George J Igel & Co Inc: ODOT bid record
George J Igel & Co Inc submitted 132 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 MAR 2026, and was the low bidder on 13 of them (10%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $25,349,410
- Latest bid
- 12 MAR 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 29 | 3 | 10% |
| 2021 | 32 | 4 | 13% |
| 2022 | 17 | 1 | 6% |
| 2023 | 21 | 1 | 5% |
| 2024 | 16 | 3 | 19% |
| 2025 | 14 | 1 | 7% |
| 2026 | 3 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| LIC | 10 | 2 | 20% |
| MRG | 10 | 0 | 0% |
| FRA | 10 | 1 | 10% |
| ATH | 9 | 1 | 11% |
| PIK | 7 | 0 | 0% |
| HIG | 6 | 0 | 0% |
| PER | 6 | 1 | 17% |
| WAS | 6 | 0 | 0% |
| MEG | 6 | 0 | 0% |
| SCI | 5 | 2 | 40% |
| BRO | 5 | 0 | 0% |
| LAW | 4 | 1 | 25% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 133 | 133 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 128 | 110 (86%) | $1.00 | $1.00 |
| Lime | 659E31000 | ACRE | 124 | 54 (44%) | $150.00 | $150.00 |
| Center line, type 1 | 642E00300 | MI | 79 | 40 (51%) | $6,520.00 | $5,500.00 |
| Edge line, 6", type 1 | 642E00104 | MI | 64 | 38 (59%) | $3,900.00 | $3,200.00 |
| Commercial fertilizer | 659E20000 | TON | 124 | 35 (28%) | $878.71 | $850.00 |
| Guardrail, type MGS | 606E15050 | FT | 83 | 34 (41%) | $21.60 | $22.73 |
| Aggregate base | 304E20000 | CY | 113 | 33 (29%) | $88.00 | $90.00 |
| Repair seeding and mulching | 659E14000 | SY | 72 | 29 (40%) | $1.40 | $1.25 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 55 | 27 (49%) | $25.50 | $34.00 |
| Anchor assembly, MGS type T | 606E26550 | EACH | 48 | 25 (52%) | $1,130.00 | $1,260.00 |
| RPM | 621E00100 | EACH | 63 | 23 (37%) | $200.00 | $52.92 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 114 | 72 of 114 |
| Complete General Construction Company | 91 | 38 of 91 |
| Alan Stone Co Inc | 58 | 37 of 58 |
| D G M Inc | 46 | 28 of 46 |
| Ohio-West Virginia Excavating Co | 40 | 26 of 40 |
| Double Z Construction Company | 31 | 14 of 31 |
| Sunesis Construction Co | 31 | 10 of 31 |
| Allard Excavation LLC | 15 | 8 of 15 |
| Kokosing Construction Company Inc | 15 | 7 of 15 |
| Eagle Bridge Co | 13 | 11 of 13 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 MAR 2026 | 260134 | SCI | SCI-SR 125-06.26 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 7 | $2,024,403 | +3.0% |
| 19 FEB 2026 | 260087 | JAC | JAC-SR 788-00.87 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 8 | $1,104,864 | +12% |
| 15 JAN 2026 | 260018 | HIG | HIG-SR 73-21.04 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 4 | $2,265,279 | +1.0% |
| 13 NOV 2025 | 250526 | HIG | HIG-SR 73-00.26 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 8 | $2,046,912 | +17% |
| 13 NOV 2025 | 250533 | ROS | ROS-SR 138-17.28 (BRIDGE REPLACEMENT (1 BRIDGE)) | 6 of 7 | $2,955,273 | +20% |
| 23 OCT 2025 | 250503 | MRG | MRG-SR 555-23.05 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 4 | $1,499,994 | +9.0% |
| 23 OCT 2025 | 250512 | FRA | FRA-EXPO CENTER/OHC-FY2026 (PARKING AREAS) | 4 of 7 | $1,174,917 | +15% |
| 25 SEP 2025 | 250435 | DEL | DEL-SR 315-05.00/06.40/08.10 (SLIDE REPAIR) | 1 of 6 | $3,329,777 | Low, 21% under the second |
| 25 SEP 2025 | 250443 | UNI | UNI-SR 38-03.21 (BRIDGE REPAIR) | 4 of 4 | $5,093,937 | +18% |
| 28 AUG 2025 | 250396 | ROS | ROS-SR 772-07.64 (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 8 | $1,836,632 | +11% |
| 22 MAY 2025 | 258011 | ATH | ATH-Madison St Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $2,049,514 | +10% |
| 08 MAY 2025 | 250246 | FRA | FRA-Wynne Ridge Court (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $1,696,028 | +6.0% |
| 08 MAY 2025 | 250259 | PER | PER-TR 1180-00.605 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $774,566 | +18% |
| 27 MAR 2025 | 258000 | UNI | UNI-SR 37-12.24 (BRIDGE REPAIR) | 4 of 4 | $2,433,242 | +21% |
| 27 FEB 2025 | 250128 | MEG | MEG-US 33-13.98 (MAJOR WIDENING) | 3 of 6 | $36,145,902 | +16% |
| 16 JAN 2025 | 240582 | HAM | HAM-US 52-36.85 (SLIDE REPAIR) | 3 of 9 | $1,967,630 | +2.0% |
| 16 JAN 2025 | 250018 | LIC | LIC-SR 37-19.18 (PART 1) (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 3 | $5,317,418 | +8.0% |
| 14 NOV 2024 | 240515 | CLA | CLA-US 42-08.20 (BRIDGE REPLACEMENT (1 BRIDGE)) | 9 of 12 | $1,137,627 | +21% |
| 14 NOV 2024 | 240540 | LOG | LOG-SR 273-00.02 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 3 | $1,109,012 | Low, 6.0% under the second |
| 31 OCT 2024 | 240502 | MUS | MUS-SR 146-29.36 (SLIDE REPAIR) | 5 of 8 | $880,738 | +28% |
| 26 SEP 2024 | 240428 | FRA | FRA-SR 161-15.80 Noise Abatement (NOISE WALLS) | 4 of 6 | $8,789,318 | +11% |
| 26 SEP 2024 | 240439 | GRE | GRE-SR 72-07.71 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 4 | $3,289,032 | +33% |
| 08 AUG 2024 | 240393 | SCI | SCI-SR 335-10.31 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 7 | $2,058,960 | +6.0% |
| 23 MAY 2024 | 240267 | FRA | FRA-IR 270-00.96/01.52 (BRIDGE REPAIR) | 4 of 4 | $6,388,035 | +6.0% |
| 23 MAY 2024 | 240314 | ATH | ATH-SR 690-04.21 (SLIDE REPAIR) | 4 of 5 | $769,525 | +21% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.