Black Horse Bridge Construction Inc: ODOT bid record
Black Horse Bridge Construction Inc submitted 71 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 13 AUG 2026, and was the low bidder on 24 of them (34%). When it was not low, its total sat a median +13% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $31,430,270
- Latest bid
- 13 AUG 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 14 | 4 | 29% |
| 2021 | 12 | 4 | 33% |
| 2022 | 13 | 5 | 38% |
| 2023 | 11 | 5 | 45% |
| 2024 | 3 | 2 | 67% |
| 2025 | 9 | 2 | 22% |
| 2026 | 9 | 2 | 22% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MED | 9 | 3 | 33% |
| NOB | 8 | 2 | 25% |
| ASD | 6 | 4 | 67% |
| MOE | 6 | 2 | 33% |
| STA | 6 | 1 | 17% |
| CUY | 6 | 4 | 67% |
| CAR | 3 | 0 | 0% |
| WAY | 3 | 2 | 67% |
| TUS | 3 | 2 | 67% |
| HOL | 3 | 0 | 0% |
| GUE | 2 | 1 | 50% |
| MRG | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 70 | 70 (100%) | $1.00 | $1.00 |
| Water | 659E35000 | MGAL | 68 | 58 (85%) | $1.00 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 66 | 30 (45%) | $767.50 | $850.00 |
| Seeding and mulching | 659E10000 | SY | 59 | 25 (42%) | $3.00 | $2.60 |
| Porous backfill with geotextile fabric | 518E21200 | CY | 58 | 22 (38%) | $122.00 | $125.00 |
| Lime | 659E31000 | ACRE | 65 | 21 (32%) | $160.00 | $150.00 |
| Guardrail, type MGS | 606E15050 | FT | 44 | 21 (48%) | $20.60 | $22.73 |
| Guardrail removed | 202E38000 | FT | 48 | 20 (42%) | $2.00 | $2.50 |
| Tack coat | 407E10000 | GAL | 37 | 19 (51%) | $3.30 | $3.25 |
| Anchor assembly, MGS type T | 606E26550 | EACH | 34 | 19 (56%) | $1,330.00 | $1,260.00 |
| Asphalt concrete base, PG64-22, (449) | 301E56000 | CY | 24 | 19 (79%) | $280.00 | $300.00 |
| Field office, type B | 619E16010 | MNTH | 35 | 18 (51%) | $1,000.00 | $2,000.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 35 | 17 of 35 |
| Complete General Construction Company | 21 | 5 of 21 |
| Eclipse Co LLC | 15 | 8 of 15 |
| Buds Inc | 13 | 10 of 13 |
| Stanley Miller Construction Company | 13 | 6 of 13 |
| J D Williamson Construction Co Inc | 13 | 4 of 13 |
| Ohio-West Virginia Excavating Co | 12 | 2 of 12 |
| Rietschlin Construction Inc | 10 | 1 of 10 |
| Ruhlin Company | 9 | 4 of 9 |
| BCC Ohio Inc | 9 | 6 of 9 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 13 AUG 2026 | 260371 | SUM | SUM-SR 21-01.07 (BRIDGE REPAIR) | 6 of 9 | $2,347,540 | +25% |
| 09 APR 2026 | 260183 | STA | STA-Sippo Valley Trail Bridge 8 (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 5 | $864,336 | +16% |
| 12 MAR 2026 | 260098 | SUM | SUM-SR 91-07.89 (BRIDGE REPAIR) | 1 of 3 | $2,188,488 | Low, 13% under the second |
| 19 FEB 2026 | 260099 | TUS | TUS-W. 3rd Street Bridge (BRIDGE REPAIR) | 1 of 4 | $1,626,062 | Low, 17% under the second |
| 19 FEB 2026 | 264006 | WAY | WAY-CULVERT FY2026 (CULVERT REPLACEMENT) | 2 of 3 | $1,114,791 | +27% |
| 29 JAN 2026 | 260060 | MOE | MOE-TR 2214-00.06 (BRIDGE REPLACEMENT (1 BRIDGE)) | 3 of 5 | $1,012,581 | +10% |
| 29 JAN 2026 | 260074 | HOL | HOL-SR 179-03.89 (BRIDGE REPAIR) | 2 of 5 | $1,360,160 | +26% |
| 15 JAN 2026 | 264001 | CUY | CUY-SR 82-00.93 (CULVERT REPLACEMENT) | 3 of 5 | $682,628 | +1.0% |
| 15 JAN 2026 | 264002 | HOL | HOL-SR 39-00.25 (CULVERT REPLACEMENT) | 6 of 7 | $542,540 | +52% |
| 18 DEC 2025 | 250593 | MOE | MOE-TR 1004-02.27 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 6 | $1,315,052 | +9.0% |
| 04 DEC 2025 | 250563 | MED | MED-US 42-09.45 (BRIDGE REPAIR) | 3 of 8 | $818,448 | +3.0% |
| 13 NOV 2025 | 250532 | NOB | NOB-SR 78-01.08 / NOB-SR 83-00.02 (BRIDGE REPAIR) | 5 of 7 | $1,911,546 | +15% |
| 23 OCT 2025 | 250503 | MRG | MRG-SR 555-23.05 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $1,381,825 | Low, 5.0% under the second |
| 25 SEP 2025 | 250441 | POR | POR-SR 305-02.43/02.58 (BRIDGE REPAIR) | 6 of 9 | $1,349,493 | +11% |
| 25 SEP 2025 | 254025 | NOB | NOB-SR 147-16.82 (CULVERT REPLACEMENT) | 3 of 4 | $612,365 | +7.0% |
| 24 APR 2025 | 250227 | STA | STA-Minerva Bridge (BIKEWAYS) | 1 of 3 | $738,873 | Low, 2.0% under the second |
| 10 APR 2025 | 250196 | NOB | NOB-Mill St.-00.07 (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 6 | $888,470 | +15% |
| 10 APR 2025 | 250200 | STA | STA-Sippo Valley Trail Bridge 11 (CULVERT REPLACEMENT) | 3 of 5 | $383,785 | +16% |
| 14 NOV 2024 | 240510 | CUY | CUY-SR 14-12.12E (PART 1 AND PART 2) (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 2 | $4,861,699 | Low, 9.0% under the second |
| 22 FEB 2024 | 240148 | NOB | NOB-SR 513-09.17 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $1,381,825 | Low, 5.0% under the second |
| 11 JAN 2024 | 244001 | CUY | CUY-US 422-09.59 Culvert (CULVERT REPLACEMENT) | 4 of 4 | $1,199,794 | +14% |
| 26 OCT 2023 | 230480 | WAY | WAY-US 250-17.27 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 2 | $1,678,081 | Low, 8.0% under the second |
| 26 OCT 2023 | 234024 | TRU | TRU-SR 5-11.95 Slide (SLIDE REPAIR) | 2 of 2 | $556,739 | +7.0% |
| 12 OCT 2023 | 230483 | ASD | ASD-US 42-12.46 (BRIDGE REPAIR) | 1 of 4 | $967,353 | Low, 2.0% under the second |
| 28 SEP 2023 | 230479 | RIC | RIC-SR 96-16.58 (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 8 | $2,354,986 | Low, 7.0% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.