ODOT contract 260134 bid tabulation

SCI-SR 125-06.26 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on March 12, 2026, SCI. 7 bids received; low bid $1,965,728 by Complete General Construction Company, +12% against the engineer's estimate of $1,760,000.

Owner
Ohio DOT
Letting
12 MAR 2026
Pay items
84
Data through
12 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Complete General Construction Company$1,965,728Low+12%
2R C Construction Company and Son Inc$1,979,273+1.0%+12%
3George J Igel & Co Inc$2,024,403+3.0%+15%
4Double Z Construction Company$2,033,755+3.0%+16%
5Sunesis Construction Co$2,097,336+7.0%+19%
6Axis Civil Construction LLC$2,128,388+8.0%+21%
7D G M Inc$2,217,459+13%+26%
ODOT contract 260134: bids by rank

Engineer's estimate: $1,760,000.

Bid tabulation

LinePay itemUnitQuantity1. Complete General Construction Company2. R C Construction Company and Son Inc3. George J Igel & Co Inc4. Double Z Construction Company5. Sunesis Construction Co6. Axis Civil Construction LLC
1Clearing and grubbing (201E11000)LS1$27,000$20,000$33,750$8,000.00$15,000$10,000
2Pavement removed (202E23000)SY781$28.00$25.00$18.00$25.00$11.95$14.00
3Guardrail removed (202E38000)FT374$3.00$5.00$7.00$6.00$1.65$6.00
4Excavation (203E10000)CY106$35.00$25.00$27.00$50.00$7.56$32.00
5Embankment (203E20000)CY812$37.00$35.00$47.00$35.00$16.82$42.00
6Subgrade compaction (204E10000)SY1,002$4.00$2.00$5.25$8.00$3.02$3.50
7Proof rolling (204E45000)HR1$130.00$100.00$112.00$200.00$386.18$250.00
8Guardrail, type MGS (606E15050)FT87.50$43.00$45.00$32.00$42.80$42.80$42.80
9Guardrail, type MGS with long posts (606E15100)FT62.50$46.00$48.00$35.00$45.98$45.98$46.00
10Anchor assembly, MGS type E (MASH 2016) (606E26150)EACH3$2,380.00$2,450.00$2,700.00$2,380.00$2,380.00$2,380.00
11Anchor assembly, MGS type T (606E26550)EACH1$1,100.00$1,300.00$1,400.00$1,100.00$1,100.00$1,100.00
12MGS bridge terminal assembly, type TST-2 (606E34600)EACH4$2,340.00$2,500.00$2,800.00$2,340.00$2,340.00$2,340.00
13Primary project control monument, type B (623E12010)EACH3$1,500.00$1,000.00$2,000.00$450.00$1,240.38$1,500.00
14Monument assembly, type C (623E38500)EACH2$1,800.00$1,000.00$1,100.00$1,200.00$2,537.19$2,800.00
15Right-of-way monument, type B (623E40520)EACH14$250.00$600.00$320.00$350.00$1,240.38$350.00
16Rock channel protection, type B with geotextile fabric (601E32104)CY199$115.00$100.00$90.00$100.00$121.05$140.00
17Seeding and mulching (659E10000)SY1,670$1.93$10.00$4.15$6.00$4.17$2.00
18Repair seeding and mulching (659E14000)SY84$1.93$0.20$1.93$1.93$7.60$2.00
19Commercial fertilizer (659E20000)TON0.23$1,250.00$2,900.00$1,250.00$1,250.00$500.00$1,250.00
20Lime (659E31000)ACRE0.35$150.00$2,200.00$150.00$150.00$100.00$150.00
21Water (659E35000)MGAL9$1.00$1.00$1.00$1.00$1.00$1.00
22Erosion control (832E30000)EACH6,365$1.00$1.00$1.00$1.00$1.00$1.00
23Aggregate drains (605E31100)FT61$29.00$25.00$60.00$25.00$33.78$24.00
24Asphalt concrete base, PG64-22, (449) (301E56000)CY97$365.00$370.00$365.00$545.00$545.00$390.00
25Aggregate base (304E20000)CY162$135.00$150.00$110.00$100.00$112.59$135.00
26Non-tracking tack coat (407E20000)GAL76$4.10$10.00$4.10$4.50$4.50$7.00
27Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000)CY24$580.00$590.00$580.00$695.00$695.00$450.00
28Asphalt concrete intermediate course, type 2, (449) (441E70300)CY33$380.00$385.00$380.00$625.00$625.00$420.00
29Barrier reflector, type 3 (BI-directional) (626E00112)EACH10$10.00$10.00$14.00$10.00$13.98$10.00
30Ground mounted support, no. 3 post (630E03100)FT51$12.00$30.00$18.00$12.00$12.00$12.00
31Sign post reflector (630E08600)EACH1$26.00$250.00$75.00$26.00$26.00$26.00
32Sign, flat sheet (630E80100)SF6.30$35.00$45.00$20.00$35.00$35.00$35.00
33Removal of ground mounted sign and disposal (630E84900)EACH1$10.00$100.00$40.00$10.00$10.00$10.00
34Removal of ground mounted sign and reerection (630E85100)EACH4$60.00$250.00$75.00$60.00$60.00$60.00
35Removal of ground mounted post support and disposal (630E86002)EACH4$15.00$100.00$45.00$15.00$15.00$15.00
36Edge line, 6", type 1 (642E00104)MI0.23$4,500.00$10,000$9,900.00$4,500.00$9,900.00$9,900.00
37Center line, type 1 (642E00300)MI0.11$4,500.00$18,500$13,200$4,500.00$13,200$13,200
38Stop line, type 1 (642E00500)FT20$8.00$20.00$7.50$8.00$7.50$7.50
39Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384)EACH7$2,000.00$3,000.00$2,200.00$1,988.53$2,200.00$2,450.00
40Barrier reflector, type 1(BI-directional) (614E13310)EACH21$40.00$20.00$17.00$20.00$13.39$16.00
41Barrier reflector, type 3 (BI-directional) (614E13314)EACH3$40.00$20.00$21.00$20.00$13.39$40.00
42Object marker, two way (614E13360)EACH23$20.00$50.00$20.00$20.00$19.88$35.00
43Work zone edge line, class III, 6", 642 paint (614E22360)MI0.56$3,500.00$10,000$9,385.00$3,500.00$9,385.00$9,385.00
44Work zone stop line, class III, 642 paint (614E26610)FT44$8.00$100.00$20.00$8.00$20.00$20.00
45Roads for maintaining traffic (615E10000)LS1$35,000$25,000$17,500$25,000$11,999$8,500.00
46Pavement for maintaining traffic, class B (615E25000)SY211$141.50$150.00$90.00$120.00$93.47$100.00
47Water (616E10000)MGAL7$160.00$1.00$52.05$40.00$23.77$1.00
48Portable barrier, unanchored (622E41100)FT740$33.60$35.00$50.50$28.00$40.84$28.00
49Structure removed, over 20 foot span (202E11002)LS1$145,000$30,000$140,000$95,000$72,400$140,000
50Approach slab removed (202E22900)SY107$60.00$25.00$65.00$58.00$56.08$120.00
51Wearing course removed (202E23500)SY364$35.00$30.00$15.00$15.00$7.61$11.00
52Cofferdams and excavation bracing, as per plan (503E11101)LS1$40,000$100,000$50,000$140,000$89,295$90,000
53Unclassified excavation, including rock (503E21320)LS1$60,000$25,000$56,250$73,000$92,981$28,000
54Steel piles HP14X73, furnished, as per plan (507E00301)FT880$110.00$110.00$73.00$70.00$80.77$74.00
55Prebored holes, as per plan (507E92201)FT484$80.00$300.00$310.00$260.00$428.59$390.00
56Epoxy coated steel reinforcement (509E10000)LB34,641$1.88$3.00$1.75$1.75$2.02$2.65
57Class QC2 concrete with QC/QA, superstructure, as per plan (511E31613)CY66$1,650.00$1,750.00$1,600.00$1,600.00$1,777.55$1,650.00
58Class QC1 concrete with QC/QA, abutment not including footing (511E44112)CY155$1,250.00$1,000.00$795.00$995.00$1,033.78$930.00
59Class QC1 concrete with QC/QA, footing (511E46512)CY169$600.00$1,000.00$655.00$525.00$638.81$780.00
60Sealing of concrete surfaces (epoxy-urethane) (512E10100)SY176$36.00$50.00$36.00$37.00$40.49$36.00
61Type 2 waterproofing (512E33000)SY31$50.00$35.00$33.00$40.00$131.33$45.00
62Prestressed concrete composite box beam bridge members, level 1, CB27-48 (515E12070)EACH9$25,500$24,000$28,350$30,700$26,220$25,500
631" preformed expansion joint filler (516E13600)SF122$12.00$25.00$10.05$20.00$6.04$5.00
642" preformed expansion joint filler (516E13900)SF34$14.00$35.00$11.00$22.00$8.00$12.00
65Semi-integral abutment expansion joint seal (516E14020)FT92$46.00$100.00$45.00$40.00$50.34$46.00
661/8" preformed bearing pad, type CDP (516E41100)EACH18$90.00$25.00$120.00$50.00$105.78$80.00
67Elastomeric bearing with internal laminates and load plate (516E44100)EACH36$1,075.00$1,100.00$700.00$800.00$793.53$1,360.00
68Railing (three steel tube bridge railing) (517E70100)FT148$426.00$435.00$445.00$426.00$426.00$426.00
69Prefabricated geocomposite drain (518E20000)SY42$42.00$20.00$35.00$60.00$32.11$45.00
70Porous backfill with geotextile fabric (518E21200)CY93$135.00$150.00$150.00$140.00$110.68$120.00
71Special - steel drip strip (518E22300)FT126$28.00$50.00$22.00$25.00$16.96$31.00
726" perforated corrugated plastic pipe (518E40000)FT190$10.00$25.00$9.00$10.00$4.32$15.00
736" non-perforated corrugated plastic pipe, including specials (518E40010)FT60$28.00$25.00$35.00$20.00$21.21$15.00
74Reinforced concrete approach slabs with QC/QA (T=1 (526E30010)SY240$480.00$275.00$500.00$475.00$485.52$540.00
75Type A installation (526E90010)FT77$260.00$200.00$260.00$230.00$240.88$450.00
76Low strength mortar backfill (type 2) (613E41300)CY110$175.00$175.00$248.00$190.00$233.02$220.00
77Structure grounding system (625E33000)EACH1$17,000$20,000$9,852.00$9,852.00$8,536.00$21,000
78Premium for contract performance bond and for payment bond (103E05000)LS1$13,000$47,000$10,000$12,000$11,671$18,000
79Maintaining traffic (614E11000)LS1$60,000$45,000$92,000$64,000$72,448$75,000
80Field office, type A (619E16000)MNTH6$2,600.00$100.00$1,605.00$2,000.00$1,585.00$3,200.00
81Construction layout stakes and surveying (623E10000)LS1$20,000$12,000$17,000$19,500$59,900$20,000
82Preconstruction survey monument verification and report (623E50000)LS1$2,200.00$1,500.00$3,600.00$500.00$1,000.00$800.00
83Post construction survey monument verification and report (623E51000)LS1$2,200.00$1,500.00$5,600.00$500.00$1,000.00$800.00
84Mobilization (624E10000)LS1$90,000$55,000$100,000$100,000$81,067$95,000
ODOT contract 260134: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

Every contract let that day: ODOT letting of March 12, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy