00$140.00$180.00$135.00$95.00$224.39
18Topsoil (659E00300)CY371$17.50$10.25$15.00$50.00$25.00$33.13
19Seeding and mulching (659E10000)SY2,717$2.00$3.50$2.00$5.00$1.30$2.74
20Repair seeding and mulching (659E14000)SY136$0.05$1.30$1.00$1.30$1.30$1.30
21Commercial fertilizer (659E20000)TON0.37$1,500.00$1,250.00$1,700.00$1,250.00$1,250.00$1,250.00
22Lime (659E31000)ACRE0.56$300.00$150.00$230.00$150.00$150.00$150.00
23Water (659E35000)MGAL15$1.00$1.00$1.00$1.00$1.00$1.00
24Slope erosion protection (670E00500)SY623$2.50$2.50$3.00$2.50$2.50$2.50
25Storm water pollution prevention plan (832E15000)LS1$2,500.00$2,000.00$3,100.00$2,700.00$2,000.00$2,700.00
26Storm water pollution prevention inspections (832E15002)LS1$10,000$8,850.00$9,800.00$6,420.00$9,550.00$6,420.02
27Storm water pollution prevention inspection software (832E15010)LS1$12,000$9,100.00$14,000$13,000$12,500$12,073
28Erosion control (832E30000)EACH16,309$1.00$1.00$1.00$1.00$1.00$1.00
29Aggregate drains (605E31100)FT244$25.00$48.00$35.00$20.00$20.00$19.45
306" conduit, type E (611E01400)FT30$10.00$36.00$40.00$8.00$10.00$23.02
316" conduit, type F (611E01500)FT30$8.00$36.00$55.00$8.00$10.00$23.02
3212" conduit, type D (611E04900)FT136$80.00$85.00$150.00$80.00$105.00$79.02
33Catch basin, no. 2-2B (611E98470)EACH2$1,300.00$2,500.00$8,100.00$3,000.00$4,000.00$1,726.89
34Catch basin adjusted to grade (611E98630)EACH1$400.00$2,300.00$2,000.00$900.00$1,500.00$898.87
35Pavement planing, asphalt concrete (1.5") (254E01000)SY135$15.00$15.00$65.00$14.00$14.00$14.00
36Asphalt concrete base, PG64-22, (449) (301E56000)CY510$220.00$220.00$250.00$210.00$210.00$210.00
37Aggregate base (304E20000)CY430$77.50$92.00$110.00$95.00$95.00$98.74
38Tack coat (407E10000)GAL402$4.50$10.50$5.00$4.50$4.50$4.50
39Traffic compacted surface, type A or B (410E12000)CY25$40.00$68.10$130.00$90.00$95.00$109.06
40Traffic compacted surface, type C (410E13000)CY25$45.00$82.05$90.00$75.00$95.00$109.06
41Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY180$265.00$295.00$340.00$265.00$265.00$265.00
42Asphalt concrete surface course, type 1, (449), (driveways) (441E70500)CY3$720.00$600.00$2,100.00$700.00$700.00$700.00
43Rumble stripes, edge line (asphalt concrete) (618E40800)FT1,089$4.00$10.00$7.00$8.00$7.00$4.63
44Rumble stripes, center line (asphalt concrete) (618E40900)FT842$4.00$10.00$7.50$8.00$9.00$4.00
45RPM (621E00100)EACH8$292.00$475.00$550.00$290.00$475.00$290.00
46Raised pavement marker removed (621E54000)EACH8$1.00$30.00$140.00$15.00$50.00$24.34
47Barrier reflector, type 3 (BI-directional) (626E00112)EACH12$15.00$13.00$15.00$12.00$10.00$12.23
48Ground mounted support, no. 3 post (630E03100)FT36.40$18.00$16.00$20.00$16.00$15.00$30.21
49Sign post reflector (630E08600)EACH1$60.00$55.00$65.00$55.00$30.00$89.72
50Sign, flat sheet (630E80100)SF27$18.00$16.00$20.00$16.00$30.00$32.22
51Removal of ground mounted sign and disposal (630E84900)EACH11$15.00$20.00$25.00$20.00$15.00$16.56
52Removal of ground mounted post support and disposal (630E86002)EACH9$15.00$25.00$75.00$25.00$15.00$22.08
53Edge line, 6", type 1 (642E00104)MI0.24$6,000.00$5,500.00$5,700.00$5,000.00$5,500.00$5,000.00
54Center line, type 1 (642E00300)MI0.12$6,000.00$10,500$6,300.00$5,500.00$10,500$5,500.00
55Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384)EACH12$2,000.00$2,500.00$2,300.00$1,951.07$1,950.00$1,951.07
56Detour signing (614E12420)LS1$8,000.00$6,000.00$6,900.00$4,775.00$6,000.00$9,952.52
57Barrier reflector, type 1 (BI-directional) (614E13310)EACH32$20.00$44.00$50.00$15.00$44.00$10.05
58Barrier reflector, type 3 (BI-directional) (614E13314)EACH5$20.00$50.00$60.00$15.00$50.00$11.18
59Object marker, two way (614E13360)EACH37$20.00$40.00$45.00$15.00$40.00$19.88
60Work zone edge line, class I, 6" (614E22010)MI0.93$4,000.00$3,652.00$4,000.00$3,500.00$3,652.00$3,500.00
61Work zone stop line, class I (614E26000)FT48$10.00$14.00$8.00$7.00$14.00$7.00
62Pavement for maintaining traffic, class B (615E25000)SY123$125.00$85.00$120.00$175.00$200.00$178.95
63Water (616E10000)MGAL6$1.00$62.15$0.20$50.00$100.00$14.99
64Portable barrier, unanchored (622E41100)FT1,210$18.00$28.00$20.00$24.00$27.50$27.82
65Portions of structure removed, over 20 foot span (202E11202)LS1$76,500$82,500$37,000$105,000$137,000$35,572
66Approach slab removed (202E22900)SY94$25.00$60.00$130.00$65.00$65.00$41.86
67Wearing course removed (202E23500)SY265$8.00$8.50$20.00$33.00$55.00$5.41
68Cofferdams and excavation bracing, as per plan (503E11101)LS1$94,000$70,000$65,000$180,000$82,500$73,547
69Unclassified excavation (503E21300)LS1$11,000$91,000$10,000$50,000$80,000$25,448
70Rock excavation (503E31100)CY85$60.00$120.00$150.00$170.00$50.00$97.24
71Epoxy coated steel reinforcement (509E10000)LB38,585$1.35$1.60$1.50$1.70$1.75$2.06
72Semi-integral diaphragm guide (511E33500)EACH2$2,400.00$4,325.00$6,800.00$3,500.00$7,475.00$3,109.06
73Class QC2 concrete with QC/QA, bridge deck (511E34446)CY105$1,575.00$2,100.00$2,400.00$1,785.00$1,600.00$2,993.05
74Class QC1 concrete with QC/QA, abutment not including footing (511E44112)CY92$685.00$1,095.00$1,000.00$960.00$1,150.00$1,212.18
75Class QC1 concrete with QC/QA, footing (511E46512)CY75$635.00$895.00$900.00$690.00$950.00$1,110.15
76Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY167$40.00$32.00$45.00$40.00$40.00$40.00
77Sealing concrete bridge decks with HMWM resin (512E10300)SY20$40.00$60.00$30.00$36.00$100.00$71.61
78Type 2 waterproofing (512E33000)SY33$25.00$38.05$95.00$36.00$75.00$44.11
79Structural steel members, level 1, as per plan (513E10221)LB71,028$2.84$3.05$3.50$3.10$3.00$4.04
80Welded stud shear connectors (513E20000)EACH2,664$7.00$5.90$6.50$5.90$5.80$6.31
812" preformed expansion joint filler (516E13900)SF54$25.00$12.00$4.00$19.00$11.00$5.64
82Semi-integral abutment expansion joint seal (516E14020)FT118$47.50$35.00$25.00$32.00$50.00$54.48
83Elastomeric bearing with internal laminates and load plate, as per plan (516E44001)EACH12$2,100.00$2,450.00$1,600.00$2,000.00$1,500.00$2,296.78
84Railing (three steel tube bridge railing) (517E70100)FT134$475.00$464.79$510.00$455.00$465.00$457.00
85Porous backfill with geotextile fabric (518E21200)CY79$120.00$175.00$200.00$120.00$150.00$105.97
86Special - steel drip strip (518E22300)FT147$20.00$15.00$60.00$30.00$16.50$16.50
876" perforated corrugated plastic pipe (518E40000)FT168$20.00$8.00$5.00$13.00$15.00$9.10
886" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011)FT40$60.00$60.00$55.00$13.00$25.00$15.38
89Drilled shafts, 30" diameter, into bedrock (524E94604)FT160$600.00$385.00$330.00$600.00$725.00$438.62
90Drilled shafts, 36" diameter, into bedrock (524E94704)FT9$600.00$270.00$990.00$715.00$550.00$369.82
91Reinforced concrete approach slabs with QC/QA (T=1 (526E25010)SY200$320.00$475.00$520.00$425.00$450.00$514.56
92Type A installation (526E90010)FT88$250.00$265.00$210.00$250.00$300.00$225.97
93Structure grounding system (625E33000)EACH1$20,000$15,500$21,000$15,000$10,000$12,375
94Premium for contract performance bond and for payment bond (103E05000)LS1$21,000$10,000$15,000$14,000$13,000$12,704
95Maintaining traffic (614E11000)LS1$110,000$67,000$100,000$90,000$110,000$226,848
96Field office, type A (619E16000)MNTH6$750.00$1,900.00$1,000.00$2,000.00$2,000.00$2,885.00
97Construction layout stakes and surveying (623E10000)LS1$6,000.00$15,000$25,000$14,900$20,000$23,750
98Preconstruction survey monument verification and report (623E50000)LS1$1,000.00$3,650.00$3,400.00$1,500.00$3,000.00$3,100.00
99Post construction survey monument verification and report (623E51000)LS1$1,000.00$3,550.00$3,400.00$1,500.00$3,000.00$3,100.00
100Mobilization (624E10000)LS1$40,000$100,000$55,000$100,000$109,000$104,705
200Pavement planing, asphalt concrete(1.0?) (254E01000)SY354$30.00$22.00$28.00$31.46$28.00$28.00
201Roads for maintaining traffic (615E10000)LS1$2,000.00$8,500.00$16,000$10,000$18,000$10,015
202Work zone center line, class I (614E21000)MI0.20$4,000.00$7,800.00$11,208$3,500.00$10,500$3,500.00
ODOT contract 250526: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy