ODOT contract 250442 bid tabulation
TRU-W Reserve Greenway Phase 4 (BIKEWAYS). Let by Ohio DOT on September 25, 2025, TRU. 3 bids received; low bid $3,566,662 by Marucci & Gaffney Excavating Co, -0.1% against the engineer's estimate of $3,571,000.
- Owner
- Ohio DOT
- Letting
- 25 SEP 2025
- Pay items
- 119
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Marucci & Gaffney Excavating Co | $3,566,662 | Low | 0.0% |
| 2 | Shelly & Sands Inc | $3,916,687 | +10% | +10% |
| 3 | S E T Inc | $4,085,000 | +15% | +14% |
Engineer's estimate: $3,571,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Marucci & Gaffney Excavating Co | 2. Shelly & Sands Inc | 3. S E T Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $75,000 | $281,000 | $50,000 |
| 2 | Headwall removed (202E20010) | EACH | 1 | $500.00 | $230.00 | $1,000.00 |
| 3 | Pavement removed (202E23000) | SY | 113 | $20.00 | $7.50 | $20.00 |
| 4 | Walk removed (202E30000) | SF | 139 | $15.00 | $4.00 | $4.00 |
| 5 | Concrete barrier removed (202E30700) | FT | 54 | $15.00 | $20.00 | $24.00 |
| 6 | Curb removed, as per plan (202E32001) | FT | 44 | $10.00 | $9.00 | $20.00 |
| 7 | Pipe removed, 24" and under (202E35100) | FT | 40 | $20.00 | $12.00 | $22.00 |
| 8 | Pipe removed, over 24" diameter (202E35200) | FT | 33 | $30.00 | $17.00 | $34.00 |
| 9 | Guardrail removed (202E38000) | FT | 16 | $7.00 | $30.00 | $14.00 |
| 10 | Special - pipe cleanout, 24" and under (202E70110) | FT | 250 | $5.00 | $24.00 | $30.00 |
| 11 | Special - pipe cleanout, 27" to 48" (202E70120) | FT | 250 | $5.00 | $35.00 | $50.00 |
| 12 | Fence removed, as per plan (202E75001) | FT | 206 | $3.00 | $15.00 | $6.00 |
| 13 | Gate removed, as per plan (202E75251) | EACH | 1 | $300.00 | $900.00 | $1,000.00 |
| 14 | Removal misc.: concrete barrier (202E98000) | LS | 1 | $1,000.00 | $900.00 | $3,000.00 |
| 15 | Removal misc.: cement pillar removed (202E98100) | EACH | 1 | $250.00 | $840.00 | $1,000.00 |
| 16 | Removal misc.: concrete block removed (202E98100) | EACH | 1 | $250.00 | $400.00 | $600.00 |
| 17 | Removal misc.: concrete pad removed (202E98100) | EACH | 2 | $500.00 | $1,400.00 | $700.00 |
| 18 | Removal misc.: pole removed (202E98100) | EACH | 3 | $250.00 | $1,020.00 | $500.00 |
| 19 | Removal misc.: post removed (202E98100) | EACH | 4 | $100.00 | $100.00 | $300.00 |
| 20 | Excavation (203E10000) | CY | 5,610 | $24.64 | $14.00 | $25.00 |
| 21 | Embankment (203E20000) | CY | 11,198 | $32.90 | $25.00 | $22.00 |
| 22 | Embankment, as per plan (203E20001) | CY | 50 | $20.00 | $65.00 | $60.00 |
| 23 | Subgrade compaction (204E10000) | SY | 21,748 | $1.50 | $2.50 | $2.00 |
| 24 | Excavation of subgrade (204E13000) | CY | 8,503 | $24.64 | $28.00 | $25.00 |
| 25 | Granular material, type B (204E30010) | CY | 8,503 | $33.00 | $65.00 | $70.00 |
| 26 | Proof rolling (204E45000) | HR | 7 | $100.00 | $270.00 | $200.00 |
| 27 | Geotextile fabric (204E50000) | SY | 18,385 | $3.00 | $0.70 | $2.00 |
| 28 | Geogrid (204E51000) | SY | 22,385 | $3.00 | $0.75 | $2.00 |
| 29 | Fence, misc.: wood fence (607E98000) | FT | 3,227 | $95.00 | $95.00 | $92.00 |
| 30 | 4" concrete walk (608E10000) | SF | 2,249 | $8.65 | $10.00 | $9.00 |
| 31 | 4" concrete walk, as per plan (608E10001) | SF | 1,000 | $7.00 | $13.50 | $12.00 |
| 32 | 6" concrete walk (608E13000) | SF | 91 | $9.00 | $15.00 | $11.00 |
| 33 | 8" concrete walk (608E15000) | SF | 225 | $11.50 | $15.00 | $12.00 |
| 34 | Curb ramp, as per plan (608E52001) | SF | 1,721 | $30.00 | $35.00 | $32.00 |
| 35 | Detectable warning (608E53020) | SF | 122 | $40.00 | $35.00 | $45.00 |
| 36 | Reference monument, type A (623E40500) | EACH | 7 | $500.00 | $250.00 | $1,100.00 |
| 37 | Right-of-way monument, type B (623E40520) | EACH | 1 | $500.00 | $1,000.00 | $500.00 |
| 38 | Special - bollard (690E50600) | EACH | 8 | $500.00 | $500.00 | $1,100.00 |
| 39 | Special - as-built construction plans (690E91000) | LS | 1 | $5,000.00 | $7,200.00 | $12,000 |
| 40 | Special - preconstruction video taping (690E98400) | LS | 1 | $2,500.00 | $2,900.00 | $2,000.00 |
| 41 | Special - survey control verification (690E98400) | LS | 1 | $1,000.00 | $3,000.00 | $5,500.00 |
| 42 | Rock channel protection, type C with geotextile fabric (601E32204) | CY | 35 | $150.00 | $250.00 | $150.00 |
| 43 | Soil analysis test (659E00100) | EACH | 2 | $50.00 | $135.00 | $150.00 |
| 44 | Topsoil (659E00300) | CY | 4,753 | $30.00 | $9.00 | $70.00 |
| 45 | Seeding and mulching (659E10000) | SY | 42,824 | $1.55 | $1.00 | $1.25 |
| 46 | Repair seeding and mulching (659E14000) | SY | 2,141 | $0.10 | $0.90 | $1.00 |
| 47 | Inter-seeding (659E15000) | SY | 2,141 | $0.10 | $0.80 | $1.00 |
| 48 | Commercial fertilizer (659E20000) | TON | 9.63 | $250.00 | $700.00 | $800.00 |
| 49 | Lime (659E31000) | ACRE | 8.85 | $40.00 | $160.00 | $200.00 |
| 50 | Water (659E35000) | MGAL | 347 | $0.01 | $1.00 | $2.00 |
| 51 | Slope erosion protection (670E00500) | SY | 8,601 | $1.50 | $1.50 | $2.00 |
| 52 | Storm water pollution prevention plan (832E15000) | LS | 1 | $3,000.00 | $3,000.00 | $4,504.00 |
| 53 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $7,000.00 | $13,300 | $13,000 |
| 54 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $12,000 | $12,000 | $18,000 |
| 55 | Erosion control (832E30000) | EACH | 174,400 | $1.00 | $1.00 | $1.00 |
| 56 | Concrete masonry (602E20000) | CY | 21.30 | $1,800.00 | $2,100.00 | $1,800.00 |
| 57 | 12" conduit, type C (611E04600) | FT | 298 | $70.00 | $80.00 | $90.00 |
| 58 | 12" conduit, type D (611E04900) | FT | 209 | $85.00 | $80.00 | $85.00 |
| 59 | 15" conduit, type C (611E06100) | FT | 19 | $150.00 | $135.00 | $135.00 |
| 60 | 15" conduit, type D (611E06400) | FT | 220 | $95.00 | $82.00 | $90.00 |
| 61 | 18" conduit, type C (611E07600) | FT | 35 | $80.00 | $110.00 | $115.00 |
| 62 | 18" conduit, type D (611E07900) | FT | 88 | $95.00 | $105.00 | $105.00 |
| 63 | 24" conduit, type C (611E10600) | FT | 5 | $250.00 | $500.00 | $325.00 |
| 64 | 24" conduit, type D (611E10900) | FT | 25 | $130.00 | $140.00 | $150.00 |
| 65 | 24" conduit, type D (611E10900) | FT | 47 | $155.00 | $150.00 | $165.00 |
| 66 | 36" conduit, type A (611E16200) | FT | 54 | $160.00 | $170.00 | $255.00 |
| 67 | 36" conduit, type C (611E16600) | FT | 5 | $300.00 | $350.00 | $400.00 |
| 68 | 36" conduit, type D (611E16900) | FT | 96 | $160.00 | $158.00 | $195.00 |
| 69 | 42" conduit, type A (611E19200) | FT | 28 | $230.00 | $230.00 | $330.00 |
| 70 | Conduit, misc.: type C for drainage discharge con (611E97400) | FT | 50 | $5.00 | $44.00 | $105.00 |
| 71 | Conduit, misc.: type E for drainage discharge con (611E97400) | FT | 50 | $5.00 | $44.00 | $95.00 |
| 72 | Conduit, misc.: type F for drainage discharge con (611E97400) | FT | 50 | $5.00 | $44.00 | $95.00 |
| 73 | Catch basin, no. 2-2B (611E98470) | EACH | 1 | $2,700.00 | $2,900.00 | $3,000.00 |
| 74 | Catch basin, no. 2-4 (611E98540) | EACH | 1 | $3,800.00 | $4,200.00 | $4,000.00 |
| 75 | Catch basin adjusted to grade (611E98630) | EACH | 1 | $500.00 | $1,150.00 | $1,000.00 |
| 76 | Catch basin grate (611E98644) | EACH | 12 | $300.00 | $300.00 | $1,000.00 |
| 77 | Manhole, no. 3 (611E99574) | EACH | 3 | $5,850.00 | $5,300.00 | $6,000.00 |
| 78 | Manhole, no. 3 (611E99574) | EACH | 1 | $7,500.00 | $7,500.00 | $8,000.00 |
| 79 | Full depth pavement sawing (252E01500) | FT | 108 | $5.00 | $7.00 | $15.00 |
| 80 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 58 | $345.00 | $345.00 | $350.00 |
| 81 | Aggregate base (304E20000) | CY | 4,042 | $82.00 | $82.00 | $70.00 |
| 82 | Tack coat (407E10000) | GAL | 928 | $3.05 | $3.05 | $4.00 |
| 83 | Prime coat (408E10000) | GAL | 7,194 | $3.50 | $3.50 | $4.00 |
| 84 | Asphalt concrete surface course, type 1, (448), as per plan (441E50101) | CY | 577 | $308.20 | $277.00 | $285.00 |
| 85 | Asphalt concrete intermediate course, type 2, (448) (441E50300) | CY | 808 | $225.40 | $215.00 | $220.00 |
| 86 | 8" non-reinforced concrete pavement, class QC 1P (452E12010) | SY | 84 | $95.00 | $90.00 | $110.00 |
| 87 | Curb, type 6 (609E26000) | FT | 44 | $50.00 | $40.00 | $50.00 |
| 88 | Delineator, post ground mounted, as per plan (620E00501) | EACH | 4 | $200.00 | $205.00 | $300.00 |
| 89 | Ground mounted support, no. 2 post (630E02100) | FT | 358.40 | $17.50 | $18.00 | $20.00 |
| 90 | Ground mounted support, no. 3 post (630E03100) | FT | 112 | $18.50 | $19.00 | $20.00 |
| 91 | Sign, flat sheet (630E80100) | SF | 216.60 | $32.00 | $33.00 | $40.00 |
| 92 | Removal of ground mounted sign and disposal (630E84900) | EACH | 3 | $10.00 | $25.00 | $25.00 |
| 93 | Removal of ground mounted post support and disposal (630E86002) | EACH | 3 | $10.00 | $25.00 | $25.00 |
| 94 | Signing, misc.: 4" X 4" solid wood post (630E97900) | FT | 108 | $25.00 | $25.00 | $40.00 |
| 95 | Edge line, 4" (644E00100) | MI | 0.02 | $5,355.00 | $5,500.00 | $20,000 |
| 96 | Crosswalk line, 24", as per plan (644E00631) | FT | 110 | $10.55 | $11.00 | $15.00 |
| 97 | Shared lane marking (644E19000) | EACH | 6 | $660.00 | $700.00 | $500.00 |
| 98 | Water (616E10000) | MGAL | 50 | $0.01 | $80.00 | $50.00 |
| 99 | Portable barrier, unanchored (622E41100) | FT | 50 | $80.00 | $120.00 | $125.00 |
| 100 | Special - work involving hazardous waste (690E65002) | TON | 25 | $150.00 | $200.00 | $100.00 |
| 101 | Special - work involving solid waste (690E65010) | TON | 25 | $250.00 | $175.00 | $100.00 |
| 102 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $15,000 | $32,000 | $10,000 |
| 103 | Unclassified excavation (503E21100) | CY | 58 | $75.00 | $33.00 | $115.00 |
| 104 | Epoxy coated steel reinforcement (509E10000) | LB | 4,320 | $2.00 | $2.00 | $3.00 |
| 105 | Dowel holes with nonshrink, nonmetallic grout (510E10000) | EACH | 22 | $75.00 | $60.00 | $40.00 |
| 106 | Class QC1 concrete, retaining/wingwall including footing, as per plan (511E46211) | CY | 40 | $1,890.00 | $2,300.00 | $1,400.00 |
| 107 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 25 | $40.00 | $75.00 | $45.00 |
| 108 | Type 2 waterproofing (512E33000) | SY | 112 | $40.00 | $37.00 | $35.00 |
| 109 | 1" preformed expansion joint filler (516E13600) | SF | 22 | $20.00 | $6.00 | $15.00 |
| 110 | Porous backfill with geotextile fabric (518E21200) | CY | 9 | $175.00 | $285.00 | $150.00 |
| 111 | Rock channel protection, type C with filter (601E32200) | CY | 8 | $150.00 | $240.00 | $200.00 |
| 112 | 7' X 7' conduit, type A, 706.05, as per plan (611E94733) | FT | 26 | $1,775.00 | $1,500.00 | $2,800.00 |
| 113 | Railing, timber, as per plan (517E74001) | FT | 447 | $95.00 | $95.00 | $100.00 |
| 114 | Vandal protection fence, 12' curved, coated fabric, as per plan (607E39931) | FT | 363 | $243.00 | $195.00 | $250.00 |
| 115 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $30,000 | $21,500 | $35,000 |
| 116 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $29,000 | $48,000 | $80,000 |
| 117 | Field office, type B (619E16010) | MNTH | 14 | $1,000.00 | $3,600.00 | $1,500.00 |
| 118 | Construction layout stakes and surveying (623E10000) | LS | 1 | $43,000 | $24,000 | $50,000 |
| 119 | Mobilization (624E10000) | LS | 1 | $100,000 | $195,000 | $150,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 25, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.