ODOT contract 250073 bid tabulation
GEA-US 322/SR 44-08.63/14.93 (CULVERT REPLACEMENT). Let by Ohio DOT on February 13, 2025, GEA. 5 bids received; low bid $1,425,622 by Matt Winters Excavation LLC, +1.8% against the engineer's estimate of $1,400,000.
- Owner
- Ohio DOT
- Letting
- 13 FEB 2025
- Pay items
- 84
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Matt Winters Excavation LLC | $1,425,622 | Low | +2.0% |
| 2 | Marucci & Gaffney Excavating Co | $1,648,594 | +16% | +18% |
| 3 | Eclipse Co LLC | $1,750,950 | +23% | +25% |
| 4 | Union Industrial Contractors Inc | $1,932,389 | +36% | +38% |
| 5 | S E T Inc | $2,620,000 | +84% | +87% |
Engineer's estimate: $1,400,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Matt Winters Excavation LLC | 2. Marucci & Gaffney Excavating Co | 3. Eclipse Co LLC | 4. Union Industrial Contractors Inc | 5. S E T Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,000.00 | $20,000 | $6,000.00 | $25,000 | $20,000 |
| 2 | Pavement removed (202E23000) | SY | 1,445 | $18.00 | $25.00 | $16.00 | $20.00 | $17.00 |
| 3 | Guardrail removed (202E38000) | FT | 1,632 | $5.00 | $2.00 | $2.00 | $3.00 | $3.00 |
| 4 | Excavation (203E10000) | CY | 668 | $20.00 | $35.00 | $56.00 | $45.00 | $48.00 |
| 5 | Embankment (203E20000) | CY | 38 | $40.00 | $50.00 | $62.00 | $120.00 | $124.00 |
| 6 | Subgrade compaction (204E10000) | SY | 2,293 | $5.00 | $5.00 | $1.00 | $3.00 | $4.00 |
| 7 | Guardrail, type MGS (606E15050) | FT | 1,881.25 | $19.00 | $18.00 | $18.40 | $18.00 | $19.00 |
| 8 | Guardrail, type MGS, long-span (606E17360) | FT | 225 | $26.00 | $19.60 | $20.20 | $20.00 | $26.00 |
| 9 | Rounded end section (606E20050) | EACH | 1 | $80.00 | $65.00 | $60.00 | $65.00 | $79.00 |
| 10 | Anchor assembly, type E (606E26100) | EACH | 9 | $2,500.00 | $2,350.00 | $2,450.00 | $2,350.00 | $2,599.00 |
| 11 | Anchor assembly, type T (606E26500) | EACH | 1 | $1,000.00 | $1,420.00 | $1,450.00 | $1,420.00 | $1,024.00 |
| 12 | Monument assembly, type C (623E38500) | EACH | 1 | $1,100.00 | $2,500.00 | $3,715.00 | $1,400.00 | $2,349.00 |
| 13 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 1 | $650.00 | $2,000.00 | $704.00 | $725.00 | $1,072.00 |
| 14 | Monument assembly reconstructed to grade (623E39600) | EACH | 1 | $700.00 | $2,000.00 | $1,408.00 | $850.00 | $1,072.00 |
| 15 | Special - misc.: work involving asbestos containin (690E98400) | LS | 1 | $375.00 | $50.00 | $526.00 | $1,000.00 | $5,250.00 |
| 16 | Soil analysis test (659E00100) | EACH | 4 | $175.00 | $10.00 | $158.00 | $100.00 | $158.00 |
| 17 | Topsoil (659E00300) | CY | 184 | $60.00 | $60.00 | $62.00 | $75.00 | $96.00 |
| 18 | Seeding and mulching (659E10000) | SY | 1,653 | $4.00 | $3.50 | $2.00 | $4.00 | $3.00 |
| 19 | Repair seeding and mulching (659E14000) | SY | 83 | $1.50 | $0.27 | $1.00 | $4.00 | $10.00 |
| 20 | Inter-seeding (659E15000) | SY | 83 | $0.25 | $0.27 | $1.00 | $4.00 | $10.00 |
| 21 | Commercial fertilizer (659E20000) | TON | 0.23 | $550.00 | $400.00 | $1,577.00 | $1,500.00 | $7,792.00 |
| 22 | Lime (659E31000) | ACRE | 0.35 | $55.00 | $20.00 | $946.00 | $1,000.00 | $8,535.00 |
| 23 | Water (659E35000) | MGAL | 9 | $1.00 | $0.10 | $1.00 | $40.00 | $275.00 |
| 24 | Erosion control (832E30000) | EACH | 20,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 25 | Rock channel protection, type C with filter (601E32200) | CY | 70 | $195.00 | $90.00 | $168.00 | $200.00 | $329.00 |
| 26 | Aggregate drains (605E31100) | FT | 145 | $30.00 | $25.00 | $20.00 | $20.00 | $32.00 |
| 27 | 6" conduit, type B (611E00900) | FT | 100 | $8.00 | $4.00 | $42.00 | $25.00 | $54.00 |
| 28 | 6" conduit, type E (611E01400) | FT | 100 | $10.00 | $4.00 | $31.00 | $25.00 | $41.00 |
| 29 | 6" conduit, type F (611E01500) | FT | 100 | $11.00 | $4.00 | $31.00 | $25.00 | $41.00 |
| 30 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 413 | $295.00 | $225.00 | $245.00 | $225.00 | $236.00 |
| 31 | Aggregate base (304E20000) | CY | 329 | $125.00 | $135.00 | $112.00 | $125.00 | $121.00 |
| 32 | Tack coat (407E10000) | GAL | 311 | $3.50 | $3.00 | $5.00 | $3.00 | $3.00 |
| 33 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 158 | $300.00 | $330.00 | $485.00 | $330.00 | $347.00 |
| 34 | Barrier reflector, type 2, BI-directional (626E00110) | EACH | 39 | $12.00 | $11.70 | $14.00 | $12.00 | $12.00 |
| 35 | Edge line, 6" (644E00104) | MI | 0.36 | $14,500 | $20,000 | $14,275 | $14,275 | $9,518.00 |
| 36 | Center line (644E00300) | MI | 0.23 | $18,200 | $20,000 | $18,140 | $18,140 | $12,689 |
| 37 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 12 | $2,200.00 | $2,300.00 | $2,190.00 | $2,190.00 | $2,436.00 |
| 38 | Barrier reflector, type 1 (BI-directional) (614E13310) | EACH | 42 | $15.00 | $14.00 | $15.00 | $14.00 | $21.00 |
| 39 | Object marker, two way (614E13360) | EACH | 42 | $20.00 | $18.00 | $19.00 | $18.00 | $26.00 |
| 40 | Work zone center line, class I, 642 paint (614E21100) | MI | 0.80 | $4,800.00 | $4,795.00 | $5,040.00 | $4,800.00 | $9,754.00 |
| 41 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.73 | $3,900.00 | $3,890.00 | $4,088.00 | $3,900.00 | $7,318.00 |
| 42 | Work zone edge line, class I, 6", 740.06, type I (614E22210) | MI | 0.18 | $8,000.00 | $7,920.00 | $8,324.00 | $8,000.00 | $30,271 |
| 43 | Work zone stop line, class I, 642 paint (614E26200) | FT | 205 | $8.00 | $7.50 | $8.00 | $7.50 | $3.00 |
| 44 | Pavement for maintaining traffic, class A (615E20000) | SY | 736 | $125.00 | $100.00 | $146.00 | $130.00 | $174.00 |
| 45 | Water (616E10000) | MGAL | 2 | $10.00 | $0.10 | $101.00 | $15.00 | $1,239.00 |
| 46 | Portable barrier, unanchored (622E41100) | FT | 2,039 | $35.00 | $28.00 | $27.00 | $24.00 | $41.00 |
| 47 | Structure removed (202E11000) | LS | 1 | $6,500.00 | $40,000 | $35,000 | $85,000 | $20,000 |
| 48 | Excavation, as per plan (203E10001) | CY | 100 | $28.00 | $20.00 | $82.00 | $115.00 | $40.00 |
| 49 | Granular material, type B (203E35110) | CY | 100 | $90.00 | $50.00 | $115.00 | $150.00 | $130.00 |
| 50 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $75,000 | $225,000 | $149,000 | $150,000 | $400,000 |
| 51 | Epoxy coated steel reinforcement (509E10000) | LB | 5,413 | $1.75 | $1.90 | $2.00 | $3.50 | $4.00 |
| 52 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 17 | $1,300.00 | $1,800.00 | $2,266.00 | $2,400.00 | $3,200.00 |
| 53 | Class QC1 concrete, footing (511E46510) | CY | 47 | $575.00 | $750.00 | $1,157.00 | $900.00 | $1,200.00 |
| 54 | Class QC1 concrete, headwall (511E46610) | CY | 2 | $1,300.00 | $2,000.00 | $2,073.00 | $3,000.00 | $4,300.00 |
| 55 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 55 | $80.00 | $40.00 | $83.00 | $45.00 | $40.00 |
| 56 | Type 2 waterproofing (512E33000) | SY | 82 | $35.00 | $45.00 | $45.00 | $45.00 | $90.00 |
| 57 | Type 3 waterproofing (512E33010) | SY | 90 | $65.00 | $90.00 | $62.00 | $60.00 | $140.00 |
| 58 | 1" preformed expansion joint filler (516E13600) | SF | 32 | $16.00 | $10.00 | $6.00 | $15.00 | $20.00 |
| 59 | Porous backfill with geotextile fabric (518E21200) | CY | 21 | $250.00 | $120.00 | $164.00 | $155.00 | $300.00 |
| 60 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 47 | $230.00 | $90.00 | $151.00 | $200.00 | $400.00 |
| 61 | 14' X 5' conduit, type A, 706.05, as per plan (611E96311) | FT | 51 | $2,350.00 | $2,392.00 | $2,588.00 | $4,500.00 | $4,000.00 |
| 62 | Structure removed (202E11000) | LS | 1 | $7,500.00 | $40,000 | $18,000 | $45,000 | $20,000 |
| 63 | Cofferdams and excavation bracing, as per plan (503E11101) | LS | 1 | $38,000 | $65,000 | $138,000 | $100,000 | $300,000 |
| 64 | Unclassified excavation (503E21300) | LS | 1 | $8,500.00 | $5,000.00 | $24,524 | $3,500.00 | $2,000.00 |
| 65 | Epoxy coated steel reinforcement (509E10000) | LB | 3,101 | $2.25 | $2.00 | $2.00 | $3.50 | $4.00 |
| 66 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 8 | $1,600.00 | $2,000.00 | $2,574.00 | $2,600.00 | $4,200.00 |
| 67 | Class QC1 concrete, footing (511E46510) | CY | 25 | $675.00 | $750.00 | $869.72 | $950.00 | $1,800.00 |
| 68 | Class QC1 concrete, headwall (511E46610) | CY | 2 | $1,000.00 | $2,000.00 | $2,054.00 | $3,000.00 | $4,000.00 |
| 69 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 31 | $80.00 | $40.00 | $130.00 | $45.00 | $40.00 |
| 70 | Type 2 waterproofing (512E33000) | SY | 79 | $36.00 | $45.00 | $24.00 | $45.00 | $90.00 |
| 71 | Type 3 waterproofing (512E33010) | SY | 73 | $70.00 | $90.00 | $55.00 | $60.00 | $140.00 |
| 72 | 1" preformed expansion joint filler (516E13600) | SF | 28 | $20.00 | $10.00 | $7.00 | $15.00 | $20.00 |
| 73 | Porous backfill with geotextile fabric (518E21200) | CY | 9 | $325.00 | $150.00 | $143.00 | $150.00 | $600.00 |
| 74 | Rock channel protection, type B with geotextile fabric (601E32104) | CY | 45 | $250.00 | $90.00 | $147.00 | $200.00 | $400.00 |
| 75 | 9' X 4' conduit, type A, 706.05, as per plan (611E94937) | FT | 62 | $1,100.00 | $1,390.00 | $1,490.00 | $1,650.00 | $3,000.00 |
| 76 | Low strength mortar backfill (613E41200) | CY | 411 | $250.00 | $169.00 | $149.00 | $155.00 | $200.00 |
| 77 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,000 | $11,000 | $23,000 | $25,000 | $30,410 |
| 78 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $3,200.75 | $5,000.00 | $2,628.00 | $10,000 | $5,000.00 |
| 79 | Maintaining traffic (614E11000) | LS | 1 | $139,700 | $170,000 | $146,000 | $175,000 | $150,000 |
| 80 | Field office, type B (619E16010) | MNTH | 6 | $250.00 | $100.00 | $683.00 | $2,200.00 | $2,800.00 |
| 81 | Construction layout stakes and surveying (623E10000) | LS | 1 | $9,000.00 | $7,000.00 | $14,742 | $35,000 | $20,000 |
| 82 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $2,000.00 | $5,000.00 | $5,794.00 | $2,400.00 | $3,500.00 |
| 83 | Post construction survey monument verification and report (623E51000) | LS | 1 | $2,000.00 | $3,500.00 | $5,794.00 | $1,000.00 | $3,500.00 |
| 84 | Mobilization (624E10000) | LS | 1 | $40,000 | $40,000 | $44,500 | $40,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 13, 2025. Compiled by Mirage Metrics.