Karvo Companies Inc: ODOT bid record
Karvo Companies Inc submitted 401 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 77 of them (19%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $342,846,620
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 71 | 10 | 14% |
| 2021 | 76 | 13 | 17% |
| 2022 | 51 | 10 | 20% |
| 2023 | 55 | 11 | 20% |
| 2024 | 47 | 11 | 23% |
| 2025 | 54 | 8 | 15% |
| 2026 | 47 | 14 | 30% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 68 | 16 | 24% |
| SUM | 35 | 8 | 23% |
| STA | 32 | 5 | 16% |
| POR | 26 | 4 | 15% |
| GEA | 25 | 2 | 8% |
| LOR | 25 | 7 | 28% |
| MAH | 23 | 4 | 17% |
| TRU | 22 | 2 | 9% |
| LAK | 20 | 3 | 15% |
| MED | 20 | 6 | 30% |
| ATB | 18 | 6 | 33% |
| District 4 | 15 | 10 | 67% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 383 | 383 (100%) | $1.00 | $1.00 |
| Sealing of concrete surfaces (epoxy-urethane) | 512E10100 | SY | 304 | 219 (72%) | $37.05 | $34.00 |
| Raised pavement marker removed | 621E54000 | EACH | 268 | 209 (78%) | $1.05 | $12.00 |
| Treating concrete bridge decks with gravity fed resin | 512E73500 | SY | 272 | 196 (72%) | $10.62 | $11.00 |
| Ground mounted support, no. 2 post | 630E02100 | FT | 255 | 192 (75%) | $10.00 | $15.00 |
| Portable changeable message sign, as per plan | 614E18601 | SNMT | 301 | 169 (56%) | $900.00 | $950.00 |
| Non-tracking tack coat | 407E20000 | GAL | 370 | 168 (45%) | $2.50 | $3.25 |
| Sign, flat sheet | 630E80100 | SF | 240 | 163 (68%) | $20.00 | $24.00 |
| Work zone marking sign | 614E12460 | EACH | 222 | 160 (72%) | $75.00 | $92.00 |
| Removal of ground mounted post support and disposal | 630E86002 | EACH | 282 | 152 (54%) | $25.00 | $23.50 |
| Removal of ground mounted sign and disposal | 630E84900 | EACH | 282 | 152 (54%) | $25.00 | $20.00 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 257 | 152 (59%) | $3.00 | $3.50 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly Company | 224 | 101 of 224 |
| Shelly & Sands Inc | 174 | 109 of 174 |
| Kokosing Construction Company Inc | 158 | 81 of 158 |
| Ronyak Paving Inc | 110 | 78 of 110 |
| Chagrin Valley Paving Inc | 96 | 46 of 96 |
| Barbicas Construction Company Inc | 90 | 30 of 90 |
| Perk Company Inc | 39 | 16 of 39 |
| Eclipse Co LLC | 31 | 16 of 31 |
| S E T Inc | 26 | 6 of 26 |
| Kenmore Construction Co Inc | 25 | 16 of 25 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260510 | SUM | SUM-SR 261-11.89 (FOUR LANE RESURFACING) | 3 of 7 | $1,765,136 | +28% |
| 29 OCT 2026 | 260399 | CUY | CUY-US 422-16.20 Interchange (INTERCHANGE) | 4 of 4 | $12,553,301 | +11% |
| 29 OCT 2026 | 260468 | MAH | MAH-SR 46-13.55 (PART 1 AND PART 2) (INTERSECTION) | 2 of 4 | $7,475,832 | +14% |
| 29 OCT 2026 | 260477 | ATB | ATB-IR 90 Vacant Rest Areas TP (PARKING AREAS) | 1 of 3 | $9,185,577 | Low, 1.0% under the second |
| 15 OCT 2026 | 260426 | LAK | LAK-US 20-00.04 Wickliffe (TWO LANE RESURFACING) | 4 of 5 | $7,515,000 | +10% |
| 15 OCT 2026 | 260457 | COL | COL-SR 518-06.69 (TWO LANE RESURFACING) | 2 of 4 | $1,675,434 | +19% |
| 15 OCT 2026 | 260473 | TUS | TUS-IR 77-04.02 (FOUR LANE RESURFACING) | 2 of 2 | $5,545,603 | +4.0% |
| 01 OCT 2026 | 260428 | MAH | MAH-SR 11-00.00 (FOUR LANE RESURFACING) | 2 of 3 | $6,657,943 | +4.0% |
| 01 OCT 2026 | 260429 | MED | MED-SR 3-20.63 (INTERSECTION) | 4 of 6 | $2,076,479 | +13% |
| 01 OCT 2026 | 260432 | POR | POR-US 224/VAR-18.67/VAR (TWO LANE RESURFACING) | 3 of 4 | $4,445,249 | +3.0% |
| 17 SEP 2026 | 260403 | CUY | CUY-/GEA-US 422-18.17/00.00 (FOUR LANE RESURFACING) | 1 of 4 | $5,317,000 | Low, 2.0% under the second |
| 13 AUG 2026 | 260332 | STA | STA-SR 241-16.86 (PART 1 AND PART 2) (MINOR RECONSTRUCTION) | 2 of 4 | $8,247,525 | +15% |
| 30 JUL 2026 | 260327 | CUY | CUY-IR 90-20.45 Barrier (MISCELLANEOUS) | 2 of 3 | $13,075,871 | +3.0% |
| 30 JUL 2026 | 260354 | MAH | MAH-US 224-17.72 (PART 1 AND PART 2) (MAJOR RECONSTRUCTION) | 2 of 4 | $14,804,327 | +4.0% |
| 25 JUN 2026 | 260308 | CUY | CUY-IR-IR 90-00.00 (FOUR LANE RESURFACING) | 3 of 3 | $8,157,326 | +17% |
| 25 JUN 2026 | 260309 | CUY | CUY-S. Waterloo Road (TWO LANE RESURFACING) | 3 of 3 | $1,507,471 | +19% |
| 25 JUN 2026 | 260310 | CUY | CUY-SR 10-01.97 (FOUR LANE RESURFACING) | 3 of 4 | $4,975,297 | +14% |
| 25 JUN 2026 | 260311 | CUY | CUY-Van Aken Blvd Resurfacing (FOUR LANE RESURFACING) | 3 of 4 | $1,075,602 | +7.0% |
| 11 JUN 2026 | 260284 | COL | COL-SR 9/SR 14-14.23/03.65 (TWO LANE RESURFACING) | 2 of 4 | $825,455 | +12% |
| 11 JUN 2026 | 260285 | CUY | CUY-SR 237-06.35 (FOUR LANE RESURFACING) | 1 of 3 | $3,245,457 | Low, 25% under the second |
| 21 MAY 2026 | 260276 | ATB | ATB-/TRU Geneva/Mosquito FY2026 (PARKING AREAS) | 5 of 6 | $2,327,624 | +10% |
| 21 MAY 2026 | 260277 | District 4 | D04-SP FY2026 (East) (SPOT PATCHING / PAVEMENT REPAIR) | 1 of 3 | $1,107,697 | Low, 40% under the second |
| 07 MAY 2026 | 260231 | CUY | CUY-IR 77-10.08 (FOUR LANE RESURFACING) | 1 of 2 | $3,275,271 | Low, 3.0% under the second |
| 07 MAY 2026 | 260235 | CUY | CUY-SR 8-00.52 Pedestrian (SIDEWALK) | 3 of 6 | $1,075,062 | +20% |
| 07 MAY 2026 | 260245 | POR | POR-SR 261-03.51 (TWO LANE RESURFACING) | 3 of 6 | $1,097,516 | +6.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.