ODOT contract 260323 bid tabulation
POR-Ravenna Rd (Parking Lot) (PARKING AREAS). Let by Ohio DOT on June 25, 2026, POR. 5 bids received; low bid $274,979 by Madex Construction Co, +1.8% against the engineer's estimate of $270,000.
- Owner
- Ohio DOT
- Letting
- 25 JUN 2026
- Pay items
- 47
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Madex Construction Co | $274,979 | Low | +2.0% |
| 2 | Protect-A-Cote | $297,422 | +8.0% | +10% |
| 3 | Eclipse Co LLC | $312,524 | +14% | +16% |
| 4 | Geauga Highway Co | $339,050 | +23% | +26% |
| 5 | Matt Winters Excavation LLC | $345,768 | +26% | +28% |
Engineer's estimate: $270,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Madex Construction Co | 2. Protect-A-Cote | 3. Eclipse Co LLC | 4. Geauga Highway Co | 5. Matt Winters Excavation LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $3,781.27 | $28,000 | $12,000 | $4,000.00 | $12,500 |
| 2 | Pavement removed, as per plan (202E23001) | SY | 318 | $22.52 | $10.00 | $18.51 | $18.00 | $30.00 |
| 3 | Pavement removed, as per plan (202E23001) | SY | 352 | $20.02 | $10.00 | $9.23 | $11.00 | $25.00 |
| 4 | Removal misc.: inspection well (202E98100) | EACH | 2 | $426.06 | $2,000.00 | $230.00 | $650.00 | $200.00 |
| 5 | Removal misc.:bollards removed (202E98100) | EACH | 3 | $275.35 | $100.00 | $72.33 | $150.00 | $500.00 |
| 6 | Removal misc.: conduit (202E98200) | FT | 70 | $27.79 | $10.00 | $28.00 | $10.00 | $35.00 |
| 7 | Excavation (203E10000) | CY | 520 | $28.95 | $20.00 | $20.95 | $75.00 | $45.00 |
| 8 | Embankment (203E20000) | CY | 520 | $28.95 | $20.00 | $25.55 | $70.00 | $75.00 |
| 9 | Embankment, as per plan (203E20001) | CY | 50 | $28.95 | $20.00 | $55.00 | $70.00 | $75.00 |
| 10 | Roadway, misc.:tone block delivery and placement (203E98600) | EACH | 2 | $1,601.16 | $200.00 | $742.58 | $750.00 | $2,500.00 |
| 11 | Subgrade compaction (204E10000) | SY | 1,875 | $2.32 | $1.00 | $1.74 | $1.75 | $5.00 |
| 12 | Excavation of subgrade (204E13000) | CY | 29 | $28.95 | $20.00 | $62.90 | $60.00 | $25.00 |
| 13 | Granular material, type B (204E30010) | CY | 29 | $99.58 | $50.00 | $112.58 | $70.00 | $100.00 |
| 14 | Proof rolling (204E45000) | HR | 1 | $211.59 | $100.00 | $647.00 | $100.00 | $500.00 |
| 15 | Geotextile fabric (204E50000) | SY | 98 | $8.86 | $5.00 | $12.96 | $5.50 | $16.00 |
| 16 | Topsoil stockpiled, as per plan (651E10001) | CY | 200 | $28.95 | $20.00 | $8.29 | $35.00 | $20.00 |
| 17 | Topsoil furnished and placed, as per plan (653E10001) | CY | 200 | $28.95 | $20.00 | $47.45 | $35.00 | $75.00 |
| 18 | Special - concrete parking block (690E50500) | EACH | 24 | $231.58 | $200.00 | $199.68 | $250.00 | $150.00 |
| 19 | Special - bollard (690E50600) | EACH | 2 | $2,142.11 | $2,000.00 | $3,151.55 | $1,350.00 | $900.00 |
| 20 | Special - as-built construction plans (690E91000) | LS | 1 | $4,631.58 | $4,500.00 | $5,354.85 | $5,000.00 | $4,000.00 |
| 21 | Special - survey control verification (690E98400) | LS | 1 | $5,210.53 | $2,380.00 | $4,239.26 | $3,500.00 | $2,000.00 |
| 22 | Seeding and mulching, as per plan (659E10001) | SY | 841 | $4.63 | $4.00 | $12.85 | $8.50 | $12.00 |
| 23 | Erosion control (832E30000) | EACH | 9,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 20 | $7.89 | $100.00 | $53.00 | $80.00 | $84.00 |
| 25 | Conduit, misc.: type E for drainage discharge cont (611E97400) | FT | 20 | $7.89 | $100.00 | $53.00 | $80.00 | $84.00 |
| 26 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 20 | $7.89 | $100.00 | $53.00 | $80.00 | $84.00 |
| 27 | Inspection well (611E99720) | EACH | 1 | $178.95 | $2,000.00 | $2,500.00 | $1,250.00 | $1,250.00 |
| 28 | Aggregate base (304E20000) | CY | 306.70 | $104.21 | $100.00 | $104.29 | $115.00 | $150.00 |
| 29 | Tack coat (407E10000) | GAL | 86 | $3.47 | $4.00 | $2.58 | $3.00 | $3.50 |
| 30 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 66 | $405.26 | $330.00 | $343.87 | $275.00 | $355.00 |
| 31 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 112 | $312.63 | $330.00 | $296.22 | $270.00 | $275.00 |
| 32 | 6" reinforced concrete pavement, class QC 1P, as per plan (451E10011) | SY | 142 | $125.42 | $130.00 | $129.01 | $130.00 | $150.00 |
| 33 | Delineator, post ground mounted (620E00500) | EACH | 7 | $202.63 | $110.00 | $88.77 | $145.00 | $85.00 |
| 34 | Ground mounted support, no. 3 post (630E03100) | FT | 20 | $70.53 | $6.00 | $63.99 | $40.00 | $60.00 |
| 35 | Sign, flat sheet (630E80100) | SF | 6.50 | $70.53 | $60.00 | $65.66 | $55.00 | $60.00 |
| 36 | Signing, misc.:additional signs, ground mounted (630E97700) | EACH | 5 | $289.47 | $50.00 | $320.93 | $200.00 | $290.00 |
| 37 | Stop line (646E10400) | FT | 17 | $34.74 | $5.00 | $32.35 | $50.00 | $30.00 |
| 38 | Transverse/diagonal line (646E10600) | FT | 372 | $23.16 | $5.00 | $21.20 | $25.00 | $20.00 |
| 39 | Parking lot stall marking (646E20200) | FT | 414 | $3.47 | $3.00 | $3.07 | $10.00 | $3.00 |
| 40 | Deciduous shrub, 2' height, as per plan panicum VI (661E20041) | EACH | 10 | $173.68 | $100.00 | $1,664.51 | $125.00 | $350.00 |
| 41 | Planting, misc.:, #3 washed river stone mulch (661E99930) | SY | 13 | $89.07 | $200.00 | $37.49 | $100.00 | $230.00 |
| 42 | Water (616E10000) | MGAL | 2.80 | $7.53 | $100.00 | $43.64 | $100.00 | $700.00 |
| 43 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,136.84 | $10,000 | $4,499.86 | $344.00 | $7,000.00 |
| 44 | Maintaining traffic (614E11000) | LS | 1 | $5,210.53 | $10,000 | $4,910.29 | $50,000 | $4,500.00 |
| 45 | Field office, type B (619E16010) | MNTH | 4 | $736.84 | $1,000.00 | $1,908.66 | $375.00 | $150.00 |
| 46 | Construction layout stakes and surveying (623E10000) | LS | 1 | $9,263.16 | $6,172.00 | $5,405.51 | $5,000.00 | $3,365.00 |
| 47 | Mobilization (624E10000) | LS | 1 | $10,958 | $40,000 | $33,000 | $2,000.00 | $10,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of June 25, 2026. Compiled by Mirage Metrics.