Catts Construction Inc: ODOT bid record
Catts Construction Inc submitted 71 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 01 OCT 2026, and was the low bidder on 18 of them (25%). When it was not low, its total sat a median +17% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $30,821,652
- Latest bid
- 01 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 3 | 50% |
| 2021 | 20 | 3 | 15% |
| 2022 | 8 | 1 | 13% |
| 2023 | 6 | 1 | 17% |
| 2024 | 9 | 4 | 44% |
| 2025 | 8 | 4 | 50% |
| 2026 | 14 | 2 | 14% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 19 | 9 | 47% |
| ATB | 5 | 1 | 20% |
| District 12 | 5 | 2 | 40% |
| District 3 | 5 | 1 | 20% |
| GEA | 4 | 1 | 25% |
| POR | 4 | 0 | 0% |
| MED | 3 | 1 | 33% |
| MEG | 3 | 0 | 0% |
| District 11 | 2 | 1 | 50% |
| CLA | 2 | 0 | 0% |
| HUR | 1 | 0 | 0% |
| ROS | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 59 | 59 (100%) | $1.00 | $1.00 |
| Subgrade compaction | 204E10000 | SY | 39 | 26 (67%) | $1.00 | $3.00 |
| Full-depth repair | 848E50200 | CY | 28 | 17 (61%) | $775.00 | $1,200.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 49 | 16 (33%) | $79.00 | $80.00 |
| Water | 659E35000 | MGAL | 37 | 15 (41%) | $1.65 | $1.00 |
| Treating concrete bridge decks with gravity fed resin | 512E73500 | SY | 46 | 13 (28%) | $10.00 | $11.00 |
| Sealing concrete bridge decks with HMWM resin, as per plan | 512E10301 | SY | 13 | 13 (100%) | $13.55 | $16.50 |
| Soil analysis test | 659E00100 | EACH | 23 | 12 (52%) | $60.00 | $115.50 |
| Repair seeding and mulching | 659E14000 | SY | 25 | 11 (44%) | $1.00 | $1.25 |
| Asphalt concrete for maintaining traffic | 614E13000 | CY | 21 | 11 (52%) | $100.00 | $250.00 |
| Excavation | 203E10000 | CY | 38 | 10 (26%) | $33.00 | $27.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 33 | 9 (27%) | $39.00 | $34.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Perk Company Inc | 23 | 7 of 23 |
| Shelly & Sands Inc | 18 | 8 of 18 |
| BCC Ohio Inc | 17 | 11 of 17 |
| Karvo Companies Inc | 16 | 8 of 16 |
| Eclipse Co LLC | 13 | 6 of 13 |
| Tri-Mor Corp | 12 | 2 of 12 |
| Complete General Construction Company | 12 | 8 of 12 |
| Ohio Concrete Maintenance LLC | 12 | 8 of 12 |
| Great Lakes Construction Co | 11 | 4 of 11 |
| Marucci & Gaffney Excavating Co | 10 | 4 of 10 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | 260422 | District 3 | D03-BH FY2027 (A) (BRIDGE REPAIR) | 3 of 5 | $935,076 | +31% |
| 17 SEP 2026 | 260402 | CUY | CUY-Cle Downtown Connector Trl 1 (BIKEWAYS) | 1 of 5 | $1,330,135 | Low, 11% under the second |
| 27 AUG 2026 | 260391 | CUY | CUY-IR 480-11.64 BH (BRIDGE REPAIR) | 2 of 6 | $562,249 | +29% |
| 30 JUL 2026 | 260346 | District 2 | D02-Bridge Maintenance FY2027 (BRIDGE REPAIR) | 4 of 6 | $1,146,172 | +14% |
| 25 JUN 2026 | 268013 | RIC | RIC-SR 546-04.98 (BRIDGE REPAIR) | 2 of 2 | $214,760 | +4.0% |
| 11 JUN 2026 | 260282 | ATB | ATB-/TRU-SR 7/VAR-18.62/VAR (PART 1, 2, 3) (BRIDGE REPAIR) | 3 of 4 | $4,301,974 | +13% |
| 11 JUN 2026 | 260294 | District 5 | D05-FY2027 Bridge Rehab East (BRIDGE REPAIR) | 4 of 5 | $982,749 | +19% |
| 07 MAY 2026 | 260232 | CUY | CUY-Memorial Bridges Loop Trail (BIKEWAYS) | 3 of 3 | $2,492,851 | +30% |
| 07 MAY 2026 | 260233 | CUY | CUY-Old Detroit Rd Bridge Rehab (MISCELLANEOUS) | 1 of 3 | $947,053 | Low, 1.0% under the second |
| 19 FEB 2026 | 260011 | CUY | CUY-IR 480-18.42 Deck Sealing (BRIDGE REPAIR) | 3 of 6 | $1,935,556 | +39% |
| 19 FEB 2026 | 260084 | District 12 | D12-BH FY2026 Overlay (BRIDGE REPAIR) | 3 of 4 | $2,392,996 | +30% |
| 29 JAN 2026 | 260069 | ASD | ASD-Mohican State Park FY2026 (BRIDGE REPAIR) | 2 of 3 | $249,331 | +1.0% |
| 15 JAN 2026 | 260010 | CUY | CUY-IR 480-13.04 Ramps (MINOR RECONSTRUCTION) | 3 of 9 | $2,044,895 | +9.0% |
| 15 JAN 2026 | 260031 | CUY | CUY-SR 176-10.65 (MISCELLANEOUS) | 2 of 2 | $3,292,365 | +11% |
| 04 DEC 2025 | 250563 | MED | MED-US 42-09.45 (BRIDGE REPAIR) | 5 of 8 | $886,683 | +11% |
| 23 OCT 2025 | 250492 | District 3 | D03-BH FY2026(A) (BRIDGE REPAIR) | 3 of 4 | $449,442 | +27% |
| 25 SEP 2025 | 250441 | POR | POR-SR 305-02.43/02.58 (BRIDGE REPAIR) | 3 of 9 | $1,282,230 | +6.0% |
| 11 SEP 2025 | 250421 | CUY | CUY-US 6-14.56 Tower B (BRIDGE REPAIR) | 1 of 5 | $1,108,670 | Low, 20% under the second |
| 14 AUG 2025 | 250377 | CUY | CUY-SRTS FY2023 Warrensville Hts (SPOT SAFETY) | 1 of 6 | $625,585 | Low, 7.0% under the second |
| 14 AUG 2025 | 250380 | LAK | LAK-SR 283-14.34 Deck (BRIDGE REPAIR) | 5 of 5 | $6,140,052 | +30% |
| 31 JUL 2025 | 250363 | PAU | PAU-US 127-10.23 (BRIDGE REPAIR) | 1 of 6 | $328,707 | Low, 1.0% under the second |
| 24 APR 2025 | 250210 | ATB | ATB-SR 7-31.10 (MINOR RECONSTRUCTION) | 1 of 1 | $2,803,417 | Low |
| 19 DEC 2024 | 240519 | District 1 | D01-OL FY25 (BRIDGE REPAIR) | 5 of 5 | $2,710,675 | +30% |
| 31 OCT 2024 | 240487 | CRA | CRA-US 30-00.00 (FOUR LANE RESURFACING) | 4 of 4 | $3,620,327 | +35% |
| 31 OCT 2024 | 240505 | SUM | SUM-IR 76-12.03 (SPOT PATCHING / PAVEMENT REPAIR) | 2 of 3 | $3,884,872 | +12% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.