ODOT contract 250441 bid tabulation
POR-SR 305-02.43/02.58 (BRIDGE REPAIR). Let by Ohio DOT on September 25, 2025, POR. 9 bids received; low bid $1,212,000 by A P O'Horo Company, -21% against the engineer's estimate of $1,535,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 100
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | A P O'Horo Company | $1,212,000 | Low | -21% |
| 2 | Marucci & Gaffney Excavating Co | $1,264,867 | +4.0% | -18% |
| 3 | Catts Construction Inc | $1,282,230 | +6.0% | -16% |
| 4 | Shelly & Sands Inc | $1,286,708 | +6.0% | -16% |
| 5 | Matt Winters Excavation LLC | $1,343,190 | +11% | -12% |
| 6 | Black Horse Bridge Construction Inc | $1,349,493 | +11% | -12% |
| 7 | Ohio Concrete Maintenance LLC | $1,395,655 | +15% | -9.0% |
| 8 | Stanley Miller Construction Company | $1,498,414 | +24% | -2.0% |
| 9 | J D Williamson Construction Co Inc | $1,500,251 | +24% | -2.0% |
Engineer's estimate: $1,535,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. A P O'Horo Company | 2. Marucci & Gaffney Excavating Co | 3. Catts Construction Inc | 4. Shelly & Sands Inc | 5. Matt Winters Excavation LLC | 6. Black Horse Bridge Construction Inc |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,000.00 | $50,000 | $8,405.00 | $5,500.00 | $10,000 | $9,800.00 |
| 2 | Pavement removed (202E23000) | SY | 792 | $12.00 | $13.33 | $9.00 | $13.00 | $15.00 | $15.00 |
| 3 | Pipe removed, over 24" diameter (202E35200) | FT | 48 | $75.00 | $70.00 | $195.00 | $62.00 | $120.00 | $260.00 |
| 4 | Guardrail removed (202E38000) | FT | 1,110 | $2.00 | $2.50 | $2.00 | $2.00 | $6.00 | $4.00 |
| 5 | Removal misc.: inspection well (202E98100) | EACH | 1 | $300.00 | $10.00 | $56.00 | $280.00 | $250.00 | $300.00 |
| 6 | Removal misc.: conduit (202E98200) | FT | 10 | $30.00 | $5.00 | $16.00 | $28.00 | $25.00 | $32.00 |
| 7 | Excavation (203E10000) | CY | 343 | $25.00 | $20.00 | $39.00 | $20.00 | $38.00 | $23.00 |
| 8 | Embankment (203E20000) | CY | 378 | $15.00 | $25.00 | $36.00 | $19.00 | $60.00 | $25.00 |
| 9 | Embankment, as per plan (203E20001) | CY | 50 | $30.00 | $10.00 | $50.00 | $18.00 | $150.00 | $20.00 |
| 10 | Subgrade compaction (204E10000) | SY | 1,156 | $3.00 | $3.00 | $1.00 | $8.00 | $5.00 | $3.00 |
| 11 | Excavation of subgrade (204E13000) | CY | 17 | $25.00 | $75.00 | $50.00 | $35.00 | $125.00 | $40.00 |
| 12 | Granular material, type B (204E30010) | CY | 17 | $75.00 | $75.00 | $80.00 | $120.00 | $130.00 | $90.00 |
| 13 | Proof rolling (204E45000) | HR | 1 | $125.00 | $125.00 | $750.00 | $250.00 | $340.00 | $300.00 |
| 14 | Geotextile fabric (204E50000) | SY | 49 | $1.50 | $5.00 | $10.00 | $8.00 | $11.00 | $14.00 |
| 15 | Guardrail, type MGS (606E15050) | FT | 25 | $19.60 | $21.00 | $24.00 | $20.00 | $20.00 | $19.60 |
| 16 | Guardrail, type MGS with long posts (606E15100) | FT | 1,237.50 | $20.80 | $22.00 | $25.00 | $22.00 | $21.00 | $20.80 |
| 17 | MGS guardrail, type 8 (606E15400) | FT | 225 | $31.20 | $33.00 | $25.00 | $33.00 | $32.00 | $31.20 |
| 18 | Post end anchor (or concrete block end anchor) (606E17500) | EACH | 1 | $1,220.00 | $1,300.00 | $1,458.00 | $1,300.00 | $1,225.00 | $1,220.00 |
| 19 | Rounded end section (606E20050) | EACH | 5 | $75.00 | $80.00 | $37.00 | $80.00 | $80.00 | $75.00 |
| 20 | Anchor assembly, MGS type E, MASH 2016 (606E26150) | EACH | 4 | $2,420.00 | $2,550.00 | $2,892.00 | $2,500.00 | $2,500.00 | $2,420.00 |
| 21 | Anchor assembly, MGS type T (606E26550) | EACH | 5 | $1,350.00 | $1,425.00 | $1,614.00 | $1,400.00 | $1,400.00 | $1,350.00 |
| 22 | MGS bridge terminal assembly, type TST-2 (606E34600) | EACH | 4 | $2,525.00 | $2,675.00 | $3,019.00 | $2,700.00 | $2,600.00 | $2,525.00 |
| 23 | Special - mailbox support system, single (690E50100) | EACH | 1 | $175.00 | $185.00 | $180.00 | $185.00 | $180.00 | $175.00 |
| 24 | Special - as-built construction plans (690E91000) | LS | 1 | $100.00 | $2,700.00 | $100.00 | $2,000.00 | $5,000.00 | $3,600.00 |
| 25 | Special - survey control verification (690E98400) | LS | 1 | $3,000.00 | $3,000.00 | $8,965.00 | $2,300.00 | $3,200.00 | $5,000.00 |
| 26 | Riprap, type D (601E11000) | SY | 7 | $325.00 | $175.00 | $368.00 | $560.00 | $440.00 | $250.00 |
| 27 | Rock channel protection, type B with filter (601E32100) | CY | 12 | $200.00 | $125.00 | $385.00 | $255.00 | $230.00 | $210.00 |
| 28 | Rock channel protection, type C with filter (601E32200) | CY | 1 | $300.00 | $250.00 | $1,829.00 | $250.00 | $440.00 | $625.00 |
| 29 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 2 | $300.00 | $750.00 | $948.00 | $720.00 | $315.00 | $475.00 |
| 30 | Seeding and mulching (659E10000) | SY | 1,370 | $3.44 | $3.00 | $2.50 | $3.50 | $3.00 | $3.75 |
| 31 | Commercial fertilizer (659E20000) | TON | 0.19 | $862.00 | $500.00 | $1.00 | $900.00 | $710.00 | $863.16 |
| 32 | Lime (659E31000) | ACRE | 0.29 | $156.00 | $40.00 | $1.00 | $160.00 | $55.00 | $158.62 |
| 33 | Water (659E35000) | MGAL | 8 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 34 | Slope erosion protection mat, type E (670E00550) | SY | 1,370 | $1.45 | $4.00 | $9.00 | $1.50 | $2.50 | $1.45 |
| 35 | Erosion control (832E30000) | EACH | 15,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 36 | Concrete masonry (602E20000) | CY | 13 | $1,200.00 | $1,750.00 | $2,482.00 | $2,000.00 | $1,500.00 | $2,000.00 |
| 37 | Concrete masonry, as per plan (602E20001) | CY | 16 | $1,100.00 | $1,400.00 | $1,373.00 | $1,600.00 | $1,330.00 | $1,400.00 |
| 38 | Aggregate drains (605E31100) | FT | 95 | $18.00 | $21.00 | $12.00 | $35.00 | $45.00 | $24.00 |
| 39 | 4" conduit, type E (611E00400) | FT | 30 | $15.00 | $4.00 | $20.00 | $25.00 | $7.00 | $30.00 |
| 40 | 4" conduit, type F (611E00406) | FT | 20 | $15.00 | $4.00 | $20.00 | $25.00 | $8.00 | $37.00 |
| 41 | 12" conduit, type B (611E04400) | FT | 20 | $25.00 | $100.00 | $88.00 | $50.00 | $130.00 | $50.00 |
| 42 | 12" conduit, type C (611E04600) | FT | 5 | $260.00 | $150.00 | $146.00 | $330.00 | $230.00 | $280.00 |
| 43 | 15" conduit, type C (611E06100) | FT | 147 | $70.00 | $75.00 | $75.00 | $115.00 | $110.00 | $55.00 |
| 44 | 15" conduit, type D (611E06400) | FT | 28 | $90.00 | $125.00 | $63.00 | $102.00 | $160.00 | $55.00 |
| 45 | 60" conduit, type A, 706.02, or (707.01 or 707.02) (611E23600) | FT | 47 | $200.00 | $350.00 | $623.00 | $410.00 | $350.00 | $685.00 |
| 46 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 10 | $30.00 | $5.00 | $20.00 | $50.00 | $155.00 | $150.00 |
| 47 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 10 | $30.00 | $5.00 | $20.00 | $15.00 | $155.00 | $150.00 |
| 48 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 10 | $30.00 | $5.00 | $20.00 | $25.00 | $155.00 | $150.00 |
| 49 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $2,000.00 | $3,600.00 | $2,500.00 | $3,500.00 | $4,500.00 | $3,900.00 |
| 50 | Inspection well (611E99720) | EACH | 2 | $500.00 | $100.00 | $1,150.00 | $750.00 | $1,300.00 | $2,600.00 |
| 51 | Pavement planing, asphalt concrete, (T=3") (254E01000) | SY | 872 | $10.00 | $10.50 | $13.00 | $10.00 | $13.00 | $10.00 |
| 52 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 179 | $260.00 | $275.00 | $275.00 | $260.00 | $255.00 | $260.00 |
| 53 | Aggregate base (304E20000) | CY | 200 | $90.00 | $75.00 | $90.00 | $110.00 | $115.00 | $113.00 |
| 54 | Tack coat, 702.13 (407E13900) | GAL | 13 | $30.00 | $32.00 | $5.00 | $30.00 | $6.00 | $30.00 |
| 55 | Non-tracking tack coat (407E20000) | GAL | 304 | $4.00 | $4.20 | $5.00 | $4.00 | $5.00 | $4.00 |
| 56 | Asphalt concrete surface course, type 1, (449), PG70-22M (441E70100) | CY | 163 | $335.00 | $352.00 | $375.00 | $335.00 | $320.00 | $335.00 |
| 57 | RPM (621E00100) | EACH | 12 | $299.60 | $240.00 | $358.00 | $300.00 | $340.00 | $225.00 |
| 58 | Barrier reflector, type 3, bidirectional (626E00112) | EACH | 31 | $13.00 | $14.00 | $15.00 | $14.00 | $15.00 | $13.00 |
| 59 | Ground mounted support, no. 2 post (630E02100) | FT | 44 | $21.15 | $10.50 | $11.00 | $22.00 | $21.00 | $10.00 |
| 60 | Ground mounted support, no. 3 post (630E03100) | FT | 24 | $23.79 | $12.00 | $12.00 | $25.00 | $23.00 | $11.00 |
| 61 | Sign, flat sheet (630E80100) | SF | 13.50 | $27.75 | $27.00 | $30.00 | $29.00 | $25.00 | $26.00 |
| 62 | Sign, flat sheet (630E80100) | SF | 4 | $27.75 | $41.00 | $46.00 | $29.00 | $26.00 | $39.00 |
| 63 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $16.68 | $63.00 | $71.00 | $18.00 | $11.00 | $59.50 |
| 64 | Removal of ground mounted sign and reerection (630E85100) | EACH | 5 | $85.09 | $111.00 | $125.00 | $91.00 | $70.00 | $105.00 |
| 65 | Removal of ground mounted post support and disposal (630E86002) | EACH | 4 | $22.24 | $37.00 | $41.00 | $24.00 | $16.00 | $35.00 |
| 66 | Removal of ground mounted post support and reerection (630E86010) | EACH | 3 | $94.86 | $160.00 | $179.00 | $100.00 | $115.00 | $150.00 |
| 67 | Edge line, 6", type 1 (642E00104) | MI | 0.21 | $5,290.00 | $12,500 | $9,635.00 | $5,600.00 | $8,500.00 | $12,000 |
| 68 | Center line, type 1 (642E00300) | MI | 0.11 | $6,250.00 | $12,500 | $17,710 | $6,600.00 | $15,000 | $12,000 |
| 69 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 32 | $50.00 | $60.00 | $71.00 | $100.00 | $90.00 | $90.00 |
| 70 | Detour signing (614E12420) | LS | 1 | $15,000 | $12,000 | $11,500 | $10,000 | $10,000 | $9,650.00 |
| 71 | Portable changeable message sign, as per plan (614E18601) | SNMT | 4 | $800.00 | $850.00 | $926.00 | $1,200.00 | $1,200.00 | $775.00 |
| 72 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $12,000 | $20,000 | $7,705.00 | $8,000.00 | $16,000 | $48,550 |
| 73 | Unclassified excavation (503E21300) | LS | 1 | $12,000 | $10,000 | $8,930.00 | $12,000 | $15,000 | $24,600 |
| 74 | Portions of structure removed, over 20 foot span, as per plan (202E11203) | LS | 1 | $175,000 | $80,000 | $63,250 | $70,000 | $31,823 | $86,000 |
| 75 | Approach slab removed (202E22900) | SY | 160 | $35.00 | $25.00 | $77.00 | $24.00 | $50.00 | $55.00 |
| 76 | Wearing course removed (202E23500) | SY | 505 | $8.00 | $18.00 | $7.00 | $10.00 | $15.00 | $10.00 |
| 77 | Unclassified excavation, as per plan (503E21301) | LS | 1 | $5,000.00 | $5,000.00 | $3,035.00 | $7,500.00 | $5,700.00 | $9,000.00 |
| 78 | Epoxy coated steel reinforcement (509E10000) | LB | 13,804 | $1.30 | $1.45 | $2.00 | $1.60 | $2.00 | $2.00 |
| 79 | Class QC2 concrete, superstructure (511E31610) | CY | 87 | $950.00 | $1,050.00 | $1,052.00 | $1,300.00 | $900.00 | $750.00 |
| 80 | Class QC1 concrete, abutment not including footing (511E44110) | CY | 5 | $800.00 | $2,350.00 | $2,092.00 | $3,900.00 | $2,200.00 | $1,350.00 |
| 81 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 166 | $50.00 | $32.00 | $36.00 | $40.00 | $75.00 | $36.00 |
| 82 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 118 | $30.00 | $42.00 | $36.00 | $50.00 | $30.00 | $48.00 |
| 83 | Prestressed concrete composite box beam bridge members, level 1, CB17-48 (515E12030) | EACH | 9 | $9,000.00 | $10,000 | $10,362 | $11,000 | $15,000 | $12,000 |
| 84 | Prestressed concrete composite box beam bridge members, level 1, CB17-48 (515E12030) | EACH | 9 | $9,000.00 | $10,000 | $10,801 | $9,500.00 | $14,900 | $12,000 |
| 85 | Prestressed concrete composite box beam bridge members, level 1, CB17-48 (515E12030) | EACH | 9 | $9,000.00 | $10,000 | $10,722 | $9,500.00 | $15,000 | $12,000 |
| 86 | High early strength keyway grout (515E30000) | FT | 665 | $20.00 | $20.00 | $23.00 | $28.00 | $18.00 | $20.00 |
| 87 | 2" preformed expansion joint filler (516E13900) | SF | 13 | $10.00 | $45.00 | $4.75 | $13.00 | $16.00 | $19.00 |
| 88 | Integral abutment expansion joint seal (516E14014) | FT | 85 | $25.00 | $42.00 | $42.00 | $50.00 | $40.00 | $36.00 |
| 89 | 1/8" preformed bearing pad, type CDP (516E41100) | EACH | 54 | $85.00 | $50.00 | $14.00 | $38.00 | $30.00 | $75.00 |
| 90 | Elastomeric bearing with internal laminates only (neoprene) (516E43100) | EACH | 108 | $90.00 | $115.00 | $119.00 | $86.00 | $110.00 | $80.00 |
| 91 | Railing (three steel tube bridge railing) (517E70100) | FT | 183 | $450.00 | $470.00 | $530.00 | $475.00 | $450.00 | $500.00 |
| 92 | Porous backfill with geotextile fabric (518E21200) | CY | 13 | $100.00 | $95.00 | $210.00 | $210.00 | $240.00 | $150.00 |
| 93 | Special - steel drip strip (518E22300) | FT | 221 | $16.00 | $21.00 | $44.00 | $17.00 | $17.00 | $25.00 |
| 94 | Reinforced concrete approach slabs (T=13") (526E15000) | SY | 160 | $325.00 | $315.00 | $357.00 | $380.00 | $450.00 | $400.00 |
| 95 | Type B installation (526E90020) | SY | 43 | $70.00 | $100.00 | $88.00 | $80.00 | $80.00 | $60.00 |
| 96 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $24,896 | $15,000 | $13,166 | $10,000 | $20,000 | $11,385 |
| 97 | Maintaining traffic (614E11000) | LS | 1 | $5,000.00 | $20,000 | $8,007.00 | $10,000 | $6,000.00 | $9,700.00 |
| 98 | Field office, type B (619E16010) | MNTH | 6 | $1,800.00 | $900.00 | $3,000.00 | $5,000.00 | $250.00 | $1,000.00 |
| 99 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,000.00 | $15,000 | $8,965.00 | $20,000 | $6,000.00 | $14,000 |
| 100 | Mobilization (624E10000) | LS | 1 | $60,000 | $60,000 | $43,000 | $64,000 | $40,000 | $60,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.