Marucci & Gaffney Excavating Co submitted 85 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 31 of them (36%). When it was not low, its total sat a median +15% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $98,928,130
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 17 | 2 | 12% |
| 2021 | 15 | 8 | 53% |
| 2022 | 14 | 5 | 36% |
| 2023 | 11 | 5 | 45% |
| 2024 | 9 | 4 | 44% |
| 2025 | 11 | 3 | 27% |
| 2026 | 8 | 4 | 50% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| COL | 12 | 4 | 33% |
| District 4 | 9 | 2 | 22% |
| ATB | 9 | 3 | 33% |
| TRU | 8 | 2 | 25% |
| POR | 8 | 3 | 38% |
| GEA | 7 | 2 | 29% |
| MAH | 7 | 2 | 29% |
| BEL | 7 | 5 | 71% |
| JEF | 5 | 5 | 100% |
| SUM | 2 | 1 | 50% |
| District 12 | 2 | 0 | 0% |
| LAK | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 94 | 94 (100%) | $1.00 | $1.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 131 | 90 (69%) | $20.00 | $23.50 |
| Sign, flat sheet | 630E80100 | SF | 106 | 86 (81%) | $35.00 | $31.63 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 128 | 85 (66%) | $17.27 | $20.00 |
| Repair seeding and mulching | 659E14000 | SY | 53 | 46 (87%) | $0.27 | $1.25 |
| Treating concrete bridge decks with gravity fed resin | 512E73500 | SY | 94 | 45 (48%) | $10.20 | $11.00 |
| Water | 659E35000 | MGAL | 55 | 45 (82%) | $0.50 | $1.00 |
| Commercial fertilizer | 659E20000 | TON | 72 | 42 (58%) | $400.00 | $850.00 |
| Lime | 659E31000 | ACRE | 69 | 42 (61%) | $40.00 | $150.00 |
| Soil analysis test | 659E00100 | EACH | 40 | 37 (93%) | $10.00 | $115.50 |
| Asphalt concrete for maintaining traffic | 614E13000 | CY | 51 | 33 (65%) | $100.00 | $250.00 |
| Proof rolling | 204E45000 | HR | 38 | 33 (87%) | $100.00 | $219.05 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly & Sands Inc | 44 | 17 of 44 |
| Eclipse Co LLC | 35 | 11 of 35 |
| S E T Inc | 31 | 3 of 31 |
| Rudzik Excavating Inc | 23 | 6 of 23 |
| A P O'Horo Company | 15 | 13 of 15 |
| Karvo Companies Inc | 14 | 3 of 14 |
| Lockhart Concrete Co | 14 | 3 of 14 |
| Ruhlin Company | 13 | 3 of 13 |
| Great Lakes Construction Co | 11 | 3 of 11 |
| J D Williamson Construction Co Inc | 11 | 3 of 11 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260491 | BEL | BEL-SR 7-25.27 (SLIDE REPAIR) | 3 of 8 | $1,167,608 | +38% |
| 12 NOV 2026 | 260512 | TRU | TRU-SR 534-22.36/26.04 (BRIDGE REPAIR) | 2 of 5 | $1,637,017 | +1.0% |
| 01 OCT 2026 | 260419 | BEL | BEL-IR 70-19.19 (CULVERT REPLACEMENT) | 1 of 4 | $7,494,692 | Low, 17% under the second |
| 30 JUL 2026 | 260354 | MAH | MAH-US 224-17.72 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION) | 1 of 4 | $14,293,540 | Low, 4.0% under the second |
| 11 JUN 2026 | 260282 | ATB | ATB-/TRU-SR 7/VAR-18.62/VAR (PART 1, 2, 3) (BRIDGE REPAIR) | 2 of 4 | $3,899,665 | +2.0% |
| 07 MAY 2026 | 260242 | JEF | JEF-SR 7-13.95 (MISCELLANEOUS) | 1 of 3 | $5,873,591 | Low, 33% under the second |
| 15 JAN 2026 | 260019 | JEF | JEF-SR 213-04.51 (SLIDE REPAIR) | 1 of 8 | $1,423,293 | Low, 7.0% under the second |
| 15 JAN 2026 | 268000 | TRU | TRU-IR 80-11.32 Truck Parking (PARKING AREAS) | 5 of 7 | $5,143,875 | +9.0% |
| 23 OCT 2025 | 250490 | COL | COL-SR 164-01.66 (CULVERT REPLACEMENT) | 5 of 9 | $498,161 | +4.0% |
| 23 OCT 2025 | 250499 | JEF | JEF-SR 7-30.92 (CULVERT REPLACEMENT) | 1 of 6 | $1,467,579 | Low, 7.0% under the second |
| 09 OCT 2025 | 250467 | MAH | MAH-US 422-03.13 (BRIDGE REPAIR) | 4 of 4 | $2,925,364 | +40% |
| 25 SEP 2025 | 250441 | POR | POR-SR 305-02.43/02.58 (BRIDGE REPAIR) | 2 of 9 | $1,264,867 | +4.0% |
| 25 SEP 2025 | 250442 | TRU | TRU-W Reserve Greenway Phase 4 (BIKEWAYS) | 1 of 3 | $3,566,662 | Low, 10% under the second |
| 28 AUG 2025 | 250398 | TRU | TRU-SR 46-07.81 (PARTS 1-4) (INTERSECTION) | 6 of 6 | $8,138,316 | +31% |
| 17 JUL 2025 | 250339 | BEL | BEL-SR 149-02.11 (CULVERT REPLACEMENT) | 2 of 7 | $941,090 | +7.0% |
| 13 FEB 2025 | 250073 | GEA | GEA-US 322/SR 44-08.63/14.93 (CULVERT REPLACEMENT) | 2 of 5 | $1,648,594 | +16% |
| 13 FEB 2025 | 250091 | LAK | LAK-Metroparks Lakefront Phase 2 (SIDEWALK) | 1 of 2 | $1,197,820 | Low, 27% under the second |
| 16 JAN 2025 | 250006 | COL | COL-SR 170-20.03 (CULVERT REPLACEMENT) | 4 of 10 | $727,607 | +21% |
| 16 JAN 2025 | 250008 | District 4 | D04-BH/CR FY2025 (East) (CULVERT REPLACEMENT) | 2 of 4 | $2,087,919 | +2.0% |
| 14 NOV 2024 | 240492 | GEA | GEA-SR 87-12.13 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 2 of 5 | $1,631,515 | +8.0% |
| 14 NOV 2024 | 240493 | GEA | GEA-US 322-19.41 Replace (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 4 | $2,068,325 | Low, 15% under the second |
| 17 OCT 2024 | 240460 | BEL | BEL-SR 7-22.23 (BRIDGE REPAIR) | 1 of 2 | $3,047,476 | Low, 14% under the second |
| 12 SEP 2024 | 240419 | MAH | MAH-IR 680-09.30 Noise Walls (NOISE WALLS) | 3 of 7 | $4,266,134 | +7.0% |
| 11 JUL 2024 | 240361 | JEF | JEF-SR 7-31.03 (BRIDGE REPAIR) | 1 of 2 | $4,321,884 | Low, 8.0% under the second |
| 04 APR 2024 | 240205 | COL | COL-Market Street Bridge (BRIDGE REPLACEMENT (1 BRIDGE)) | 1 of 1 | $2,888,602 | Low |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.