J & J Bridge Company Inc: ODOT bid record

J & J Bridge Company Inc submitted 45 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 17 SEP 2026, and was the low bidder on 10 of them (22%). When it was not low, its total sat a median +14% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,518,676
Latest bid
17 SEP 2026
Data through
12 NOV 2026
45Bids
10Low bids
22Win rate, percent
+14%Median gap to the low bid when not low, 35 bids

By year

YearBidsLow bidsWin rate
202010110%
20211000%
20227229%
2023200%
20247343%
20253133%
20266350%
J & J Bridge Company Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
BEL9222%
NOB5360%
MUS4125%
MOE300%
HAS300%
PER33100%
MEG200%
WAS200%
GUE2150%
COS200%
TUS200%
PIK100%
J & J Bridge Company Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH4646 (100%)$1.00$1.00
Topsoil659E00300CY1917 (89%)$8.00$45.00
Seeding and mulching659E10000SY2416 (67%)$2.00$2.60
Water616E10000MGAL1814 (78%)$10.00$20.00
Guardrail removed202E38000FT2013 (65%)$2.00$2.50
Removal of ground mounted sign and reerection630E85100EACH1211 (92%)$50.00$75.00
Edge line, 6", type 1642E00104MI1610 (63%)$4,500.00$3,200.00
RPM621E00100EACH1310 (77%)$300.00$52.92
Water659E35000MGAL379 (24%)$10.00$1.00
Soil analysis test659E00100EACH139 (69%)$50.00$115.50
Tack coat407E10000GAL218 (38%)$3.50$3.25
Center line, type 1642E00300MI198 (42%)$8,500.00$5,500.00
J & J Bridge Company Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

J & J Bridge Company Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
17 SEP 2026264023BELBEL-SR 148-20.10 (SLIDE REPAIR)1 of 2$943,435Low, 8.0% under the second
07 MAY 2026260244MUSMUS-SR 555-02.09 (SLIDE REPAIR)2 of 7$252,469+14%
12 MAR 2026260130NOBNOB-TR 392-00.02 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 5$587,916Low, 5.0% under the second
19 FEB 2026260099TUSTUS-W. 3rd Street Bridge (BRIDGE REPAIR)3 of 4$2,159,078+33%
29 JAN 2026260060MOEMOE-TR 2214-00.06 (BRIDGE REPLACEMENT (1 BRIDGE))2 of 5$965,863+5.0%
29 JAN 2026260062PERPER-MR 56-00.13 (Buckeye Street) (BRIDGE REPLACEMENT (1 BRIDGE))1 of 7$559,634Low, 1.0% under the second
18 DEC 2025250593MOEMOE-TR 1004-02.27 (BRIDGE REPLACEMENT (1 BRIDGE))5 of 6$1,788,062+48%
13 NOV 2025250532NOBNOB-SR 78-01.08 / NOB-SR 83-00.02 (BRIDGE REPAIR)2 of 7$1,699,758+3.0%
10 APR 2025250196NOBNOB-Mill St.-00.07 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 6$773,793Low, 15% under the second
05 DEC 2024240569MUSMUS-SR 376-05.09 (SLIDE REPAIR)1 of 7$539,864Low, 7.0% under the second
31 OCT 2024240502MUSMUS-SR 146-29.36 (SLIDE REPAIR)3 of 8$756,655+10%
26 SEP 2024240433COSCOS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE))3 of 11$669,812+21%
26 SEP 2024240443HASHAS-SR 151-14.00 (BRIDGE REPAIR)2 of 4$1,097,906+6.0%
27 JUN 2024240351NOBNOB-CR 250-00.04 (CULVERT REPLACEMENT)1 of 4$269,965Low, 13% under the second
27 JUN 2024240356GUEGUE-1SP-01.07 (BRIDGE REPAIR)1 of 6$69,707Low, 41% under the second
09 MAY 2024240283TUSTUS-Miskimen Drive Sidewalks (SIDEWALK)2 of 3$140,8290.0%
14 DEC 2023230606COSCOS-SR 60-01.34 (BRIDGE REPAIR)3 of 3$279,986+21%
30 NOV 2023230565GUEGUE-IR 70-01.26 (BRIDGE REPAIR)4 of 4$1,639,941+15%
29 SEP 2022220540PERPER-SR 204-09.42 (BRIDGE REPAIR)1 of 5$1,327,839Low, 12% under the second
25 AUG 2022220484District 10D10-CR FY2023 (CULVERT REPLACEMENT)2 of 7$156,951+48%
11 AUG 2022220468MUSMUS-IR 70-25.90 (SLIDE REPAIR)3 of 10$684,859+7.0%
28 APR 2022220262BELBEL-CR 56-33.21/34.26 (SLIDE REPAIR)2 of 7$471,400+10%
17 FEB 2022220097HASHAS-Country Club Rd Sidewalks (SIDEWALK)2 of 6$243,724+9.0%
17 FEB 2022220108PERPER-MR Nuzum 00.04 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 7$349,816Low, 1.0% under the second
27 JAN 2022220068BELBEL-SR 149-06.23 (SLIDE REPAIR)5 of 6$574,941+29%
J & J Bridge Company Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy