Buds Inc: ODOT bid record

Buds Inc submitted 89 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 30 of them (34%). When it was not low, its total sat a median +13% above the low bid.

Owner
Ohio DOT
Low bid volume
$26,321,914
Latest bid
12 NOV 2026
Data through
12 NOV 2026
89Bids
30Low bids
34Win rate, percent
+13%Median gap to the low bid when not low, 59 bids

By year

YearBidsLow bidsWin rate
202018528%
202118422%
202214321%
202312650%
202411545%
20257343%
20269444%
Buds Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
NOB10440%
PER9444%
MOE8563%
MUS7229%
WAS7343%
LIC7343%
BEL6117%
HOL600%
MRG500%
COS3267%
GUE300%
CAR2150%
Buds Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH8989 (100%)$1.00$1.00
Water659E35000MGAL8273 (89%)$1.00$1.00
Raised pavement marker removed621E54000EACH4738 (81%)$5.00$12.00
Commercial fertilizer659E20000TON8236 (44%)$725.00$850.00
Type 2 waterproofing512E33000SY4223 (55%)$20.00$30.00
Removal of ground mounted post support and disposal630E86002EACH3423 (68%)$15.00$23.50
Tack coat407E10000GAL4021 (53%)$4.00$3.25
Excavation203E10000CY7918 (23%)$28.00$27.00
Sealing of concrete surfaces (epoxy-urethane)512E10100SY4418 (41%)$25.00$34.00
Epoxy coated steel reinforcement509E10000LB2918 (62%)$1.58$2.00
Guardrail removed202E38000FT5317 (32%)$3.00$2.50
Non-tracking tack coat407E20000GAL4317 (40%)$4.00$3.25
Buds Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Buds Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260521GUEGUE-IR 70 EB Rest Area TP (PARKING AREAS)6 of 8$7,957,322+8.0%
29 OCT 2026268021JEFJEF-SR 7-32.95 (SLIDE REPAIR)1 of 3$3,442,043Low, 4.0% under the second
16 JUL 2026264018MRGMRG-SR 669-02.09 (CULVERT REPLACEMENT)2 of 4$406,919+10%
25 JUN 2026260324PERPER-SR 345-06.48 (BRIDGE REPAIR)1 of 6$867,500Low, 0.0% under the second
21 MAY 2026264013District 5D05-CUL FY2026 (A) (CULVERT REPLACEMENT)1 of 2$1,681,992Low, 12% under the second
21 MAY 2026264014WASWAS-SR 60-15.43 (CULVERT REPLACEMENT)3 of 4$632,178+10%
07 MAY 2026260244MUSMUS-SR 555-02.09 (SLIDE REPAIR)1 of 7$222,222Low, 14% under the second
12 MAR 2026260130NOBNOB-TR 392-00.02 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 5$617,938+5.0%
29 JAN 2026260062PERPER-MR 56-00.13 (Buckeye Street) (BRIDGE REPLACEMENT (1 BRIDGE))2 of 7$563,136+1.0%
13 NOV 2025250527JEFJEF-SR 213-18.09 (SLIDE REPAIR)1 of 3$917,531Low, 25% under the second
13 NOV 2025250532NOBNOB-SR 78-01.08 / NOB-SR 83-00.02 (BRIDGE REPAIR)1 of 7$1,657,191Low, 3.0% under the second
25 SEP 2025254025NOBNOB-SR 147-16.82 (CULVERT REPLACEMENT)1 of 4$572,949Low, 3.0% under the second
11 SEP 2025254023ASDASD-SR 39-05.20 (CULVERT REPLACEMENT)4 of 4$478,734+8.0%
10 APR 2025250196NOBNOB-Mill St.-00.07 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 6$1,003,358+30%
27 MAR 2025250163PERPER-MR 280-00.10 (Scotch Hill) (DEMOLITION)3 of 9$176,254+31%
16 JAN 2025240576DELDEL-SR 521-10.32 and Various (BRIDGE REPLACEMENT (2 BRIDGES))2 of 7$2,617,665+2.0%
05 DEC 2024240569MUSMUS-SR 376-05.09 (SLIDE REPAIR)5 of 7$603,944+12%
14 NOV 2024240515CLACLA-US 42-08.20 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 12$938,820Low, 2.0% under the second
31 OCT 2024244022PERPER-SR 13-19.64 (CULVERT REPLACEMENT)1 of 3$1,028,218Low, 20% under the second
17 OCT 2024240475WASWAS-SR 339-08.64 (CULVERT REPLACEMENT)1 of 6$843,743Low, 4.0% under the second
17 OCT 2024244020ROSROS-SR 207-04.75 (BRIDGE REPAIR)2 of 5$598,390+2.0%
26 SEP 2024240433COSCOS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 11$663,865+20%
25 JUL 2024240388MRGMRG-SR 376-14.59 (CULVERT REPLACEMENT)3 of 6$353,723+5.0%
13 JUN 2024244016LICLIC-SR 37-09.63 (CULVERT REPLACEMENT)3 of 5$728,453+13%
04 APR 2024240228BELBEL-SR 147-00.40 (CULVERT REPLACEMENT)1 of 4$313,436Low, 27% under the second
Buds Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy