Matt Winters Excavation LLC: ODOT bid record

Matt Winters Excavation LLC submitted 12 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 25 JUN 2026, and was the low bidder on 4 of them (33%). When it was not low, its total sat a median +22% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,847,773
Latest bid
25 JUN 2026
Data through
12 NOV 2026
12Bids
4Low bids
33Win rate, percent
+22%Median gap to the low bid when not low, 8 bids

By year

YearBidsLow bidsWin rate
2020200%
2023200%
202422100%
20252150%
20264125%
Matt Winters Excavation LLC, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
POR4125%
GEA3267%
LOR100%
MAH100%
CUY100%
SUM100%
STA11100%
Matt Winters Excavation LLC, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH1212 (100%)$1.00$1.00
Excavation203E10000CY145 (36%)$28.50$27.00
Water659E35000MGAL115 (45%)$1.00$1.00
Class QC1 concrete, footing511E46510CY55 (100%)$450.00$690.00
Class QC1 concrete, retaining/wingwall not including footing511E46010CY55 (100%)$1,300.00$1,470.00
Field office, type B619E16010MNTH74 (57%)$250.00$2,000.00
Water616E10000MGAL54 (80%)$10.00$20.00
Aggregate base304E20000CY103 (30%)$110.00$90.00
Class QC1 concrete, headwall511E46610CY53 (60%)$1,300.00$1,897.38
Embankment203E20000CY112 (18%)$53.00$25.00
Epoxy coated steel reinforcement509E10000LB102 (20%)$2.00$2.00
Removal of ground mounted post support and disposal630E86002EACH72 (29%)$26.00$23.50
Matt Winters Excavation LLC, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Matt Winters Excavation LLC, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
25 JUN 2026260323PORPOR-Ravenna Rd (Parking Lot) (PARKING AREAS)5 of 5$345,768+26%
09 APR 2026260183STASTA-Sippo Valley Trail Bridge 8 (BRIDGE REPLACEMENT (1 BRIDGE))1 of 5$744,413Low, 7.0% under the second
12 MAR 2026260098SUMSUM-SR 91-07.89 (BRIDGE REPAIR)2 of 3$2,471,804+13%
29 JAN 2026260051CUYCUY-Greenhurst Drive Bridge Demo (MISCELLANEOUS)4 of 5$466,187+40%
25 SEP 2025250441PORPOR-SR 305-02.43/02.58 (BRIDGE REPAIR)5 of 9$1,343,190+11%
13 FEB 2025250073GEAGEA-US 322/SR 44-08.63/14.93 (CULVERT REPLACEMENT)1 of 5$1,425,622Low, 16% under the second
14 NOV 2024240492GEAGEA-SR 87-12.13 Replace (BRIDGE REPLACEMENT (1 BRIDGE))1 of 5$1,513,228Low, 8.0% under the second
25 JAN 2024240064PORPOR-/TRU-SR 305/VAR-00.72/VAR (CULVERT REPLACEMENT)1 of 4$2,164,510Low, 2.0% under the second
09 NOV 2023230545MAHMAH-IR 76-03.03 Noise Wall (NOISE WALLS)4 of 7$1,370,059+19%
25 MAY 2023230345PORPOR-/STA Culverts FY2023 (CULVERT REPLACEMENT)3 of 6$909,592+18%
13 FEB 2020200063LORLOR-SR 113-07.76 (CULVERT REPLACEMENT)6 of 8$388,421+38%
23 JAN 2020200040GEAGEA-SR 168-04.10 Culvert (CULVERT REPLACEMENT)6 of 12$267,321+26%
Matt Winters Excavation LLC: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy