ODOT contract 260233 bid tabulation
CUY-Old Detroit Rd Bridge Rehab (MISCELLANEOUS). Let by Ohio DOT on May 7, 2026, CUY. 3 bids received; low bid $947,053 by Catts Construction Inc, -27% against the engineer's estimate of $1,301,000.
- Owner
- Ohio DOT
- Letting
- 07 MAY 2026
- Pay items
- 94
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Catts Construction Inc | $947,053 | Low | -27% |
| 2 | Great Lakes Construction Co | $958,463 | +1.0% | -26% |
| 3 | Madex Construction Co | $1,334,482 | +41% | +3.0% |
Engineer's estimate: $1,301,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Catts Construction Inc | 2. Great Lakes Construction Co | 3. Madex Construction Co |
|---|---|---|---|---|---|---|
| 1 | Pavement removed (202E23000) | SY | 855 | $12.00 | $16.00 | $22.64 |
| 2 | Walk removed (202E30000) | SF | 344 | $2.00 | $5.50 | $5.89 |
| 3 | Curb removed (202E32000) | FT | 359 | $4.00 | $6.75 | $9.57 |
| 4 | Fence removed (202E75000) | FT | 168 | $6.00 | $4.50 | $11.58 |
| 5 | Removal misc.:inspection well (202E98100) | EACH | 2 | $450.00 | $700.00 | $1,736.84 |
| 6 | Removal misc.:conduit (202E98200) | FT | 100 | $51.00 | $20.00 | $46.32 |
| 7 | Embankment, as per plan (203E20001) | CY | 10 | $113.00 | $125.00 | $115.79 |
| 8 | Roadway, misc.:embankment (203E98500) | LS | 1 | $4,000.00 | $3,200.00 | $9,289.75 |
| 9 | Roadway, misc.:excavation (203E98500) | LS | 1 | $12,000 | $4,000.00 | $6,879.15 |
| 10 | Subgrade compaction (204E10000) | SY | 975 | $1.00 | $2.50 | $4.05 |
| 11 | Excavation of subgrade (204E13000) | CY | 50 | $40.00 | $70.00 | $70.53 |
| 12 | Granular material, type B (204E30010) | CY | 50 | $60.00 | $75.00 | $114.63 |
| 13 | Geotextile fabric (204E50000) | SY | 100 | $2.00 | $6.00 | $8.11 |
| 14 | Geogrid (204E51000) | SY | 100 | $3.00 | $9.00 | $10.42 |
| 15 | Reshaping under guardrail (209E15000) | STA | 1.29 | $250.00 | $1,500.00 | $1,157.89 |
| 16 | Linear grading (209E60200) | STA | 1.29 | $550.00 | $750.00 | $1,736.84 |
| 17 | Guardrail, misc.: timber guardrail (type B) (606E98000) | FT | 129 | $190.00 | $158.00 | $192.21 |
| 18 | Fence, type CLT (607E23000) | FT | 168 | $70.00 | $58.00 | $81.05 |
| 19 | 6" concrete walk, as per plan (608E13001) | SF | 344 | $9.50 | $22.00 | $19.68 |
| 20 | Special - potholing (690E98000) | EACH | 5 | $248.00 | $1,000.00 | $736.84 |
| 21 | Special - pre-construction video (690E98400) | LS | 1 | $610.00 | $30.00 | $2,315.79 |
| 22 | Soil analysis test (659E00100) | EACH | 2 | $10.00 | $462.50 | $89.47 |
| 23 | Topsoil (659E00300) | CY | 45 | $85.00 | $65.00 | $75.26 |
| 24 | Seeding and mulching, as per plan (659E10001) | SY | 395 | $9.00 | $2.95 | $10.42 |
| 25 | Commercial fertilizer (659E20000) | TON | 0.05 | $10.00 | $1,125.00 | $1,736.80 |
| 26 | Lime (659E31000) | ACRE | 0.08 | $10.00 | $1.00 | $173.63 |
| 27 | Water (659E35000) | MGAL | 2.15 | $10.00 | $212.50 | $32.80 |
| 28 | Slope erosion protection, as per plan (670E00501) | SY | 395 | $6.50 | $1.55 | $5.79 |
| 29 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 |
| 30 | 6" unclassified pipe underdrains, as per plan (605E13301) | FT | 203 | $19.00 | $28.00 | $39.52 |
| 31 | 6" base pipe underdrains, as per plan (605E14001) | FT | 132 | $16.50 | $30.00 | $44.00 |
| 32 | 12" conduit, type C (611E04600) | FT | 186 | $205.00 | $173.00 | $128.14 |
| 33 | Conduit, misc.:type C for drainage discharge conti (611E97400) | FT | 50 | $175.00 | $40.00 | $73.16 |
| 34 | Conduit, misc.:type E for drainage discharge conti (611E97400) | FT | 50 | $155.00 | $40.00 | $83.37 |
| 35 | Conduit, misc.:type F for drainage discharge conti (611E97400) | FT | 50 | $158.00 | $60.00 | $93.58 |
| 36 | Catch basin, no. 7 (611E98390) | EACH | 2 | $4,550.00 | $3,000.00 | $4,896.19 |
| 37 | Catch basin grate, as per plan (611E98645) | EACH | 3 | $225.00 | $350.00 | $521.05 |
| 38 | Manhole, no. 3 (611E99574) | EACH | 2 | $4,931.00 | $5,300.00 | $7,433.61 |
| 39 | Inspection well (611E99720) | EACH | 2 | $2,695.00 | $1,400.00 | $1,736.84 |
| 40 | Special - miscellaneous metal (611E99820) | LB | 3,750 | $2.40 | $2.00 | $1.05 |
| 41 | Drainage structure, misc.: inspection well adjuste (611E99900) | EACH | 2 | $500.00 | $300.00 | $868.42 |
| 42 | Low strength mortar backfill (type 1) (613E41250) | CY | 100 | $103.00 | $120.00 | $231.58 |
| 43 | Full depth pavement sawing (255E20000) | FT | 243 | $2.50 | $3.00 | $5.79 |
| 44 | Aggregate base, as per plan (304E20001) | CY | 161 | $67.00 | $112.00 | $141.51 |
| 45 | 9" reinforced concrete pavement, class QC 1P, as per plan (451E14011) | SY | 891 | $95.00 | $135.00 | $167.89 |
| 46 | 8" non-reinforced concrete pavement, class QC MS, as per plan (452E12051) | SY | 9 | $175.00 | $475.00 | $289.47 |
| 47 | Curb, type 2-A, as per plan (609E14001) | FT | 148 | $6.00 | $10.00 | $57.89 |
| 48 | Curb, misc.:mountable curb (609E98000) | FT | 355 | $10.00 | $11.00 | $55.58 |
| 49 | Valve box adjusted to grade, as per plan (638E10801) | EACH | 3 | $500.00 | $200.00 | $1,157.89 |
| 50 | Water work, misc.:water meter adjusted to grade (638E98000) | EACH | 1 | $550.00 | $1,111.00 | $1,736.84 |
| 51 | Manhole adjusted to grade (611E99654) | EACH | 1 | $1,500.00 | $940.00 | $2,894.74 |
| 52 | Ground mounted support, no. 3 post (630E03100) | FT | 65 | $27.00 | $13.00 | $28.95 |
| 53 | Sign post reflector (630E08600) | EACH | 1 | $55.00 | $37.00 | $70.53 |
| 54 | Sign, flat sheet (630E80100) | SF | 6.30 | $49.00 | $35.00 | $70.53 |
| 55 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $18.00 | $55.00 | $70.53 |
| 56 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $86.00 | $58.00 | $115.79 |
| 57 | Removal of ground mounted post support and disposal (630E86002) | EACH | 5 | $25.00 | $45.00 | $70.53 |
| 58 | Edge line, 4" (646E10000) | MI | 0.01 | $92,275 | $300,000 | $405,263 |
| 59 | Crosswalk line, 12" (646E10510) | FT | 56 | $10.00 | $9.00 | $17.37 |
| 60 | Transverse/diagonal line (646E10600) | FT | 80 | $15.00 | $10.00 | $18.53 |
| 61 | Parking lot stall marking (646E20200) | FT | 315 | $7.50 | $2.00 | $3.47 |
| 62 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $123.00 | $100.00 | $115.79 |
| 63 | Portable changeable message sign, as per plan (614E18601) | SNMT | 10 | $955.00 | $750.00 | $1,389.47 |
| 64 | Water (616E10000) | MGAL | 10 | $91.00 | $67.00 | $7.53 |
| 65 | Special - oepa notification form (690E98400) | LS | 1 | $615.00 | $110.00 | $2,894.74 |
| 66 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $5,000.00 | $8,000.00 | $11,744 |
| 67 | Removal misc.: debris removed (202E98000) | LS | 1 | $6,000.00 | $1,400.00 | $5,739.74 |
| 68 | Removal misc.: pipe railing removed (202E98200) | FT | 55 | $16.00 | $65.00 | $18.53 |
| 69 | Aggregate base, as per plan (304E20001) | CY | 201 | $95.00 | $108.00 | $162.91 |
| 70 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $11,010 | $1,100.00 | $11,579 |
| 71 | Unclassified excavation, as per plan (503E21101) | CY | 266 | $90.00 | $60.00 | $69.13 |
| 72 | Epoxy coated steel reinforcement (509E10000) | LB | 7,786 | $3.00 | $2.40 | $3.42 |
| 73 | Class QC1 concrete, footing (511E46510) | CY | 44 | $299.00 | $560.00 | $1,736.84 |
| 74 | Concrete, misc.: class QC SCC, retaining wall abov (511E71100) | CY | 23 | $2,061.00 | $2,400.00 | $6,231.73 |
| 75 | Sealing of concrete surfaces (non-epoxy) (512E10050) | SY | 459 | $13.00 | $12.00 | $28.95 |
| 76 | 1" preformed expansion joint filler, as per plan (516E13601) | SF | 76 | $9.00 | $24.00 | $86.84 |
| 77 | Porous backfill with geotextile fabric (518E21200) | CY | 81 | $120.00 | $225.00 | $163.46 |
| 78 | 6" perforated corrugated plastic pipe (518E40000) | FT | 347 | $27.00 | $15.00 | $34.74 |
| 79 | 6" non-perforated corrugated plastic pipe, including specials, as per plan (518E40011) | FT | 160 | $38.00 | $42.00 | $46.32 |
| 80 | Special - structures brick masonry arch repair (530E00400) | EACH | 100 | $183.00 | $110.00 | $150.37 |
| 81 | Special - structures tuck pointing underside of BR (530E00600) | SF | 348 | $61.00 | $65.00 | $49.79 |
| 82 | Special - structures cleaning exposed masonry surf (530E00800) | SY | 431 | $18.00 | $25.00 | $23.16 |
| 83 | Special - structures tuck pointing sandstone block (530E00800) | SY | 392 | $42.00 | $216.00 | $34.11 |
| 84 | Special - structures cellular grout fill (530E01100) | CY | 813 | $248.00 | $212.00 | $287.35 |
| 85 | Special - structures existing sandstone block rese (530E01100) | CY | 5 | $2,706.00 | $1,600.00 | $4,168.42 |
| 86 | Special - structures sandstone block furnished and (530E01100) | CY | 2 | $8,735.00 | $2,900.00 | $6,368.42 |
| 87 | Special - structures arch ring crack repair (530E01300) | FT | 26 | $484.00 | $125.00 | $478.95 |
| 88 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $9,894.00 | $13,500 | $32,947 |
| 89 | Maintaining traffic (614E11000) | LS | 1 | $7,089.00 | $8,000.00 | $17,088 |
| 90 | Field office, type B, as per plan (619E16011) | MNTH | 6 | $1,845.00 | $3,100.00 | $1,736.84 |
| 91 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,192 | $4,875.00 | $14,600 |
| 92 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $6,003.00 | $1,775.00 | $7,052.75 |
| 93 | Post construction survey monument verification and report (623E51000) | LS | 1 | $8,562.00 | $1,775.00 | $5,242.20 |
| 94 | Mobilization (624E10000) | LS | 1 | $61,027 | $48,000 | $43,177 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 7, 2026. Compiled by Mirage Metrics.