Ohio Concrete Maintenance LLC: ODOT bid record
Ohio Concrete Maintenance LLC submitted 35 bids on Ohio DOT contracts in the data, from 27 JUN 2024 to 12 NOV 2026, and was the low bidder on 10 of them (29%). When it was not low, its total sat a median +14% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $12,544,728
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2024 | 9 | 4 | 44% |
| 2025 | 14 | 3 | 21% |
| 2026 | 12 | 3 | 25% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 1 | 4 | 2 | 50% |
| District 4 | 3 | 1 | 33% |
| CUY | 3 | 1 | 33% |
| WAY | 2 | 1 | 50% |
| HOL | 2 | 1 | 50% |
| LOR | 2 | 1 | 50% |
| MED | 2 | 0 | 0% |
| District 3 | 2 | 0 | 0% |
| GUE | 1 | 0 | 0% |
| TUS | 1 | 0 | 0% |
| District 7 | 1 | 0 | 0% |
| ALL | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Treating concrete bridge decks with gravity fed resin | 512E73500 | SY | 75 | 37 (49%) | $10.00 | $11.00 |
| Erosion control | 832E30000 | EACH | 33 | 33 (100%) | $1.00 | $1.00 |
| Patching concrete structure, as per plan | 519E11101 | SF | 39 | 17 (44%) | $150.00 | $150.00 |
| Full-depth repair | 848E50200 | CY | 18 | 10 (56%) | $1,000.00 | $1,200.00 |
| Special - structures: cleaning of bridge seat | 530E00400 | EACH | 9 | 9 (100%) | $1,500.00 | $1,750.00 |
| Patching concrete structure | 519E11100 | SF | 15 | 8 (53%) | $175.00 | $145.00 |
| Surface preparation using hydrodemolition | 848E20000 | SY | 9 | 8 (89%) | $58.00 | $94.25 |
| Patching concrete structures with trowelable mortar | 843E50000 | SF | 15 | 7 (47%) | $140.00 | $151.04 |
| Hand chipping | 848E50000 | SY | 35 | 6 (17%) | $140.00 | $105.00 |
| Epoxy coated reinforcing steel, as per plan | 509E10001 | LB | 13 | 6 (46%) | $2.50 | $2.50 |
| Surface preparation using hydrodemolition, as per plan | 848E20001 | SY | 12 | 6 (50%) | $62.50 | $93.00 |
| Galvanic anode protection, as per plan | 844E20001 | EACH | 10 | 6 (60%) | $30.00 | $53.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| BCC Ohio Inc | 16 | 11 of 16 |
| Catts Construction Inc | 12 | 4 of 12 |
| Complete General Construction Company | 10 | 2 of 10 |
| Perk Company Inc | 8 | 0 of 8 |
| Great Lakes Construction Co | 6 | 1 of 6 |
| Eagle Bridge Co | 6 | 0 of 6 |
| J D Williamson Construction Co Inc | 5 | 2 of 5 |
| Stanley Miller Construction Company | 4 | 0 of 4 |
| Ruhlin Company | 4 | 1 of 4 |
| Double Z Construction Company | 4 | 1 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260497 | District 1 | D01-OL FY27 (BRIDGE REPAIR) | 2 of 4 | $1,353,009 | +9.0% |
| 01 OCT 2026 | 260422 | District 3 | D03-BH FY2027 (A) (BRIDGE REPAIR) | 2 of 5 | $758,972 | +6.0% |
| 27 AUG 2026 | 260391 | CUY | CUY-IR 480-11.64 BH (BRIDGE REPAIR) | 1 of 6 | $435,132 | Low, 29% under the second |
| 30 JUL 2026 | 260346 | District 2 | D02-Bridge Maintenance FY2027 (BRIDGE REPAIR) | 3 of 6 | $1,119,981 | +11% |
| 30 JUL 2026 | 268016 | District 4 | D04-BH FY2027 (West) (BRIDGE REPAIR) | 2 of 2 | $2,018,822 | +14% |
| 16 JUL 2026 | 260328 | CUY | CUY-/GEA BH FY2027 Misc (PART 1 AND PART 2) (BRIDGE REPAIR) | 2 of 4 | $9,452,324 | +7.0% |
| 19 FEB 2026 | 260011 | CUY | CUY-IR 480-18.42 Deck Sealing (BRIDGE REPAIR) | 6 of 6 | $2,588,875 | +86% |
| 19 FEB 2026 | 260084 | District 12 | D12-BH FY2026 Overlay (BRIDGE REPAIR) | 1 of 4 | $1,842,325 | Low, 28% under the second |
| 19 FEB 2026 | 260103 | District 1 | D01-BM FY26 (BRIDGE REPAIR) | 3 of 4 | $873,898 | +7.0% |
| 29 JAN 2026 | 260069 | ASD | ASD-Mohican State Park FY2026 (BRIDGE REPAIR) | 1 of 3 | $246,052 | Low, 1.0% under the second |
| 29 JAN 2026 | 260074 | HOL | HOL-SR 179-03.89 (BRIDGE REPAIR) | 4 of 5 | $1,469,896 | +36% |
| 15 JAN 2026 | 260029 | WOO | WOO-SR 795-01.76 Resurf & Overlay (BRIDGE REPAIR) | 2 of 2 | $3,433,270 | +9.0% |
| 18 DEC 2025 | 250583 | District 1 | D01-OL FY26 (BRIDGE REPAIR) | 1 of 5 | $2,929,630 | Low, 4.0% under the second |
| 04 DEC 2025 | 250563 | MED | MED-US 42-09.45 (BRIDGE REPAIR) | 6 of 8 | $914,826 | +15% |
| 13 NOV 2025 | 250542 | District 11 | D11-DS-FY2026 (BRIDGE REPAIR) | 2 of 3 | $245,347 | +19% |
| 13 NOV 2025 | 250545 | LOG | LOG-US 33-17.82 (BRIDGE REPAIR) | 2 of 7 | $553,241 | +12% |
| 23 OCT 2025 | 250492 | District 3 | D03-BH FY2026(A) (BRIDGE REPAIR) | 2 of 4 | $399,408 | +13% |
| 25 SEP 2025 | 250441 | POR | POR-SR 305-02.43/02.58 (BRIDGE REPAIR) | 7 of 9 | $1,395,655 | +15% |
| 11 SEP 2025 | 258021 | MAR | MAR-SR 231-03.42 (BRIDGE REPAIR) | 4 of 4 | $602,434 | +25% |
| 14 AUG 2025 | 250380 | LAK | LAK-SR 283-14.34 Deck (BRIDGE REPAIR) | 3 of 5 | $5,369,274 | +14% |
| 14 AUG 2025 | 250384 | WAY | WAY-BH FY2026 (CULVERT REPLACEMENT) | 1 of 3 | $456,525 | Low, 64% under the second |
| 31 JUL 2025 | 250363 | PAU | PAU-US 127-10.23 (BRIDGE REPAIR) | 3 of 6 | $372,523 | +13% |
| 31 JUL 2025 | 250370 | District 6 | D06-Bridge Pier Encasements (BRIDGE REPAIR) | 1 of 6 | $1,599,921 | Low, 11% under the second |
| 17 JUL 2025 | 250344 | District 4 | D04-BH FY2026 (BRIDGE REPAIR) | 2 of 4 | $1,480,806 | +26% |
| 12 JUN 2025 | 250317 | MED | MED-US 42-03.10 L Reconstr. (BRIDGE REPAIR) | 2 of 4 | $1,003,987 | +15% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.