ODOT contract 260346 bid tabulation
D02-Bridge Maintenance FY2027 (BRIDGE REPAIR). Let by Ohio DOT on July 30, 2026, District 2. 6 bids received; low bid $1,009,658 by BCC Ohio Inc, -7.5% against the engineer's estimate of $1,092,000.
- Owner
- Ohio DOT
- Letting
- 30 JUL 2026
- Pay items
- 13
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BCC Ohio Inc | $1,009,658 | Low | -8.0% |
| 2 | Ram Construction Services of Michigan, Inc | $1,047,020 | +4.0% | -4.0% |
| 3 | Ohio Concrete Maintenance LLC | $1,119,981 | +11% | +3.0% |
| 4 | Catts Construction Inc | $1,146,172 | +14% | +5.0% |
| 5 | Aad Contracting Inc | $1,149,559 | +14% | +5.0% |
| 6 | American Roadway Logistics | $1,183,441 | +17% | +8.0% |
Engineer's estimate: $1,092,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. BCC Ohio Inc | 2. Ram Construction Services of Michigan, Inc | 3. Ohio Concrete Maintenance LLC | 4. Catts Construction Inc | 5. Aad Contracting Inc | 6. American Roadway Logistics |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Edge line, 6", type 1 (642E00104) | MI | 6.33 | $9,833.18 | $9,365.00 | $10,500 | $11,500 | $500.00 | $2,500.00 |
| 2 | Lane line, 6", type 1 (642E00204) | MI | 2.19 | $6,520.50 | $6,210.00 | $7,000.00 | $7,600.00 | $500.00 | $3,200.00 |
| 3 | Center line, type 1 (642E00300) | MI | 1.49 | $10,647 | $10,140 | $11,500 | $12,500 | $500.00 | $4,000.00 |
| 4 | Channelizing line, 12", type 1 (642E00404) | FT | 906 | $3.15 | $3.00 | $4.00 | $3.75 | $5.00 | $1.00 |
| 5 | Transverse/diagonal line, type 1 (642E00700) | FT | 784 | $9.45 | $9.00 | $10.00 | $11.00 | $5.00 | $4.00 |
| 6 | Lane arrow, type 1 (642E01300) | EACH | 10 | $262.50 | $250.00 | $300.00 | $309.00 | $300.00 | $75.00 |
| 7 | Portable changeable message sign, as per plan (614E18601) | SNMT | 6 | $1,180.50 | $1,350.00 | $1,350.00 | $800.00 | $300.00 | $1,000.00 |
| 8 | Railroad flagging services (900E00100) | EACH | 17,400 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 9 | Treating concrete bridge decks with gravity fed resin, as per plan (512E73501) | SY | 74,913 | $8.46 | $9.11 | $10.50 | $10.49 | $12.60 | $12.00 |
| 10 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $5,000.00 | $10,000 | $10,000 | $5,000.00 | $5,000.00 | $25,000 |
| 11 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $12,190 | $12,800 | $19,500 | $11,959 | $5,000.00 | $12,500 |
| 12 | Maintaining traffic (614E11000) | LS | 1 | $184,451 | $143,000 | $110,000 | $99,000 | $140,000 | $150,000 |
| 13 | Mobilization (624E10000) | LS | 1 | $44,494 | $73,000 | $55,000 | $99,000 | $20,000 | $40,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.