ODOT contract 260099 bid tabulation
TUS-W. 3rd Street Bridge (BRIDGE REPAIR). Let by Ohio DOT on February 19, 2026, TUS. 4 bids received; low bid $1,626,062 by Black Horse Bridge Construction Inc, -5.2% against the engineer's estimate of $1,715,000.
- Owner
- Ohio DOT
- Letting
- 19 FEB 2026
- Pay items
- 72
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Black Horse Bridge Construction Inc | $1,626,062 | Low | -5.0% |
| 2 | Stanley Miller Construction Company | $1,904,614 | +17% | +11% |
| 3 | J & J Bridge Company Inc | $2,159,078 | +33% | +26% |
| 4 | Shelly & Sands Inc | $2,225,195 | +37% | +30% |
Engineer's estimate: $1,715,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Black Horse Bridge Construction Inc | 2. Stanley Miller Construction Company | 3. J & J Bridge Company Inc | 4. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $6,470.00 | $6,667.00 | $25,000 | $2,700.00 |
| 2 | Pavement removed (202E23000) | SY | 551 | $10.00 | $12.50 | $30.00 | $11.00 |
| 3 | Walk removed (202E30000) | SF | 1,356 | $3.00 | $15.57 | $1.00 | $2.00 |
| 4 | Curb removed (202E32000) | FT | 235 | $12.00 | $18.70 | $5.00 | $7.00 |
| 5 | Pipe removed, 24" and under (202E35100) | FT | 50 | $40.00 | $25.56 | $20.00 | $25.00 |
| 6 | Guardrail removed (202E38000) | FT | 63 | $4.00 | $10.00 | $2.00 | $4.00 |
| 7 | Catch basin removed (202E58100) | EACH | 3 | $700.00 | $450.00 | $300.00 | $425.00 |
| 8 | Excavation (203E10000) | CY | 186 | $35.00 | $90.00 | $75.00 | $50.00 |
| 9 | Embankment (203E20000) | CY | 17 | $20.00 | $100.00 | $75.00 | $100.00 |
| 10 | Subgrade compaction (204E10000) | SY | 358 | $5.00 | $1.50 | $5.00 | $6.00 |
| 11 | Proof rolling (204E45000) | HR | 1 | $225.00 | $85.00 | $300.00 | $270.00 |
| 12 | Guardrail, type MGS (606E15050) | FT | 25 | $34.00 | $32.30 | $34.00 | $37.00 |
| 13 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,380.00 | $2,167.00 | $1,380.00 | $1,500.00 |
| 14 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $3,250.00 | $2,973.00 | $3,250.00 | $3,500.00 |
| 15 | MGS bridge terminal assembly, type 2 (606E35102) | EACH | 1 | $745.00 | $834.00 | $745.00 | $800.00 |
| 16 | 4" concrete walk (608E10000) | SF | 1,411 | $15.00 | $15.00 | $10.00 | $9.00 |
| 17 | Curb, type 6 (609E26000) | FT | 264 | $42.00 | $46.50 | $50.00 | $80.00 |
| 18 | Water (616E10000) | MGAL | 1 | $1.00 | $1.00 | $10.00 | $230.00 |
| 19 | Topsoil (659E00300) | CY | 15 | $60.00 | $100.00 | $10.00 | $190.00 |
| 20 | Seeding and mulching (659E10000) | SY | 134 | $16.50 | $22.00 | $5.00 | $18.00 |
| 21 | Repair seeding and mulching (659E14000) | SY | 7 | $5.00 | $1.00 | $5.00 | $6.00 |
| 22 | Inter-seeding (659E15000) | SY | 7 | $0.10 | $1.00 | $5.00 | $1.00 |
| 23 | Commercial fertilizer (659E20000) | TON | 0.02 | $890.00 | $400.00 | $15,000 | $955.00 |
| 24 | Lime (659E31000) | ACRE | 0.03 | $150.00 | $10.00 | $10,000 | $161.00 |
| 25 | Water (659E35000) | MGAL | 1 | $1.00 | $1.00 | $10.00 | $2.00 |
| 26 | Erosion control (832E30000) | EACH | 6,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | 12" conduit, type B (611E04400) | FT | 39 | $105.00 | $80.00 | $150.00 | $200.00 |
| 28 | 12" conduit, type C (611E04600) | FT | 5 | $300.00 | $200.00 | $350.00 | $250.00 |
| 29 | Catch basin, no. 3 (611E98150) | EACH | 3 | $5,600.00 | $7,000.00 | $6,000.00 | $3,500.00 |
| 30 | Full depth pavement sawing (252E01500) | FT | 75 | $17.00 | $20.00 | $10.00 | $6.00 |
| 31 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 45 | $402.00 | $400.00 | $322.00 | $500.00 |
| 32 | Aggregate base (304E20000) | CY | 54 | $120.00 | $189.00 | $155.00 | $150.00 |
| 33 | Non-tracking tack coat (407E20000) | GAL | 18 | $4.00 | $8.00 | $4.00 | $3.30 |
| 34 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 11 | $558.00 | $992.00 | $844.00 | $750.00 |
| 35 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 16 | $556.00 | $730.00 | $621.00 | $600.00 |
| 36 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 34 | $300.00 | $230.00 | $150.00 | $180.00 |
| 37 | Valve box adjusted to grade (638E10800) | EACH | 1 | $1,000.00 | $750.00 | $500.00 | $850.00 |
| 38 | Service box adjusted to grade (638E10900) | EACH | 1 | $1,000.00 | $750.00 | $500.00 | $850.00 |
| 39 | Center line (644E00300) | MI | 0.05 | $25,000 | $27,780 | $25,000 | $58,400 |
| 40 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $153,000 | $119,889 | $250,000 | $160,000 |
| 41 | Approach slab removed (202E22900) | SY | 172 | $48.00 | $31.00 | $100.00 | $50.00 |
| 42 | Wearing course removed (202E23500) | SY | 298 | $10.00 | $12.00 | $10.00 | $16.00 |
| 43 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $100.00 | $1,000.00 | $100.00 | $5,000.00 |
| 44 | Unclassified excavation (503E21100) | CY | 30 | $300.00 | $534.00 | $200.00 | $85.00 |
| 45 | Epoxy coated steel reinforcement (509E10000) | LB | 25,832 | $1.75 | $2.90 | $2.50 | $1.53 |
| 46 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 212 | $24.00 | $15.00 | $50.00 | $30.00 |
| 47 | Class QC2 concrete, superstructure, as per plan (511E31611) | CY | 89 | $1,025.00 | $971.00 | $1,200.00 | $1,750.00 |
| 48 | Class QC1 concrete, abutment (511E45710) | CY | 48 | $700.00 | $921.00 | $1,400.00 | $1,500.00 |
| 49 | Class QC2 concrete, sidewalk (511E51510) | CY | 41 | $435.00 | $972.00 | $2,000.00 | $880.00 |
| 50 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 143 | $10.00 | $50.00 | $30.00 | $15.00 |
| 51 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 968 | $33.00 | $75.00 | $35.00 | $27.00 |
| 52 | Structural steel, misc.: temporary water line supp (513E95020) | LS | 1 | $80,000 | $45,000 | $75,000 | $90,000 |
| 53 | Structural steel, misc.:utility support (513E95030) | EACH | 12 | $385.00 | $120.00 | $500.00 | $1,500.00 |
| 54 | Prestressed concrete composite box beam bridge members, level 1, CB42-36, as per plan (515E12101) | EACH | 14 | $47,200 | $50,278 | $56,000 | $59,200 |
| 55 | 2" preformed expansion joint filler (516E13900) | SF | 57 | $14.00 | $10.00 | $7.00 | $15.00 |
| 56 | Semi-integral abutment expansion joint seal (516E14020) | FT | 88 | $35.00 | $50.00 | $45.00 | $45.00 |
| 57 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 28 | $160.00 | $84.50 | $100.00 | $90.00 |
| 58 | Elastomeric bearing with internal laminates only (neoprene), as per plan (516E43201) | EACH | 56 | $200.00 | $2,500.00 | $900.00 | $1,710.00 |
| 59 | Railing (concrete parapet with twin steel tube railing) (517E75120) | FT | 228 | $325.00 | $151.00 | $300.00 | $300.00 |
| 60 | Porous backfill with geotextile fabric (518E21200) | CY | 28 | $140.00 | $150.00 | $200.00 | $150.00 |
| 61 | Patching concrete structure, as per plan (519E11101) | SF | 54 | $240.00 | $95.00 | $190.00 | $284.00 |
| 62 | Reinforced concrete approach slabs (T=15"), as per plan (526E25001) | SY | 172 | $400.00 | $230.00 | $600.00 | $500.00 |
| 63 | Type A installation (526E90010) | FT | 68 | $190.00 | $210.00 | $300.00 | $400.00 |
| 64 | Structure grounding system (625E33000) | EACH | 2 | $12,000 | $25,000 | $10,000 | $17,120 |
| 65 | Special - special - misc.: work involving asbesto (690E98400) | LS | 1 | $5,500.00 | $1,500.00 | $300.00 | $3,750.00 |
| 66 | Polymer modified asphalt expansion joint system (846E00110) | CF | 29 | $600.00 | $386.00 | $600.00 | $805.00 |
| 67 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $13,750 | $30,000 | $80,000 | $25,000 |
| 68 | Maintaining traffic (614E11000) | LS | 1 | $6,000.00 | $15,000 | $4,250.00 | $25,000 |
| 69 | Field office, type B (619E16010) | MNTH | 6 | $1,000.00 | $1,500.00 | $2,000.00 | $5,500.00 |
| 70 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,000 | $35,000 | $3,000.00 | $25,000 |
| 71 | Mobilization (624E10000) | LS | 1 | $40,000 | $70,000 | $60,000 | $128,685 |
| 100 | Special - structures 6? X 1.5? continuous elastmer (530E01300) | FT | 88 | $70.00 | $125.00 | $50.00 | $57.49 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.