Axis Civil Construction LLC: ODOT bid record

Axis Civil Construction LLC submitted 349 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 85 of them (24%). When it was not low, its total sat a median +17% above the low bid.

Owner
Ohio DOT
Low bid volume
$60,082,019
Latest bid
12 NOV 2026
Data through
12 NOV 2026
349Bids
85Low bids
24Win rate, percent
+17%Median gap to the low bid when not low, 264 bids

By year

YearBidsLow bidsWin rate
202050816%
2021461430%
2022411127%
2023451022%
2024601932%
2025571323%
2026501020%
Axis Civil Construction LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
LAW22627%
SCI18422%
ATH18633%
MEG17318%
CLE16531%
JAC16425%
PIK1517%
CLI15533%
GAL14536%
ROS14321%
BRO13431%
HIG13215%
Axis Civil Construction LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH337337 (100%)$1.00$1.00
Water659E35000MGAL320277 (87%)$1.00$1.00
Lime659E31000ACRE314174 (55%)$150.00$150.00
Commercial fertilizer659E20000TON31598 (31%)$1,250.00$850.00
Seeding and mulching659E10000SY26095 (37%)$2.48$2.60
Center line, type 1642E00300MI15378 (51%)$11,250$5,500.00
Edge line, 6", type 1642E00104MI13575 (56%)$7,550.00$3,200.00
Subgrade compaction204E10000SY24968 (27%)$3.00$3.00
Guardrail, type MGS606E15050FT10959 (54%)$25.00$22.73
Law enforcement officer with patrol car for assistance614E11110HR13857 (41%)$75.00$80.00
Embankment203E20000CY26356 (21%)$30.00$25.00
Ground mounted support, no. 3 post630E03100FT9851 (52%)$15.50$15.20
Axis Civil Construction LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
Alan Stone Co Inc12351 of 123
D G M Inc9554 of 95
Eclipse Co LLC9519 of 95
R C Construction Company and Son Inc9334 of 93
Complete General Construction Company9322 of 93
Shelly & Sands Inc9150 of 91
Sunesis Construction Co6722 of 67
Allard Excavation LLC5433 of 54
Parker Corporation4933 of 49
Fillmore Construction4527 of 45
Axis Civil Construction LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260493CLICLI-US 68-09.42 (CULVERT REPLACEMENT)4 of 5$291,283+22%
12 NOV 2026260509SCISCI-US 52-13.33 (CULVERT REPLACEMENT)1 of 5$723,107Low, 11% under the second
29 OCT 2026264027CLICLI-/GRE Inverts FY27 (CULVERT REPLACEMENT)3 of 3$1,013,487+28%
15 OCT 2026260481District 9D09-BH-FY2027 (BRIDGE REPAIR)1 of 1$439,985Low
01 OCT 2026260427LAWLAW-SR 93-11.21 Flooding (MINOR RECONSTRUCTION)3 of 4$3,028,712+11%
01 OCT 2026260438VINVIN-SR 278-02.79 (CULVERT REPLACEMENT)5 of 7$740,490+15%
01 OCT 2026264025CLICLI-SR 72-02.18 (CULVERT REPLACEMENT)3 of 5$356,974+20%
27 AUG 2026260381CLECLE-SR 125-14.08 (SIDEWALK)1 of 5$972,510Low, 1.0% under the second
27 AUG 2026260386LAWLAW-VAR South Point-Sidewalk (SIDEWALK)1 of 3$1,158,611Low, 2.0% under the second
27 AUG 2026260390SCISCI-SR 348-17.51 (BRIDGE REPAIR)2 of 3$653,852-23%
27 AUG 2026264021FRAFRA-US 62-04.90 (CULVERT REPLACEMENT)1 of 2$541,249Low, 8.0% under the second
13 AUG 2026260361GALGAL-SR 218-04.81/08.56 (CULVERT REPLACEMENT)1 of 4$894,456Low, 2.0% under the second
13 AUG 2026260367PIKPIK-SR 32-06.60 (BRIDGE REPAIR)4 of 6$833,086+61%
13 AUG 2026260368PIKPIK-SR 32-18.40 (INTERSECTION)4 of 9$3,128,083+10%
16 JUL 2026264018MRGMRG-SR 669-02.09 (CULVERT REPLACEMENT)4 of 4$436,618+18%
25 JUN 2026260324PERPER-SR 345-06.48 (BRIDGE REPAIR)4 of 6$945,964+9.0%
11 JUN 2026260291SCISCI-SR 335-01.72 (CULVERT REPLACEMENT)2 of 2$1,365,189+2.0%
21 MAY 2026260268JACJAC-US 35-18.16 (Safety) (PART 1 AND PART 2) (INTERSECTION)2 of 4$2,481,157+9.0%
21 MAY 2026260270LAWLAW-SR 650-07.16 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 3$2,994,768+4.0%
21 MAY 2026260280FRAFRA-US 33-08.75 Culvert Repl. (CULVERT REPLACEMENT)2 of 2$2,472,520+11%
21 MAY 2026264013District 5D05-CUL FY2026 (A) (CULVERT REPLACEMENT)2 of 2$1,877,320+12%
21 MAY 2026264014WASWAS-SR 60-15.43 (CULVERT REPLACEMENT)2 of 4$585,358+1.0%
07 MAY 2026260236FRAFRA-SR 317/Williams Rd (INTERSECTION)2 of 3$353,191+4.0%
07 MAY 2026260244MUSMUS-SR 555-02.09 (SLIDE REPAIR)4 of 7$265,159+19%
07 MAY 2026260247ROSROS-SR 207-08.31 (CULVERT REPLACEMENT)1 of 4$343,332Low, 21% under the second
Axis Civil Construction LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy