ODOT contract 264013 bid tabulation
D05-CUL FY2026 (A) (CULVERT REPLACEMENT). Let by Ohio DOT on May 21, 2026, District 5. 2 bids received; low bid $1,681,992 by Buds Inc, +10% against the engineer's estimate of $1,525,000.
- Owner
- Ohio DOT
- Letting
- 21 MAY 2026
- Pay items
- 102
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Buds Inc | $1,681,992 | Low | +10% |
| 2 | Axis Civil Construction LLC | $1,877,320 | +12% | +23% |
Engineer's estimate: $1,525,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Buds Inc | 2. Axis Civil Construction LLC |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $25,000 | $55,000 |
| 2 | Structure removed (202E11000) | LS | 1 | $44,000 | $29,000 |
| 3 | Headwall removed (202E20010) | EACH | 5 | $2,200.00 | $1,400.00 |
| 4 | Pavement removed (202E23000) | SY | 518 | $35.00 | $25.00 |
| 5 | Wearing course removed (202E23500) | SY | 57 | $25.00 | $15.00 |
| 6 | Pipe removed, 24" and under (202E35100) | FT | 53 | $65.00 | $50.00 |
| 7 | Pipe removed, over 24" diameter (202E35200) | FT | 178 | $85.00 | $140.00 |
| 8 | Guardrail removed (202E38000) | FT | 784 | $3.00 | $8.00 |
| 9 | Guardrail removed for reuse (202E38200) | FT | 100 | $25.00 | $13.00 |
| 10 | Fence removed (202E75000) | FT | 586 | $5.00 | $5.00 |
| 11 | Removal misc.: existing gas line inside conduit (202E98000) | LS | 1 | $2,000.00 | $2,000.00 |
| 12 | Removal misc.: existing pipe cleanout, 15" to 36" (202E98000) | LS | 1 | $5,000.00 | $3,500.00 |
| 13 | Excavation (203E10000) | CY | 106 | $35.00 | $40.00 |
| 14 | Embankment (203E20000) | CY | 403 | $45.00 | $40.00 |
| 15 | Subgrade compaction (204E10000) | SY | 610 | $6.00 | $4.00 |
| 16 | Guardrail, type MGS with long posts (606E15100) | FT | 1,500 | $30.00 | $29.00 |
| 17 | Guardrail rebuilt, type 5 (606E16500) | FT | 100 | $35.00 | $10.00 |
| 18 | Anchor assembly, MGS type E (606E26150) | EACH | 6 | $2,600.00 | $2,950.00 |
| 19 | Anchor assembly, MGS type T (606E26550) | EACH | 6 | $1,350.00 | $1,650.00 |
| 20 | Fence, snow (607E30000) | FT | 200 | $5.00 | $5.10 |
| 21 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $4,000.00 | $2,500.00 |
| 22 | Post construction survey monument verification and report (623E51000) | LS | 1 | $4,000.00 | $2,500.00 |
| 23 | Riprap, type D (601E11000) | SY | 22 | $245.00 | $500.00 |
| 24 | Rock channel protection, type A with filter (601E32000) | CY | 240 | $120.00 | $145.00 |
| 25 | Rock channel protection, type B with filter (601E32100) | CY | 19 | $125.00 | $165.00 |
| 26 | Rock channel protection, type C with filter (601E32200) | CY | 7 | $135.00 | $250.00 |
| 27 | Seeding and mulching, class 2 (659E00510) | SY | 4,097 | $4.75 | $4.56 |
| 28 | Commercial fertilizer (659E20000) | TON | 0.57 | $1,250.00 | $1,250.00 |
| 29 | Lime (659E31000) | ACRE | 0.87 | $150.00 | $150.00 |
| 30 | Water (659E35000) | MGAL | 13 | $1.00 | $1.00 |
| 31 | Erosion control (832E30000) | EACH | 25,000 | $1.00 | $1.00 |
| 32 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $8,000.00 | $40,000 |
| 33 | Concrete masonry (602E20000) | CY | 10 | $1,750.00 | $2,550.00 |
| 34 | 6" conduit, type E (611E01400) | FT | 50 | $10.00 | $25.00 |
| 35 | 6" conduit, type F (611E01500) | FT | 50 | $10.00 | $25.00 |
| 36 | 12" conduit, type D (611E04900) | FT | 34 | $125.00 | $68.00 |
| 37 | 15" conduit, type C (611E06100) | FT | 50 | $145.00 | $110.00 |
| 38 | 15" conduit, type D (611E06400) | FT | 82 | $152.00 | $85.00 |
| 39 | 21" conduit, type A, as per plan, 707.02 (aluminiz (611E08701) | FT | 8 | $1,078.00 | $750.00 |
| 40 | 72" conduit, type A, as per plan, 706.02, 707.02 ( (611E26001) | FT | 130 | $1,415.00 | $1,120.00 |
| 41 | 53" X 83" conduit, type A, 706.04, as per plan (611E53301) | FT | 70 | $1,100.00 | $1,450.00 |
| 42 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $2,500.00 | $3,600.00 |
| 43 | Conduit renewal using spray applied structural liner, round conduit (833E10000) | FT | 242 | $580.00 | $485.00 |
| 44 | Cured-in-place pipe liner, 15" diameter (899E10000) | FT | 208 | $350.00 | $515.00 |
| 45 | Cured-in-place pipe liner, 21" diameter (899E10000) | FT | 150 | $425.00 | $560.00 |
| 46 | Full depth pavement sawing (252E01500) | FT | 176 | $5.00 | $10.00 |
| 47 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 100 | $400.00 | $550.00 |
| 48 | Aggregate base (304E20000) | CY | 111 | $105.00 | $200.00 |
| 49 | Non-tracking tack coat (407E20000) | GAL | 35 | $35.00 | $5.00 |
| 50 | Prime coat, as per plan (408E10001) | GAL | 216 | $10.00 | $5.00 |
| 51 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 21 | $600.00 | $900.00 |
| 52 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 29 | $500.00 | $950.00 |
| 53 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 17 | $220.00 | $245.00 |
| 54 | Compacted aggregate, as per plan (617E10101) | CY | 31 | $165.00 | $180.00 |
| 55 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 32 | $10.00 | $13.00 |
| 56 | Ground mounted support, no. 3 post (630E03100) | FT | 36 | $15.00 | $46.00 |
| 57 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $15.00 | $18.00 |
| 58 | Removal of ground mounted sign and reerection (630E85100) | EACH | 6 | $50.00 | $59.00 |
| 59 | Removal of ground mounted post support and disposal (630E86002) | EACH | 7 | $15.00 | $23.00 |
| 60 | Edge line, 6", type 1 (642E00104) | MI | 0.10 | $26,500 | $13,000 |
| 61 | Center line, type 1 (642E00300) | MI | 0.05 | $52,000 | $13,000 |
| 62 | Work zone impact attenuator, 24" wide hazards, (unidirectional) (614E12380) | EACH | 2 | $2,100.00 | $2,650.00 |
| 63 | Detour signing, as per plan (614E12421) | LS | 1 | $20,000 | $30,000 |
| 64 | Barrier reflector, type 1 (one way) (614E13310) | EACH | 8 | $10.00 | $16.00 |
| 65 | Object marker, one way (614E13350) | EACH | 6 | $18.00 | $29.00 |
| 66 | Portable changeable message sign, as per plan (614E18601) | SNMT | 8 | $1,500.00 | $1,200.00 |
| 67 | Water (616E10000) | MGAL | 8 | $1.00 | $1.00 |
| 68 | Portable barrier, unanchored (622E41100) | FT | 312 | $23.00 | $45.00 |
| 69 | Precast gravity and semigravity retaining wall (851E10000) | SF | 345 | $120.00 | $102.00 |
| 70 | Natural soil (851E11000) | CY | 24 | $50.00 | $29.00 |
| 71 | On-site assistance (851E14000) | DAY | 3 | $500.00 | $500.00 |
| 72 | Wall drainage system (851E15000) | LS | 1 | $5,000.00 | $12,500 |
| 73 | PGSRW inspection and compaction testing (851E15500) | LS | 1 | $6,500.00 | $2,500.00 |
| 74 | Precast gravity and semigravity retaining wall (851E10000) | SF | 204 | $151.00 | $145.00 |
| 75 | Natural soil (851E11000) | CY | 16 | $25.00 | $45.00 |
| 76 | On-site assistance (851E14000) | DAY | 3 | $500.00 | $500.00 |
| 77 | Wall drainage system (851E15000) | LS | 1 | $5,000.00 | $12,800 |
| 78 | PGSRW inspection and compaction testing (851E15500) | LS | 1 | $7,500.00 | $2,500.00 |
| 79 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $3,000.00 | $15,000 |
| 80 | Unclassified excavation (503E21300) | LS | 1 | $10,000 | $17,000 |
| 81 | Epoxy coated steel reinforcement (509E10000) | LB | 3,000 | $1.58 | $3.60 |
| 82 | Class QC1 concrete, footing (511E46510) | CY | 32 | $945.00 | $920.00 |
| 83 | Class QC1 concrete, headwall (511E46610) | CY | 1 | $3,500.00 | $3,900.00 |
| 84 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 61 | $25.00 | $75.00 |
| 85 | Type 2 waterproofing (512E33000) | SY | 156 | $20.00 | $30.00 |
| 86 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 38 | $32.00 | $35.00 |
| 87 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $4,500.00 | $4,500.00 |
| 88 | 8' X 7' conduit, type A, 706.05, as per plan (611E94921) | FT | 42 | $3,175.00 | $2,350.00 |
| 89 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $3,000.00 | $15,000 |
| 90 | Unclassified excavation (503E21300) | LS | 1 | $10,000 | $17,500 |
| 91 | Epoxy coated steel reinforcement (509E10000) | LB | 2,480 | $1.58 | $3.60 |
| 92 | Class QC1 concrete, footing (511E46510) | CY | 23 | $945.00 | $1,100.00 |
| 93 | Class QC1 concrete, headwall (511E46610) | CY | 1 | $3,500.00 | $3,900.00 |
| 94 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 42 | $25.00 | $75.00 |
| 95 | Type 2 waterproofing (512E33000) | SY | 149 | $20.00 | $30.00 |
| 96 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 30 | $34.00 | $40.00 |
| 97 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $3,500.00 | $6,500.00 |
| 98 | 8' X 5' conduit, type A, 706.05, as per plan (611E94901) | FT | 46 | $2,780.00 | $2,350.00 |
| 99 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $23,000 | $17,500 |
| 100 | Maintaining traffic (614E11000) | LS | 1 | $20,000 | $45,000 |
| 101 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $28,000 | $35,000 |
| 102 | Mobilization (624E10000) | LS | 1 | $70,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 21, 2026. Compiled by Mirage Metrics.