ODOT contract 260270 bid tabulation
LAW-SR 650-07.16 (BRIDGE REPLACEMENT (1 BRIDGE)). Let by Ohio DOT on May 21, 2026, LAW. 3 bids received; low bid $2,867,765 by Alan Stone Co Inc, +4.7% against the engineer's estimate of $2,740,000.
- Owner
- Ohio DOT
- Letting
- 21 MAY 2026
- Pay items
- 108
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Alan Stone Co Inc | $2,867,765 | Low | +5.0% |
| 2 | Axis Civil Construction LLC | $2,994,768 | +4.0% | +9.0% |
| 3 | Complete General Construction Company | $3,138,161 | +9.0% | +15% |
Engineer's estimate: $2,740,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Alan Stone Co Inc | 2. Axis Civil Construction LLC | 3. Complete General Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $30,000 | $35,000 | $10,000 |
| 2 | Pavement removed (202E23000) | SY | 2,612 | $15.00 | $17.00 | $18.00 |
| 3 | Guardrail removed (202E38000) | FT | 459 | $4.50 | $7.00 | $2.00 |
| 4 | Anchor assembly removed, type A (202E42000) | EACH | 2 | $1,000.00 | $800.00 | $325.00 |
| 5 | Anchor assembly removed, type T (202E42040) | EACH | 2 | $500.00 | $800.00 | $525.00 |
| 6 | Excavation (203E10000) | CY | 2,296 | $15.00 | $35.00 | $24.00 |
| 7 | Embankment (203E20000) | CY | 2,972 | $20.00 | $35.00 | $26.00 |
| 8 | Subgrade compaction (204E10000) | SY | 3,023 | $6.50 | $4.00 | $4.00 |
| 9 | Excavation of subgrade (204E13000) | CY | 1,293 | $55.00 | $35.00 | $30.00 |
| 10 | Granular material, type B (204E30010) | CY | 2,029 | $90.00 | $110.00 | $145.00 |
| 11 | Proof rolling (204E45000) | HR | 2 | $280.00 | $300.00 | $130.00 |
| 12 | Geotextile fabric (204E50000) | SY | 3,023 | $2.00 | $1.60 | $2.70 |
| 13 | Guardrail, type MGS (606E15050) | FT | 200 | $25.00 | $37.00 | $23.20 |
| 14 | Anchor assembly, MGS type E (606E26150) | EACH | 3 | $3,000.00 | $2,420.00 | $2,580.00 |
| 15 | Anchor assembly, MGS type T (606E26550) | EACH | 1 | $1,600.00 | $1,200.00 | $1,420.00 |
| 16 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $3,100.00 | $2,200.00 | $2,675.00 |
| 17 | Monument assembly, type C (623E38500) | EACH | 7 | $1,200.00 | $3,000.00 | $1,400.00 |
| 18 | Inspection and compaction testing of unbound materials (878E25000) | LS | 1 | $35,000 | $45,000 | $9,000.00 |
| 19 | Riprap, type D (601E11000) | SY | 14 | $580.00 | $400.00 | $250.00 |
| 20 | Rock channel protection, type B with filter (601E32100) | CY | 695 | $85.00 | $140.00 | $110.00 |
| 21 | Water (616E10000) | MGAL | 6.60 | $0.20 | $1.24 | $140.00 |
| 22 | Topsoil (659E00300) | CY | 349 | $45.00 | $55.00 | $38.00 |
| 23 | Seeding and mulching (659E10000) | SY | 4,501 | $1.50 | $0.90 | $0.90 |
| 24 | Repair seeding and mulching (659E14000) | SY | 226 | $1.00 | $0.90 | $0.90 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.63 | $920.00 | $1,250.00 | $1,250.00 |
| 26 | Lime (659E31000) | ACRE | 0.93 | $2.51 | $150.00 | $150.00 |
| 27 | Water (659E35000) | MGAL | 25 | $0.60 | $1.00 | $1.00 |
| 28 | Slope erosion protection (670E00500) | SY | 523 | $4.00 | $2.00 | $2.00 |
| 29 | Ditch erosion protection (670E00700) | SY | 382 | $4.00 | $2.00 | $2.00 |
| 30 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,200.00 | $2,500.00 | $2,500.00 |
| 31 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $12,000 | $4,050.00 | $4,050.00 |
| 32 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $10,000 | $12,000 | $9,000.00 |
| 33 | Erosion control (832E30000) | EACH | 20,000 | $1.00 | $1.00 | $1.00 |
| 34 | Pipe removed, 24" and under (202E35100) | FT | 131 | $10.00 | $30.00 | $44.00 |
| 35 | Pipe removed, over 24" diameter (202E35200) | FT | 47 | $35.00 | $35.00 | $70.00 |
| 36 | Concrete masonry (602E20000) | CY | 6 | $2,300.00 | $3,000.00 | $1,600.00 |
| 37 | Aggregate drains (605E31100) | FT | 193 | $25.00 | $23.00 | $27.00 |
| 38 | 60" conduit, type A, as per plan, (see sheet P.39 (611E23601) | FT | 91 | $910.00 | $662.00 | $600.00 |
| 39 | 14" X 23" conduit, type D, 706.04 (611E52206) | FT | 61 | $310.00 | $320.00 | $325.00 |
| 40 | 19" X 30" conduit, type A, 706.04 (611E52300) | FT | 45 | $310.00 | $350.00 | $480.00 |
| 41 | Pavement repair (253E02000) | CY | 123 | $290.00 | $250.00 | $514.50 |
| 42 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 122 | $85.00 | $35.00 | $62.25 |
| 43 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 304 | $310.00 | $260.00 | $260.00 |
| 44 | Aggregate base (304E20000) | CY | 502 | $115.00 | $140.00 | $145.00 |
| 45 | Tack coat (407E10000) | GAL | 53 | $3.00 | $4.00 | $4.10 |
| 46 | Non-tracking tack coat (407E20000) | GAL | 311 | $6.50 | $4.10 | $4.10 |
| 47 | Stabilized crushed aggregate (411E10000) | CY | 151 | $130.00 | $110.00 | $150.00 |
| 48 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 147 | $430.00 | $329.00 | $329.00 |
| 49 | Asphalt concrete intermediate course, type 1, (449) (441E70200) | CY | 128 | $410.00 | $329.00 | $329.00 |
| 50 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 10 | $750.00 | $400.00 | $400.00 |
| 51 | RPM (621E00100) | EACH | 36 | $150.00 | $120.00 | $80.00 |
| 52 | Raised pavement marker removed (621E54000) | EACH | 16 | $15.00 | $50.00 | $14.00 |
| 53 | Barrier reflector, type 3, bidirectional (626E00112) | EACH | 8 | $15.00 | $10.00 | $12.50 |
| 54 | Ground mounted support, no. 3 post (630E03100) | FT | 113 | $25.00 | $28.00 | $20.00 |
| 55 | Sign, flat sheet (630E80100) | SF | 47 | $30.00 | $60.00 | $25.00 |
| 56 | Removal of ground mounted sign and disposal (630E84900) | EACH | 7 | $15.00 | $150.00 | $15.00 |
| 57 | Removal of ground mounted sign and reerection (630E85100) | EACH | 3 | $75.00 | $250.00 | $65.00 |
| 58 | Removal of ground mounted post support and disposal (630E86002) | EACH | 2 | $25.00 | $250.00 | $20.00 |
| 59 | Edge line, 6", type 1 (642E00104) | MI | 0.43 | $2,600.00 | $2,250.00 | $3,100.00 |
| 60 | Center line, type 1 (642E00300) | MI | 0.20 | $5,000.00 | $4,295.00 | $3,100.00 |
| 61 | Stop line, type 1 (642E00500) | FT | 9 | $15.00 | $14.00 | $8.00 |
| 62 | Increased barrier delineation (614E11630) | FT | 1,140 | $1.00 | $1.00 | $1.55 |
| 63 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 8 | $3,000.00 | $2,350.00 | $2,020.00 |
| 64 | Detour signing (614E12420) | LS | 1 | $7,900.00 | $6,400.00 | $8,600.00 |
| 65 | Asphalt concrete for maintaining traffic (614E13000) | CY | 123 | $300.00 | $200.00 | $300.00 |
| 66 | Barrier reflector, type 1, bidirectional (614E13310) | EACH | 94 | $30.00 | $16.00 | $10.76 |
| 67 | Barrier reflector, type 2, bidirectional (614E13312) | EACH | 8 | $15.00 | $35.00 | $10.50 |
| 68 | Object marker, two way (614E13360) | EACH | 102 | $35.00 | $35.00 | $18.50 |
| 69 | Work zone edge line, class I, 4", 642 paint (614E22100) | MI | 0.38 | $5,200.00 | $4,250.00 | $7,900.00 |
| 70 | Work zone stop line, class I, 642 paint (614E26200) | FT | 22 | $15.00 | $14.00 | $10.00 |
| 71 | Pavement for maintaining traffic, class B (615E25000) | SY | 297 | $160.00 | $100.00 | $124.50 |
| 72 | Portable barrier, unanchored (622E41100) | FT | 1,230 | $25.00 | $26.00 | $38.00 |
| 73 | Portable barrier, anchored (622E41110) | FT | 160 | $60.00 | $35.00 | $48.00 |
| 74 | Structure removed, as per plan (202E11001) | LS | 1 | $40,000 | $35,000 | $25,000 |
| 75 | Structure removed, over 20 foot span, as per plan (202E11003) | LS | 1 | $71,000 | $110,000 | $275,000 |
| 76 | Wearing course removed (202E23500) | SY | 153 | $60.00 | $14.00 | $27.00 |
| 77 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $55,000 | $150,000 | $165,000 |
| 78 | Unclassified excavation (503E21300) | LS | 1 | $50,000 | $95,000 | $65,000 |
| 79 | Pile driving equipment mobilization (505E11100) | LS | 1 | $100,000 | $36,000 | $20,000 |
| 80 | 12" cast-in-place reinforced concrete piles, driven (507E00500) | FT | 1,185 | $70.00 | $20.00 | $15.00 |
| 81 | 12" cast-in-place reinforced concrete piles, furnished (507E00550) | FT | 1,280 | $56.00 | $90.00 | $80.00 |
| 82 | Epoxy coated steel reinforcement (509E10000) | LB | 20,448 | $2.25 | $3.20 | $1.98 |
| 83 | Class QC2 concrete, superstructure, as per plan (511E31611) | CY | 59 | $2,400.00 | $2,200.00 | $2,100.00 |
| 84 | Class QC1 concrete, substructure (511E50210) | CY | 110 | $800.00 | $1,000.00 | $975.00 |
| 85 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 113 | $50.00 | $55.00 | $45.00 |
| 86 | Type 2 waterproofing (512E33000) | SY | 29 | $90.00 | $45.00 | $42.00 |
| 87 | Prestressed concrete composite box beam bridge members, level 1, CB21-48 (515E12050) | EACH | 8 | $35,000 | $32,000 | $34,000 |
| 88 | 2" preformed expansion joint filler (516E13900) | SF | 33 | $4.00 | $20.00 | $16.00 |
| 89 | Semi-integral abutment expansion joint seal (516E14020) | FT | 69 | $20.00 | $40.00 | $55.00 |
| 90 | 2" deep joint sealer (516E31010) | FT | 69 | $60.00 | $30.00 | $30.00 |
| 91 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 16 | $40.00 | $65.00 | $58.00 |
| 92 | Elastomeric bearing with internal laminates and load plate, as per plan (516E44001) | EACH | 32 | $350.00 | $350.00 | $360.00 |
| 93 | Railing (three steel tube bridge railing) (517E70100) | FT | 169 | $560.00 | $436.00 | $488.00 |
| 94 | Porous backfill with geotextile fabric (518E21200) | CY | 71 | $100.00 | $125.00 | $140.00 |
| 95 | Special - steel drip strip (518E22300) | FT | 144 | $50.00 | $28.00 | $22.00 |
| 96 | 6" perforated corrugated plastic pipe (518E40000) | FT | 127 | $7.00 | $15.00 | $10.00 |
| 97 | 6" non-perforated corrugated plastic pipe, including specials (518E40010) | FT | 59 | $10.00 | $20.00 | $20.00 |
| 98 | Dynamic load testing (523E20000) | EACH | 2 | $5,800.00 | $3,700.00 | $5,500.00 |
| 99 | Reinforced concrete approach slabs (T=13") (526E15000) | SY | 143 | $620.00 | $515.00 | $525.00 |
| 100 | Type A installation (526E90010) | FT | 69 | $400.00 | $250.00 | $400.00 |
| 101 | Structure grounding system, as per plan (625E33001) | EACH | 1 | $20,000 | $20,000 | $17,000 |
| 102 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 | $25,000 | $20,000 |
| 103 | Maintaining traffic (614E11000) | LS | 1 | $80,000 | $75,000 | $80,000 |
| 104 | Field office, type A (619E16000) | MNTH | 6 | $1,500.00 | $2,500.00 | $2,500.00 |
| 105 | Construction layout stakes and surveying (623E10000) | LS | 1 | $35,000 | $40,000 | $40,000 |
| 106 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $4,500.00 | $1,200.00 | $2,300.00 |
| 107 | Post construction survey monument verification and report (623E51000) | LS | 1 | $4,500.00 | $1,200.00 | $2,300.00 |
| 108 | Mobilization (624E10000) | LS | 1 | $75,000 | $100,000 | $150,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 21, 2026. Compiled by Mirage Metrics.