Buds Inc: ODOT bid record
Buds Inc submitted 89 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 30 of them (34%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $26,321,914
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 18 | 5 | 28% |
| 2021 | 18 | 4 | 22% |
| 2022 | 14 | 3 | 21% |
| 2023 | 12 | 6 | 50% |
| 2024 | 11 | 5 | 45% |
| 2025 | 7 | 3 | 43% |
| 2026 | 9 | 4 | 44% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| NOB | 10 | 4 | 40% |
| PER | 9 | 4 | 44% |
| MOE | 8 | 5 | 63% |
| MUS | 7 | 2 | 29% |
| WAS | 7 | 3 | 43% |
| LIC | 7 | 3 | 43% |
| BEL | 6 | 1 | 17% |
| HOL | 6 | 0 | 0% |
| MRG | 5 | 0 | 0% |
| COS | 3 | 2 | 67% |
| GUE | 3 | 0 | 0% |
| CAR | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 89 | 89 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 82 | 73 (89%) | $1.00 | $1.00 |
| Raised pavement marker removed | 621E54000 | EACH | 47 | 38 (81%) | $5.00 | $12.00 |
| Commercial fertilizer | 659E20000 | TON | 82 | 36 (44%) | $725.00 | $850.00 |
| Type 2 waterproofing | 512E33000 | SY | 42 | 23 (55%) | $20.00 | $30.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 34 | 23 (68%) | $15.00 | $23.50 |
| Tack coat | 407E10000 | GAL | 40 | 21 (53%) | $4.00 | $3.25 |
| Excavation | 203E10000 | CY | 79 | 18 (23%) | $28.00 | $27.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 44 | 18 (41%) | $25.00 | $34.00 |
| Epoxy coated steel reinforcement | 509E10000 | LB | 29 | 18 (62%) | $1.58 | $2.00 |
| Guardrail removed | 202E38000 | FT | 53 | 17 (32%) | $3.00 | $2.50 |
| Non-tracking tack coat | 407E20000 | GAL | 43 | 17 (40%) | $4.00 | $3.25 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 51 | 19 of 51 |
| Alan Stone Co Inc | 41 | 9 of 41 |
| Eclipse Co LLC | 35 | 3 of 35 |
| R C Construction Company and Son Inc | 34 | 9 of 34 |
| Ohio-West Virginia Excavating Co | 33 | 8 of 33 |
| Complete General Construction Company | 31 | 7 of 31 |
| Axis Civil Construction LLC | 26 | 10 of 26 |
| J & J Bridge Company Inc | 14 | 9 of 14 |
| Black Horse Bridge Construction Inc | 13 | 3 of 13 |
| Parker Corporation | 12 | 7 of 12 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260521 | GUE | GUE-IR 70 EB Rest Area TP (PARKING AREAS) | 6 of 8 | $7,957,322 | +8.0% |
| 29 OCT 2026 | 268021 | JEF | JEF-SR 7-32.95 (SLIDE REPAIR) | 1 of 3 | $3,442,043 | Low, 4.0% under the second |
| 16 JUL 2026 | 264018 | MRG | MRG-SR 669-02.09 (CULVERT REPLACEMENT) | 2 of 4 | $406,919 | +10% |
| 25 JUN 2026 | 260324 | PER | PER-SR 345-06.48 (BRIDGE REPAIR) | 1 of 6 | $867,500 | Low, 0.0% under the second |
| 21 MAY 2026 | 264013 | District 5 | D05-CUL FY2026 (A) (CULVERT REPLACEMENT) | 1 of 2 | $1,681,992 | Low, 12% under the second |
| 21 MAY 2026 | 264014 | WAS | WAS-SR 60-15.43 (CULVERT REPLACEMENT) | 3 of 4 | $632,178 | +10% |
| 07 MAY 2026 | 260244 | MUS | MUS-SR 555-02.09 (SLIDE REPAIR) | 1 of 7 | $222,222 | Low, 14% under the second |
| 12 MAR 2026 | 260130 | NOB | NOB-TR 392-00.02 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 5 | $617,938 | +5.0% |
| 29 JAN 2026 | 260062 | PER | PER-MR 56-00.13 (Buckeye Street) (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 7 | $563,136 | +1.0% |
| 13 NOV 2025 | 250527 | JEF | JEF-SR 213-18.09 (SLIDE REPAIR) | 1 of 3 | $917,531 | Low, 25% under the second |
| 13 NOV 2025 | 250532 | NOB | NOB-SR 78-01.08 / NOB-SR 83-00.02 (BRIDGE REPAIR) | 1 of 7 | $1,657,191 | Low, 3.0% under the second |
| 25 SEP 2025 | 254025 | NOB | NOB-SR 147-16.82 (CULVERT REPLACEMENT) | 1 of 4 | $572,949 | Low, 3.0% under the second |
| 11 SEP 2025 | 254023 | ASD | ASD-SR 39-05.20 (CULVERT REPLACEMENT) | 4 of 4 | $478,734 | +8.0% |
| 10 APR 2025 | 250196 | NOB | NOB-Mill St.-00.07 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 6 | $1,003,358 | +30% |
| 27 MAR 2025 | 250163 | PER | PER-MR 280-00.10 (Scotch Hill) (DEMOLITION) | 3 of 9 | $176,254 | +31% |
| 16 JAN 2025 | 240576 | DEL | DEL-SR 521-10.32 and Various (BRIDGE REPLACEMENT (2 BRIDGES)) | 2 of 7 | $2,617,665 | +2.0% |
| 05 DEC 2024 | 240569 | MUS | MUS-SR 376-05.09 (SLIDE REPAIR) | 5 of 7 | $603,944 | +12% |
| 14 NOV 2024 | 240515 | CLA | CLA-US 42-08.20 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 12 | $938,820 | Low, 2.0% under the second |
| 31 OCT 2024 | 244022 | PER | PER-SR 13-19.64 (CULVERT REPLACEMENT) | 1 of 3 | $1,028,218 | Low, 20% under the second |
| 17 OCT 2024 | 240475 | WAS | WAS-SR 339-08.64 (CULVERT REPLACEMENT) | 1 of 6 | $843,743 | Low, 4.0% under the second |
| 17 OCT 2024 | 244020 | ROS | ROS-SR 207-04.75 (BRIDGE REPAIR) | 2 of 5 | $598,390 | +2.0% |
| 26 SEP 2024 | 240433 | COS | COS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 11 | $663,865 | +20% |
| 25 JUL 2024 | 240388 | MRG | MRG-SR 376-14.59 (CULVERT REPLACEMENT) | 3 of 6 | $353,723 | +5.0% |
| 13 JUN 2024 | 244016 | LIC | LIC-SR 37-09.63 (CULVERT REPLACEMENT) | 3 of 5 | $728,453 | +13% |
| 04 APR 2024 | 240228 | BEL | BEL-SR 147-00.40 (CULVERT REPLACEMENT) | 1 of 4 | $313,436 | Low, 27% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.