Madex Construction Co: ODOT bid record

Madex Construction Co submitted 73 bids on Ohio DOT contracts in the data, from 13 JAN 2022 to 12 NOV 2026, and was the low bidder on 7 of them (10%). When it was not low, its total sat a median +37% above the low bid.

Owner
Ohio DOT
Low bid volume
$7,477,128
Latest bid
12 NOV 2026
Data through
12 NOV 2026
73Bids
7Low bids
10Win rate, percent
+37%Median gap to the low bid when not low, 65 bids

By year

YearBidsLow bidsWin rate
2022700%
2023500%
2024700%
202524521%
20263027%
Madex Construction Co, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
CUY1500%
CLI6117%
WAY400%
HUR300%
GEA3267%
LOR200%
RIC200%
LAK200%
GRE200%
District 122150%
HAM2150%
COL200%
Madex Construction Co, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH6565 (100%)$1.00$1.00
Excavation203E10000CY4913 (27%)$44.19$27.00
Topsoil659E00300CY4911 (22%)$75.26$45.00
Seeding and mulching659E10000SY3410 (29%)$4.45$2.60
Water616E10000MGAL199 (47%)$35.27$20.00
Water659E35000MGAL528 (15%)$17.95$1.00
Embankment203E20000CY447 (16%)$55.41$25.00
Field office, type B, as per plan619E16011MNTH107 (70%)$1,289.01$2,000.00
Lime659E31000ACRE505 (10%)$605.19$150.00
Commercial fertilizer659E20000TON485 (10%)$1,736.82$850.00
Subgrade compaction204E10000SY305 (17%)$4.63$3.00
Pavement removed202E23000SY305 (17%)$37.88$17.00
Madex Construction Co, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Madex Construction Co, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260493CLICLI-US 68-09.42 (CULVERT REPLACEMENT)3 of 5$278,575+16%
12 NOV 2026260505LORLOR-SR 252-03.65 (CULVERT REPLACEMENT)6 of 7$695,395+37%
12 NOV 2026264030CUYCUY-SR 43-04.80 Replace (BRIDGE REPLACEMENT (1 BRIDGE))4 of 4$2,449,538+64%
29 OCT 2026264027CLICLI-/GRE Inverts FY27 (CULVERT REPLACEMENT)2 of 3$999,343+26%
29 OCT 2026264029LAKLAK-SR 283-03.29 Sidewalk (SIDEWALK)4 of 4$694,265+46%
15 OCT 2026268020COLCOL-PR-FY2027 (PRUNING/OR TREE/BRUSH REMOVAL)2 of 2$1,065,868+202%
01 OCT 2026264025CLICLI-SR 72-02.18 (CULVERT REPLACEMENT)4 of 5$399,772+35%
17 SEP 2026260402CUYCUY-Cle Downtown Connector Trl 1 (BIKEWAYS)4 of 5$1,699,621+28%
17 SEP 2026264022ASDASD-/WAY BH FY2027(B) (BRIDGE REPAIR)3 of 3$426,102+49%
27 AUG 2026260391CUYCUY-IR 480-11.64 BH (BRIDGE REPAIR)4 of 6$594,945+37%
13 AUG 2026260369RICRIC-/WAY-IR 71/SR 226-19.61/05.26 (CULVERT REPLACEMENT)2 of 3$997,722+43%
30 JUL 2026260341ALLALL-Delphos S. Main St. Trail (SIDEWALK)5 of 5$749,002+61%
30 JUL 2026260349HAMHAM-Inverts FY2027 (CULVERT REPLACEMENT)1 of 5$1,887,878Low, 2.0% under the second
16 JUL 2026260333TRUTRU-SR 46-00.50 (Sidewalks) (SIDEWALK)3 of 4$546,675+42%
25 JUN 2026260323PORPOR-Ravenna Rd (Parking Lot) (PARKING AREAS)1 of 5$274,979Low, 8.0% under the second
25 JUN 2026264016HANHAN-SR 15-23.33 (INTERSECTION)2 of 2$299,652+20%
25 JUN 2026268012VANVAN-Bonnewitz Avenue Signal (SIGNALIZATION)3 of 3$1,309,847+131%
11 JUN 2026268011HENHEN-US 24-13.83 Collision Repair (BRIDGE REPAIR)2 of 2$134,661+44%
21 MAY 2026264015WAYWAY-SR 3-04.62/08.55/08.96/11.61 (CULVERT REPLACEMENT)3 of 3$949,438+56%
07 MAY 2026260233CUYCUY-Old Detroit Rd Bridge Rehab (MISCELLANEOUS)3 of 3$1,334,482+41%
07 MAY 2026260234CUYCUY-South Park Shared Use Path (BIKEWAYS)5 of 5$854,153+11%
07 MAY 2026260235CUYCUY-SR 8-00.52 Pedestrian (SIDEWALK)6 of 6$1,593,159+77%
23 APR 2026260217CUYCUY-IR 480-16.56 Slide (SLIDE REPAIR)4 of 4$894,393+11%
23 APR 2026264010JEFJEF-Wintersville Sidewalk Improv (SIDEWALK)2 of 3$399,862+37%
09 APR 2026260187WYAWYA-Carey SRTS Phase 2 (SIDEWALK)6 of 6$579,757+121%
Madex Construction Co: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy