ODOT contract 260354 bid tabulation
MAH-US 224-17.72 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION). Let by Ohio DOT on July 30, 2026, MAH. 4 bids received; low bid $14,293,540 by Marucci & Gaffney Excavating Co, +11% against the engineer's estimate of $12,881,000.
- Owner
- Ohio DOT
- Letting
- 30 JUL 2026
- Pay items
- 240
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Marucci & Gaffney Excavating Co | $14,293,540 | Low | +11% |
| 2 | Karvo Companies Inc | $14,804,327 | +4.0% | +15% |
| 3 | S E T Inc | $15,490,000 | +8.0% | +20% |
| 4 | Shelly & Sands Inc | $16,568,986 | +16% | +29% |
Engineer's estimate: $12,881,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Marucci & Gaffney Excavating Co | 2. Karvo Companies Inc | 3. S E T Inc | 4. Shelly & Sands Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $150,000 | $25,000 | $100,000 | $30,000 |
| 2 | Pavement removed (202E23000) | SY | 11,511 | $17.00 | $15.00 | $28.00 | $25.00 |
| 3 | Walk removed (202E30000) | SF | 18,493 | $2.00 | $2.00 | $3.50 | $2.00 |
| 4 | Concrete median removed (202E30600) | SY | 96 | $18.00 | $85.00 | $21.00 | $30.00 |
| 5 | Traffic island removed (202E30800) | SY | 311 | $30.00 | $40.00 | $26.00 | $30.00 |
| 6 | Curb removed (202E32000) | FT | 4,832 | $3.00 | $25.00 | $7.00 | $15.00 |
| 7 | Curb removed, as per plan (202E32001) | FT | 644 | $10.00 | $20.00 | $17.00 | $5.00 |
| 8 | Curb and gutter removed (202E32500) | FT | 8,902 | $4.50 | $20.00 | $10.00 | $15.00 |
| 9 | Pipe removed, 24" and under (202E35100) | FT | 562 | $40.00 | $50.00 | $20.00 | $30.00 |
| 10 | Guardrail removed (202E38000) | FT | 41 | $6.00 | $5.00 | $6.00 | $5.35 |
| 11 | Catch basin removed (202E58100) | EACH | 22 | $500.00 | $1,000.00 | $750.00 | $750.00 |
| 12 | Excavation (203E10000) | CY | 9,661 | $25.00 | $30.00 | $40.00 | $60.00 |
| 13 | Embankment (203E20000) | CY | 2,513 | $35.00 | $30.00 | $25.00 | $40.00 |
| 14 | Subgrade compaction (204E10000) | SY | 17,028 | $2.00 | $1.00 | $2.00 | $5.00 |
| 15 | Excavation of subgrade (204E13000) | CY | 1,207 | $30.00 | $25.00 | $30.00 | $45.00 |
| 16 | Granular material, type B (204E30010) | CY | 1,207 | $80.00 | $65.00 | $80.00 | $135.00 |
| 17 | Proof rolling (204E45000) | HR | 4 | $125.00 | $500.00 | $250.00 | $400.00 |
| 18 | Geotextile fabric (204E50000) | SY | 3,623 | $2.10 | $2.00 | $2.00 | $1.20 |
| 19 | Steel sheet piling left in place, as per plan (504E11101) | SF | 2,713 | $5.00 | $10.00 | $20.00 | $15.00 |
| 20 | Steel sheet piling left in place, as per plan (504E11101) | SF | 2,713 | $25.00 | $28.00 | $25.00 | $40.00 |
| 21 | Guardrail, type MGS (606E15050) | FT | 50 | $70.00 | $59.00 | $65.00 | $63.00 |
| 22 | Anchor assembly, MGS type E (606E26150) | EACH | 1 | $4,500.00 | $3,780.00 | $4,000.00 | $4,000.00 |
| 23 | Fence, misc.:construction fence (607E98000) | FT | 450 | $17.00 | $6.90 | $6.00 | $8.00 |
| 24 | 4" concrete walk (608E10000) | SF | 58,068 | $13.50 | $12.00 | $9.00 | $10.20 |
| 25 | Curb ramp (608E52000) | SF | 3,472 | $20.00 | $20.00 | $27.00 | $33.50 |
| 26 | Special - as-built construction plans (690E91000) | LS | 1 | $10,000 | $20,000 | $22,000 | $25,000 |
| 27 | Special - survey control verification (690E98400) | LS | 1 | $10,000 | $15,000 | $20,000 | $5,000.00 |
| 28 | Soil analysis test (659E00100) | EACH | 2 | $10.00 | $600.00 | $150.00 | $25.00 |
| 29 | Topsoil (659E00300) | CY | 1,013 | $50.00 | $69.00 | $80.00 | $140.00 |
| 30 | Seeding and mulching (659E10000) | SY | 9,060 | $2.50 | $1.40 | $3.00 | $1.25 |
| 31 | Repair seeding and mulching (659E14000) | SY | 453 | $1.00 | $2.00 | $2.00 | $1.25 |
| 32 | Inter-seeding (659E15000) | SY | 453 | $1.00 | $1.00 | $1.00 | $0.25 |
| 33 | Commercial fertilizer (659E20000) | TON | 1.23 | $750.00 | $1,500.00 | $900.00 | $250.00 |
| 34 | Lime (659E31000) | ACRE | 1.88 | $275.00 | $0.05 | $225.00 | $25.00 |
| 35 | Water (659E35000) | MGAL | 49 | $1.00 | $60.00 | $10.00 | $1.00 |
| 36 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,000.00 | $15,000 | $5,500.00 | $6,000.00 |
| 37 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $31,000 | $30,000 | $25,000 | $30,000 |
| 38 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $21,000 | $25,000 | $32,000 | $25,000 |
| 39 | Erosion control (832E30000) | EACH | 85,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 40 | Removal misc.: inspection well (202E98100) | EACH | 1 | $10.00 | $1,000.00 | $700.00 | $400.00 |
| 41 | Removal misc.: conduit (202E98200) | FT | 100 | $20.00 | $200.00 | $25.00 | $15.00 |
| 42 | Tied concrete block mat with type 1 underlayment (601E21050) | SY | 6 | $175.00 | $350.00 | $200.00 | $320.00 |
| 43 | 4" unclassified pipe underdrains (605E05200) | FT | 15 | $40.00 | $85.00 | $30.00 | $30.00 |
| 44 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 15,032 | $16.00 | $18.00 | $20.00 | $35.00 |
| 45 | 4" conduit, type F (611E00406) | FT | 30 | $30.00 | $50.00 | $30.00 | $31.00 |
| 46 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 719 | $23.00 | $25.00 | $25.00 | $47.00 |
| 47 | 6" conduit, type B (611E00900) | FT | 10 | $60.00 | $75.00 | $40.00 | $150.00 |
| 48 | 12" conduit, type B (611E04400) | FT | 1,315 | $150.00 | $185.00 | $120.00 | $200.00 |
| 49 | 12" conduit, type C (611E04600) | FT | 39 | $200.00 | $155.00 | $105.00 | $170.00 |
| 50 | 15" conduit, type B (611E05900) | FT | 389 | $152.00 | $155.00 | $130.00 | $200.00 |
| 51 | 18" conduit, type B (611E07400) | FT | 15 | $600.00 | $275.00 | $210.00 | $400.00 |
| 52 | 24" conduit, type B (611E10400) | FT | 5 | $825.00 | $800.00 | $320.00 | $600.00 |
| 53 | Conduit, misc.: type B for drainage discharge cont (611E97400) | FT | 100 | $10.00 | $5.00 | $120.00 | $55.00 |
| 54 | Conduit, misc.: type C for drainage discharge cont (611E97400) | FT | 100 | $10.00 | $10.00 | $105.00 | $58.00 |
| 55 | Conduit, misc.: type F for drainage discharge cont (611E97400) | FT | 100 | $10.00 | $15.00 | $95.00 | $42.00 |
| 56 | Catch basin, no. 3 (611E98150) | EACH | 15 | $5,200.00 | $5,000.00 | $4,500.00 | $7,500.00 |
| 57 | Catch basin, no. 3, as per plan (611E98151) | EACH | 1 | $5,700.00 | $5,500.00 | $5,500.00 | $8,000.00 |
| 58 | Catch basin, no. 3A (611E98180) | EACH | 23 | $3,700.00 | $5,000.00 | $3,500.00 | $7,500.00 |
| 59 | Catch basin, no. 2-2B (611E98470) | EACH | 2 | $3,000.00 | $3,500.00 | $3,200.00 | $6,000.00 |
| 60 | Catch basin adjusted to grade (611E98630) | EACH | 3 | $1,250.00 | $1,000.00 | $1,500.00 | $1,500.00 |
| 61 | Inlet, no. 2-6 (611E98710) | EACH | 1 | $12,000 | $7,500.00 | $8,500.00 | $15,000 |
| 62 | Manhole, no. 3 (611E99574) | EACH | 25 | $7,900.00 | $7,500.00 | $5,800.00 | $8,000.00 |
| 63 | Manhole adjusted to grade (611E99654) | EACH | 14 | $1,300.00 | $1,800.00 | $1,800.00 | $1,500.00 |
| 64 | Precast reinforced concrete outlet (611E99710) | EACH | 3 | $550.00 | $150.00 | $400.00 | $700.00 |
| 65 | Inspection well (611E99720) | EACH | 1 | $100.00 | $1,000.00 | $1,200.00 | $1,500.00 |
| 66 | Special - miscellaneous metal (611E99820) | LB | 400 | $3.00 | $2.50 | $7.00 | $2.20 |
| 67 | Partial depth pavement repair (441) (251E01000) | SY | 2,000 | $45.00 | $25.00 | $90.00 | $45.00 |
| 68 | Pavement planing, asphalt concrete, T=1.25" (254E01000) | SY | 80,017 | $2.50 | $1.25 | $2.50 | $2.30 |
| 69 | Pavement planing, asphalt concrete, T=1.5" (254E01000) | SY | 23,158 | $3.00 | $3.00 | $4.00 | $3.00 |
| 70 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 2,956 | $310.00 | $275.00 | $255.00 | $300.00 |
| 71 | Asphalt concrete base, PG64-22, (449), (driveways) (301E56100) | CY | 274 | $310.00 | $300.00 | $265.00 | $300.00 |
| 72 | Aggregate base (304E20000) | CY | 3,073 | $115.00 | $100.00 | $85.00 | $150.00 |
| 73 | Tack coat (407E10000) | GAL | 113 | $3.05 | $3.50 | $4.00 | $3.05 |
| 74 | Non-tracking tack coat (407E20000) | GAL | 10,632 | $3.05 | $3.50 | $3.00 | $3.05 |
| 75 | Fine graded polymer asphalt concrete, type B, (448) (424E14000) | CY | 3,290 | $272.00 | $325.00 | $345.00 | $270.00 |
| 76 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 53 | $700.00 | $500.00 | $460.00 | $700.00 |
| 77 | Asphalt concrete intermediate course, 12.5 MM, type A (448) (442E20170) | CY | 570 | $322.00 | $325.00 | $285.00 | $322.00 |
| 78 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 437 | $370.00 | $350.00 | $375.00 | $370.00 |
| 79 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 245 | $322.00 | $450.00 | $365.00 | $322.00 |
| 80 | 4" non-reinforced concrete pavement, class QC 1P (452E09010) | SY | 2,331 | $80.00 | $60.00 | $95.00 | $73.30 |
| 82 | 8" non-reinforced concrete pavement, class QC MS (452E12050) | SY | 617 | $128.00 | $120.00 | $125.00 | $147.00 |
| 83 | Combination curb and gutter, type 2 (609E12000) | FT | 7,643 | $38.00 | $35.00 | $40.00 | $33.50 |
| 84 | Curb, type 4-C (609E24510) | FT | 4,318 | $25.00 | $25.00 | $22.00 | $24.50 |
| 85 | Curb, type 6 (609E26000) | FT | 6,470 | $29.00 | $25.00 | $24.00 | $26.50 |
| 86 | Curb, type 7 (609E28000) | FT | 215 | $50.00 | $60.00 | $26.00 | $67.50 |
| 87 | Special - pavement overlay fabric composite (690E12060) | SY | 2,580 | $34.00 | $39.00 | $36.00 | $32.75 |
| 88 | 6" water main polyvinyl chloride pipe and fittings, ASTM SDR 21 (638E00990) | FT | 188 | $105.00 | $150.00 | $175.00 | $120.00 |
| 89 | 6" gate valve (638E07480) | EACH | 3 | $2,500.00 | $2,000.00 | $2,200.00 | $2,000.00 |
| 90 | 6" gate valve and valve box (638E07800) | EACH | 3 | $3,000.00 | $2,200.00 | $2,800.00 | $2,300.00 |
| 91 | 8" X 6" tapping sleeve, valve and valve box (638E09390) | EACH | 3 | $5,000.00 | $8,500.00 | $4,000.00 | $6,000.00 |
| 92 | 6" fire hydrant (638E10200) | EACH | 3 | $7,000.00 | $7,500.00 | $7,000.00 | $12,000 |
| 93 | RPM (621E00100) | EACH | 1,066 | $40.50 | $37.50 | $55.00 | $45.00 |
| 94 | Ground mounted support, no. 2 post (630E02100) | FT | 183.50 | $16.00 | $15.00 | $16.00 | $16.00 |
| 95 | Ground mounted support, no. 3 post (630E03100) | FT | 951.80 | $17.00 | $15.00 | $17.00 | $17.00 |
| 96 | Ground mounted support, no. 3 post, as per plan (630E03101) | FT | 231 | $18.00 | $14.25 | $17.00 | $17.00 |
| 97 | Sign post reflector (630E08600) | EACH | 12 | $48.00 | $40.00 | $50.00 | $48.00 |
| 98 | Sign post reflector (630E08600) | EACH | 66 | $48.00 | $40.00 | $50.00 | $48.00 |
| 99 | Sign post reflector (630E08600) | EACH | 4 | $48.00 | $40.00 | $50.00 | $48.00 |
| 100 | Overhead sign support, type TC-15.116, design 1 (630E72410) | EACH | 1 | $80,000 | $79,450 | $80,000 | $81,000 |
| 101 | Overhead sign support, type TC-16.22, design 12 (630E72540) | EACH | 2 | $20,000 | $19,750 | $21,000 | $21,000 |
| 102 | Overhead sign support, type TC-16.22, design 13 (630E72550) | EACH | 8 | $27,000 | $26,950 | $28,000 | $28,000 |
| 103 | Overhead sign support, type TC-16.22, design 14 (630E72560) | EACH | 3 | $28,500 | $28,200 | $30,000 | $30,000 |
| 104 | Span wire sign support, type TC-17.11, design 8 (630E76520) | EACH | 1 | $23,000 | $22,450 | $24,000 | $24,000 |
| 105 | Sign hanger assembly, span wire (630E79000) | EACH | 10 | $500.00 | $400.00 | $515.00 | $530.00 |
| 106 | Sign hanger assembly, mast arm (630E79100) | EACH | 110 | $580.00 | $500.00 | $575.00 | $590.00 |
| 107 | Sign support assembly, pole mounted (630E79500) | EACH | 14 | $260.00 | $125.00 | $250.00 | $260.00 |
| 108 | Sign, flat sheet (630E80100) | SF | 1,591.20 | $21.00 | $27.50 | $22.00 | $21.00 |
| 109 | Sign, overhead extrusheet (630E80224) | SF | 64 | $30.00 | $112.39 | $30.00 | $31.00 |
| 110 | Rigid overhead sign support foundation (630E84510) | EACH | 15 | $9,000.00 | $8,820.00 | $9,200.00 | $9,400.00 |
| 111 | Span wire sign support foundation (630E84520) | EACH | 2 | $6,500.00 | $6,420.00 | $6,700.00 | $6,800.00 |
| 112 | Removal of ground mounted sign and disposal (630E84900) | EACH | 82 | $16.00 | $15.00 | $16.00 | $16.00 |
| 113 | Removal of ground mounted sign and reerection (630E85100) | EACH | 32 | $75.00 | $125.00 | $75.00 | $75.00 |
| 114 | Removal of ground mounted post support and disposal (630E86002) | EACH | 75 | $21.00 | $15.00 | $25.00 | $21.00 |
| 115 | Removal of overhead mounted sign and disposal (630E87400) | EACH | 58 | $100.00 | $150.00 | $100.00 | $100.00 |
| 116 | Removal of pole mounted sign and disposal (630E87500) | EACH | 15 | $47.00 | $25.00 | $50.00 | $48.00 |
| 117 | Removal of overhead sign support and disposal (630E89702) | EACH | 16 | $2,600.00 | $2,530.00 | $2,700.00 | $2,700.00 |
| 118 | Signing, misc.:, 12" PVC pipe (630E97700) | EACH | 22 | $100.00 | $50.00 | $55.00 | $377.00 |
| 119 | Edge line, 6" (646E10010) | MI | 1.28 | $3,768.00 | $3,768.00 | $4,000.00 | $4,000.00 |
| 120 | Lane line, 6" (646E10110) | MI | 7.05 | $2,250.00 | $2,250.00 | $2,400.00 | $2,400.00 |
| 121 | Center line (646E10200) | MI | 3.20 | $4,628.00 | $4,628.00 | $5,000.00 | $4,900.00 |
| 122 | Channelizing line, 12" (646E10310) | FT | 12,571 | $1.45 | $1.45 | $1.50 | $1.50 |
| 123 | Stop line (646E10400) | FT | 1,190 | $13.00 | $13.00 | $14.00 | $14.00 |
| 124 | Crosswalk line, 24" (646E10520) | FT | 1,715 | $13.00 | $13.00 | $14.00 | $14.00 |
| 125 | Transverse/diagonal line (646E10600) | FT | 2,555 | $10.00 | $10.00 | $11.00 | $11.00 |
| 126 | Island marking (646E10800) | SF | 114 | $9.00 | $9.00 | $10.00 | $9.00 |
| 127 | Railroad symbol marking (646E20000) | EACH | 6 | $60.00 | $600.00 | $650.00 | $640.00 |
| 128 | Lane arrow (646E20300) | EACH | 152 | $150.00 | $150.00 | $175.00 | $160.00 |
| 129 | Dotted line, 6" (646E20504) | FT | 3,085 | $1.50 | $1.50 | $1.75 | $1.60 |
| 130 | Pavement marking, misc.: U-turn lane arrow (646E98000) | EACH | 8 | $300.00 | $300.00 | $325.00 | $320.00 |
| 131 | Bracket arm, 15' (625E18200) | EACH | 17 | $1,428.36 | $1,350.00 | $1,000.00 | $1,440.00 |
| 132 | No. 10 AWG pole and bracket cable (625E23400) | FT | 765 | $1.85 | $1.75 | $3.25 | $1.90 |
| 133 | Conduit, 2", 725.04 (625E25400) | FT | 24 | $21.16 | $20.00 | $40.00 | $22.00 |
| 134 | Conduit, 3", 725.04 (625E25500) | FT | 961 | $37.03 | $35.00 | $40.00 | $37.00 |
| 135 | Conduit, 4", 725.04 (625E25600) | FT | 46 | $47.61 | $45.00 | $65.00 | $52.00 |
| 136 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 2,065 | $79.35 | $75.00 | $85.00 | $78.00 |
| 137 | Luminaire, conventional, solid state (LED), 7000- (625E26252) | EACH | 17 | $634.83 | $600.00 | $650.00 | $590.00 |
| 138 | Trench (625E29000) | FT | 916 | $10.58 | $10.00 | $20.00 | $13.00 |
| 139 | Pull box, 725.08, 18" (625E30700) | EACH | 20 | $1,269.65 | $1,200.00 | $950.00 | $1,400.00 |
| 140 | Pull box, 725.08, 24" (625E30706) | EACH | 14 | $1,587.06 | $1,500.00 | $1,100.00 | $1,600.00 |
| 141 | Ground rod (625E32000) | EACH | 61 | $211.61 | $200.00 | $250.00 | $306.00 |
| 142 | Underground warning/marking tape, as per plan (625E36011) | FT | 1,002 | $0.53 | $0.50 | $1.00 | $0.50 |
| 143 | Vehicular signal head, optically programmed, 3 section, 12" lens, 1-way (632E03200) | EACH | 3 | $6,877.27 | $6,500.00 | $7,800.00 | $5,400.00 |
| 144 | Vehicular signal head, optically programmed, 5 section, 12" lens, 1-way (632E03204) | EACH | 1 | $11,638 | $11,000 | $13,500 | $7,200.00 |
| 145 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 75 | $1,110.94 | $1,050.00 | $1,250.00 | $1,300.00 |
| 146 | Vehicular signal head, (LED), 5-section, 12" lens, 1-way, polycarbonate (632E05086) | EACH | 22 | $1,692.87 | $1,600.00 | $2,000.00 | $2,100.00 |
| 147 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 32 | $687.73 | $650.00 | $550.00 | $790.00 |
| 148 | Covering of vehicular signal head (632E25000) | EACH | 101 | $10.58 | $10.00 | $60.00 | $50.00 |
| 149 | Covering of pedestrian signal head (632E25010) | EACH | 32 | $10.58 | $10.00 | $45.00 | $48.00 |
| 150 | Pedestrian pushbutton, as per plan (632E26001) | EACH | 32 | $317.41 | $300.00 | $275.00 | $310.00 |
| 151 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 11,510 | $3.70 | $3.50 | $2.75 | $3.50 |
| 152 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 13,218 | $4.23 | $4.00 | $3.25 | $4.00 |
| 153 | Signal support foundation, as per plan (632E64011) | EACH | 29 | $8,993.36 | $8,500.00 | $8,500.00 | $9,200.00 |
| 154 | Pedestal foundation (632E64020) | EACH | 20 | $1,587.06 | $1,500.00 | $1,100.00 | $1,600.00 |
| 155 | Test hole performed (632E64950) | EACH | 29 | $1,058.04 | $1,000.00 | $300.00 | $1,400.00 |
| 156 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 35 | $6.35 | $6.00 | $10.00 | $7.00 |
| 157 | Service cable, 2 conductor, no. 4 AWG (632E69600) | FT | 17 | $6.35 | $6.00 | $20.00 | $9.00 |
| 158 | Power service, as per plan (632E70001) | EACH | 7 | $3,174.13 | $3,000.00 | $3,700.00 | $4,100.00 |
| 159 | Signal support, type TC-81.22, design 4 (632E72110) | EACH | 1 | $12,697 | $12,000 | $16,000 | $13,000 |
| 160 | Signal support, type TC-81.22, design 12 (632E72130) | EACH | 1 | $15,342 | $14,500 | $20,000 | $15,000 |
| 161 | Signal support, type TC-81.22, design 13 (632E72140) | EACH | 6 | $18,093 | $17,100 | $23,000 | $24,000 |
| 162 | Signal support, type TC-81.22, design 14 (632E72150) | EACH | 3 | $20,103 | $19,000 | $26,000 | $25,000 |
| 163 | Combination signal support, type TC-81.22, design 4 (632E79110) | EACH | 7 | $13,755 | $13,000 | $16,000 | $13,000 |
| 164 | Combination signal support, type TC-81.22, design 12 (632E79130) | EACH | 1 | $16,400 | $15,500 | $21,000 | $16,000 |
| 165 | Combination signal support, type TC-81.22, design 13 (632E79140) | EACH | 5 | $20,367 | $19,250 | $25,000 | $21,000 |
| 166 | Combination signal support, type TC-81.22, design 14 (632E79150) | EACH | 4 | $21,690 | $20,500 | $27,000 | $23,000 |
| 167 | Pedestal, 10.7' tall, transformer base (632E89920) | EACH | 19 | $2,645.10 | $2,500.00 | $1,800.00 | $3,400.00 |
| 168 | Pedestal, 14.4' tall, transformer base (632E89930) | EACH | 1 | $2,750.91 | $2,600.00 | $2,000.00 | $4,500.00 |
| 169 | Removal of traffic signal installation, as per plan (632E90101) | EACH | 8 | $5,290.21 | $5,000.00 | $5,000.00 | $3,200.00 |
| 170 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 7 | $17,987 | $17,000 | $21,000 | $21,000 |
| 171 | Cabinet foundation, as per plan (633E67101) | EACH | 7 | $2,645.10 | $2,500.00 | $2,600.00 | $3,200.00 |
| 172 | Controller work pad, as per plan (633E67201) | EACH | 7 | $1,587.06 | $1,500.00 | $525.00 | $4,200.00 |
| 173 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 7 | $6,877.27 | $6,500.00 | $7,300.00 | $7,500.00 |
| 174 | Special -railroad blankout cable, 7 conductor, no. (690E98100) | FT | 278 | $4.23 | $4.00 | $4.00 | $13.00 |
| 175 | Special -railroad preempt cable, conductor, no. 14 (690E98100) | FT | 117 | $4.23 | $4.00 | $3.00 | $15.00 |
| 176 | ITS device, misc.: reuse communications device (809E65990) | EACH | 6 | $1,058.04 | $1,000.00 | $950.00 | $4,000.00 |
| 177 | Advance radar detection, as per plan (809E69001) | EACH | 20 | $10,580 | $10,000 | $12,000 | $7,000.00 |
| 178 | Stop line radar detection, as per plan (809E69101) | EACH | 28 | $10,051 | $9,500.00 | $11,000 | $7,400.00 |
| 179 | Atc controller, as per plan (809E69123) | EACH | 7 | $529.02 | $500.00 | $950.00 | $4,800.00 |
| 180 | Railroad preemption interface, as per plan, US 224 (819E10001) | EACH | 1 | $10,580 | $10,000 | $12,000 | $13,000 |
| 181 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 240 | $85.00 | $150.00 | $100.00 | $101.00 |
| 182 | Special - work zone traffic signal (614E11300) | EACH | 3 | $16,000 | $15,000 | $4,500.00 | $16,000 |
| 183 | Detour signing (614E12420) | LS | 1 | $20,000 | $25,000 | $22,000 | $21,000 |
| 184 | Portable changeable message sign (614E18600) | SNMT | 96 | $850.00 | $1,000.00 | $900.00 | $1,200.00 |
| 185 | Work zone lane line, class I, 6" (614E20010) | MI | 10.22 | $700.00 | $700.00 | $725.00 | $750.00 |
| 186 | Work zone lane line, class III, 6", 642 paint (614E20560) | MI | 7.03 | $650.00 | $650.00 | $700.00 | $700.00 |
| 187 | Work zone center line, class I (614E21000) | MI | 7.84 | $1,250.00 | $1,250.00 | $1,300.00 | $1,300.00 |
| 188 | Work zone center line, class III, 642 paint (614E21550) | MI | 3.18 | $1,175.00 | $1,175.00 | $1,250.00 | $1,250.00 |
| 189 | Work zone edge line, class I, 6" (614E22010) | MI | 5.78 | $800.00 | $800.00 | $850.00 | $850.00 |
| 190 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 1.25 | $700.00 | $700.00 | $750.00 | $750.00 |
| 191 | Work zone channelizing line, class I, 8" (614E23000) | FT | 21,476 | $0.70 | $0.70 | $1.00 | $0.70 |
| 192 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 12,570 | $0.66 | $0.66 | $1.00 | $0.70 |
| 193 | Work zone dotted line, class I (614E24000) | FT | 4,268 | $0.88 | $0.88 | $1.00 | $0.90 |
| 194 | Work zone transverse/diagonal line, class I (614E25000) | FT | 4,718 | $2.00 | $2.00 | $2.50 | $2.00 |
| 195 | Work zone stop line, class I (614E26000) | FT | 2,379 | $3.00 | $3.00 | $3.00 | $3.00 |
| 196 | Work zone stop line, class III, 642 paint (614E26610) | FT | 1,207 | $3.00 | $3.00 | $3.00 | $3.00 |
| 197 | Work zone crosswalk line, class I, 12" (614E27010) | FT | 1,625 | $1.75 | $1.75 | $2.00 | $1.80 |
| 198 | Work zone arrow, class I (614E30000) | EACH | 95 | $55.00 | $55.00 | $60.00 | $59.00 |
| 199 | Water (616E10000) | MGAL | 5 | $1.00 | $128.90 | $150.00 | $195.00 |
| 200 | Longitudinal channelizing device, as per plan (831E00101) | FT | 3,380 | $85.00 | $115.00 | $88.00 | $90.00 |
| 201 | Longitudinal channelizing device, as per plan (831E00101) | FT | 1,892 | $85.00 | $115.00 | $88.00 | $90.00 |
| 202 | Pavement removed, as per plan (202E23001) | SY | 1,196 | $19.00 | $20.00 | $28.00 | $30.00 |
| 203 | Walk removed (202E30000) | SF | 80 | $5.00 | $10.00 | $20.00 | $35.00 |
| 204 | Excavation (203E10000) | CY | 25 | $40.00 | $35.00 | $50.00 | $90.00 |
| 205 | Granular material, type B (203E35110) | CY | 25 | $70.00 | $125.00 | $100.00 | $170.00 |
| 206 | Subgrade compaction (204E10000) | SY | 1,196 | $2.00 | $1.00 | $3.00 | $13.00 |
| 207 | Geotextile fabric (204E50000) | SY | 75 | $7.00 | $5.00 | $6.00 | $1.00 |
| 208 | Temporary asphalt concrete walk (608E21200) | SF | 80 | $25.00 | $5.00 | $20.00 | $80.00 |
| 209 | Special - as-built construction plans (690E20010) | LS | 1 | $7,500.00 | $20,000 | $5,500.00 | $5,000.00 |
| 210 | Erosion control (832E30000) | EACH | 14,545 | $1.00 | $1.00 | $1.00 | $1.00 |
| 211 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 301 | $320.00 | $300.00 | $295.00 | $300.00 |
| 212 | Aggregate base (304E20000) | CY | 212 | $115.00 | $175.00 | $90.00 | $200.00 |
| 213 | Non-tracking tack coat (407E20000) | GAL | 183 | $3.05 | $3.50 | $4.00 | $3.05 |
| 214 | Asphalt concrete intermediate course, 12.5 MM, type A (449) (442E22300) | CY | 119 | $325.00 | $335.00 | $310.00 | $322.00 |
| 215 | Pipe removed, 24" and under (202E35100) | FT | 5 | $100.00 | $165.00 | $340.00 | $250.00 |
| 216 | Special - fill and plug existing conduit (202E70000) | FT | 3,017 | $12.00 | $4.00 | $22.00 | $15.00 |
| 217 | Abandon misc.: water valve box (202E98600) | EACH | 9 | $100.00 | $200.00 | $800.00 | $900.00 |
| 218 | Special - 8" water main dip class 52 push on joints and fittings (638E20086) | FT | 2,075 | $200.00 | $150.00 | $160.00 | $250.00 |
| 219 | Special - 8" gate valve with valve box, city of YO (638E20554) | EACH | 7 | $4,500.00 | $2,000.00 | $3,500.00 | $2,500.00 |
| 220 | Special - 8" inserting valve with valve box, city (638E20558) | EACH | 3 | $15,000 | $12,000 | $18,000 | $12,000 |
| 221 | Special - 8" X 8" tapping sleeve, valve and valve box (638E20694) | EACH | 1 | $9,500.00 | $8,500.00 | $9,000.00 | $6,000.00 |
| 222 | Special - 6" fire hydrant, city of youngstown (638E20750) | EACH | 5 | $12,000 | $11,000 | $13,000 | $18,000 |
| 223 | Special - fire hydrant removed and disposed of, CI (638E20760) | EACH | 4 | $500.00 | $1,000.00 | $1,800.00 | $1,600.00 |
| 224 | Special - retap and reconnect water service connection (638E20786) | FT | 309 | $85.00 | $125.00 | $90.00 | $140.00 |
| 225 | Water work, misc.: 6" class 52 dip service branch, (638E98600) | FT | 14 | $600.00 | $575.00 | $400.00 | $650.00 |
| 226 | Water work, misc.: 6" fire suppression line, compl (638E98600) | FT | 42 | $450.00 | $600.00 | $350.00 | $450.00 |
| 227 | Water work, misc.: 8" class 52 dip service BR (638E98600) | FT | 19 | $700.00 | $1,000.00 | $425.00 | $650.00 |
| 228 | Water work, misc.: 8" fire suppression line, (638E98600) | FT | 198 | $460.00 | $250.00 | $360.00 | $500.00 |
| 229 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $16,000 | $25,000 | $3,500.00 | $10,000 |
| 230 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $70,000 | $100,000 | $100,000 | $100,000 |
| 231 | CPM progress schedule (108E10000) | LS | 1 | $25,000 | $75,000 | $7,500.00 | $15,000 |
| 232 | Maintaining traffic (614E11000) | LS | 1 | $863,000 | $1,250,000 | $2,005,534 | $1,265,000 |
| 233 | Field office, type C, as per plan (619E16021) | MNTH | 24 | $3,500.00 | $4,000.00 | $6,500.00 | $7,000.00 |
| 234 | Construction layout stakes and surveying (623E10000) | LS | 1 | $240,000 | $250,000 | $200,000 | $350,000 |
| 235 | Mobilization (624E10000) | LS | 1 | $700,000 | $750,000 | $400,000 | $828,000 |
| 300 | 8" conduit, type B (611E01800) | FT | 10 | $275.00 | $300.00 | $120.00 | $170.00 |
| 301 | Special - cut and plug existing 8" water lineend C (638E20880) | EACH | 2 | $2,500.00 | $1,250.00 | $1,500.00 | $2,300.00 |
| 302 | Asphalt concrete intermediate course, 12.5 MM, type A (448) (442E20170) | CY | 317 | $322.00 | $350.00 | $285.00 | $322.00 |
| 303 | Asphalt concrete intermediate course, 12.5 MM, type A (448) (442E20170) | CY | 69 | $322.00 | $425.00 | $360.00 | $322.00 |
| 304 | Special - fill and plug existing conduit (202E70000) | FT | 15 | $100.00 | $100.00 | $100.00 | $60.00 |
| 305 | Removal misc.:trench drain removed (202E98200) | FT | 14 | $100.00 | $125.00 | $150.00 | $60.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 30, 2026. Compiled by Mirage Metrics.