J & J Bridge Company Inc: ODOT bid record
J & J Bridge Company Inc submitted 45 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 17 SEP 2026, and was the low bidder on 10 of them (22%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $5,518,676
- Latest bid
- 17 SEP 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 10 | 1 | 10% |
| 2021 | 10 | 0 | 0% |
| 2022 | 7 | 2 | 29% |
| 2023 | 2 | 0 | 0% |
| 2024 | 7 | 3 | 43% |
| 2025 | 3 | 1 | 33% |
| 2026 | 6 | 3 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| BEL | 9 | 2 | 22% |
| NOB | 5 | 3 | 60% |
| MUS | 4 | 1 | 25% |
| MOE | 3 | 0 | 0% |
| HAS | 3 | 0 | 0% |
| PER | 3 | 3 | 100% |
| MEG | 2 | 0 | 0% |
| WAS | 2 | 0 | 0% |
| GUE | 2 | 1 | 50% |
| COS | 2 | 0 | 0% |
| TUS | 2 | 0 | 0% |
| PIK | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 46 | 46 (100%) | $1.00 | $1.00 |
| Topsoil | 659E00300 | CY | 19 | 17 (89%) | $8.00 | $45.00 |
| Seeding and mulching | 659E10000 | SY | 24 | 16 (67%) | $2.00 | $2.60 |
| Water | 616E10000 | MGAL | 18 | 14 (78%) | $10.00 | $20.00 |
| Guardrail removed | 202E38000 | FT | 20 | 13 (65%) | $2.00 | $2.50 |
| Removal of ground mounted sign and reerection | 630E85100 | EACH | 12 | 11 (92%) | $50.00 | $75.00 |
| Edge line, 6", type 1 | 642E00104 | MI | 16 | 10 (63%) | $4,500.00 | $3,200.00 |
| RPM | 621E00100 | EACH | 13 | 10 (77%) | $300.00 | $52.92 |
| Water | 659E35000 | MGAL | 37 | 9 (24%) | $10.00 | $1.00 |
| Soil analysis test | 659E00100 | EACH | 13 | 9 (69%) | $50.00 | $115.50 |
| Tack coat | 407E10000 | GAL | 21 | 8 (38%) | $3.50 | $3.25 |
| Center line, type 1 | 642E00300 | MI | 19 | 8 (42%) | $8,500.00 | $5,500.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 32 | 8 of 32 |
| Ohio-West Virginia Excavating Co | 21 | 9 of 21 |
| R C Construction Company and Son Inc | 17 | 0 of 17 |
| Complete General Construction Company | 16 | 6 of 16 |
| Alan Stone Co Inc | 14 | 5 of 14 |
| Buds Inc | 14 | 5 of 14 |
| Eclipse Co LLC | 13 | 0 of 13 |
| Axis Civil Construction LLC | 12 | 3 of 12 |
| Stanley Miller Construction Company | 8 | 3 of 8 |
| Tucson Inc | 8 | 3 of 8 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 17 SEP 2026 | 264023 | BEL | BEL-SR 148-20.10 (SLIDE REPAIR) | 1 of 2 | $943,435 | Low, 8.0% under the second |
| 07 MAY 2026 | 260244 | MUS | MUS-SR 555-02.09 (SLIDE REPAIR) | 2 of 7 | $252,469 | +14% |
| 12 MAR 2026 | 260130 | NOB | NOB-TR 392-00.02 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 5 | $587,916 | Low, 5.0% under the second |
| 19 FEB 2026 | 260099 | TUS | TUS-W. 3rd Street Bridge (BRIDGE REPAIR) | 3 of 4 | $2,159,078 | +33% |
| 29 JAN 2026 | 260060 | MOE | MOE-TR 2214-00.06 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 5 | $965,863 | +5.0% |
| 29 JAN 2026 | 260062 | PER | PER-MR 56-00.13 (Buckeye Street) (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 7 | $559,634 | Low, 1.0% under the second |
| 18 DEC 2025 | 250593 | MOE | MOE-TR 1004-02.27 (BRIDGE REPLACEMENT (1 BRIDGE)) | 5 of 6 | $1,788,062 | +48% |
| 13 NOV 2025 | 250532 | NOB | NOB-SR 78-01.08 / NOB-SR 83-00.02 (BRIDGE REPAIR) | 2 of 7 | $1,699,758 | +3.0% |
| 10 APR 2025 | 250196 | NOB | NOB-Mill St.-00.07 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 6 | $773,793 | Low, 15% under the second |
| 05 DEC 2024 | 240569 | MUS | MUS-SR 376-05.09 (SLIDE REPAIR) | 1 of 7 | $539,864 | Low, 7.0% under the second |
| 31 OCT 2024 | 240502 | MUS | MUS-SR 146-29.36 (SLIDE REPAIR) | 3 of 8 | $756,655 | +10% |
| 26 SEP 2024 | 240433 | COS | COS-TR 252-00.00 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 11 | $669,812 | +21% |
| 26 SEP 2024 | 240443 | HAS | HAS-SR 151-14.00 (BRIDGE REPAIR) | 2 of 4 | $1,097,906 | +6.0% |
| 27 JUN 2024 | 240351 | NOB | NOB-CR 250-00.04 (CULVERT REPLACEMENT) | 1 of 4 | $269,965 | Low, 13% under the second |
| 27 JUN 2024 | 240356 | GUE | GUE-1SP-01.07 (BRIDGE REPAIR) | 1 of 6 | $69,707 | Low, 41% under the second |
| 09 MAY 2024 | 240283 | TUS | TUS-Miskimen Drive Sidewalks (SIDEWALK) | 2 of 3 | $140,829 | 0.0% |
| 14 DEC 2023 | 230606 | COS | COS-SR 60-01.34 (BRIDGE REPAIR) | 3 of 3 | $279,986 | +21% |
| 30 NOV 2023 | 230565 | GUE | GUE-IR 70-01.26 (BRIDGE REPAIR) | 4 of 4 | $1,639,941 | +15% |
| 29 SEP 2022 | 220540 | PER | PER-SR 204-09.42 (BRIDGE REPAIR) | 1 of 5 | $1,327,839 | Low, 12% under the second |
| 25 AUG 2022 | 220484 | District 10 | D10-CR FY2023 (CULVERT REPLACEMENT) | 2 of 7 | $156,951 | +48% |
| 11 AUG 2022 | 220468 | MUS | MUS-IR 70-25.90 (SLIDE REPAIR) | 3 of 10 | $684,859 | +7.0% |
| 28 APR 2022 | 220262 | BEL | BEL-CR 56-33.21/34.26 (SLIDE REPAIR) | 2 of 7 | $471,400 | +10% |
| 17 FEB 2022 | 220097 | HAS | HAS-Country Club Rd Sidewalks (SIDEWALK) | 2 of 6 | $243,724 | +9.0% |
| 17 FEB 2022 | 220108 | PER | PER-MR Nuzum 00.04 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 7 | $349,816 | Low, 1.0% under the second |
| 27 JAN 2022 | 220068 | BEL | BEL-SR 149-06.23 (SLIDE REPAIR) | 5 of 6 | $574,941 | +29% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.