ODOT letting results, September 17, 2026
16 contracts let by Ohio DOT on September 17, 2026, $38,465,622 in low bids, a median of 3 bidders per contract. On the 16 with an engineer's estimate, the low bid came in under it 10 times; median low bid -4.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 16
- Low bids, total
- $38,465,622
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 260401 | CHP-SR PAVE FY27 (TWO LANE RESURFACING) | CHP | 3 | Shelly Company | $6,321,793 | $6,893,800 | +9.0% | -10% | ODOT |
| 260413 | VIN-SR 160/SR 349-03.92/00.00 (TWO LANE RESURFACING) | VIN | 2 | Shelly & Sands Inc | $5,406,545 | $5,653,894 | +5.0% | +4.0% | ODOT |
| 260403 | CUY-/GEA-US 422-18.17/00.00 (FOUR LANE RESURFACING) | CUY | 4 | Karvo Companies Inc | $5,317,000 | $5,397,458 | +2.0% | +3.0% | ODOT |
| 260410 | MAR-SR-SR 309/SR 95/SR 203-18.79/17.19/07.75 (TWO LANE RESURFACING) | MAR | 2 | Shelly & Sands Inc | $4,236,924 | $4,462,513 | +5.0% | -5.0% | ODOT |
| 260400 | ASD-US 250-17.325 (TWO LANE RESURFACING) | ASD | 2 | Shelly & Sands Inc | $3,199,463 | $3,320,848 | +4.0% | -4.0% | ODOT |
| 260404 | D08-LED LG FY2027 (LIGHTING) | District 8 | 5 | Complete General Construction Company | $2,298,595 | $2,804,355 | +22% | +6.0% | ODOT |
| 260407 | HIG-US 62-00.00 (TWO LANE RESURFACING) | HIG | 4 | Brown County Asphalt Inc | $2,084,052 | $2,106,754 | +1.0% | -10% | ODOT |
| 260409 | JAC-SR 93-17.42 (TWO LANE RESURFACING) | JAC | 2 | Shelly & Sands Inc | $2,026,910 | $2,239,434 | +10% | +8.0% | ODOT |
| 260406 | GEA-Chardon TSG upgrade (SIGNALIZATION) | GEA | 3 | S E T Inc | $1,610,000 | $1,612,955 | 0.0% | +1.0% | ODOT |
| 260402 | CUY-Cle Downtown Connector Trl 1 (BIKEWAYS) | CUY | 5 | Catts Construction Inc | $1,330,135 | $1,479,698 | +11% | -2.0% | ODOT |
| 260414 | WAR-BS 2027 (BRIDGE REPAIR) | WAR | 2 | Aad Contracting Inc | $1,211,514 | $1,823,669 | +51% | -5.0% | ODOT |
| 260415 | D03-GR FY2027 (GUARDRAIL REBUILDING) | District 3 | 2 | Lake Erie Construction Company | $1,112,320 | $1,166,676 | +5.0% | -4.0% | ODOT |
| 264023 | BEL-SR 148-20.10 (SLIDE REPAIR) | BEL | 2 | J & J Bridge Company Inc | $943,435 | $1,021,773 | +8.0% | -6.0% | ODOT |
| 260408 | JAC-SR 327-14.98 (SLIDE REPAIR) | JAC | 7 | Alan Stone Co Inc | $675,653 | $760,417 | +13% | -31% | ODOT |
| 260416 | WIL-US 127-15.09 Culvert (CULVERT REPLACEMENT) | WIL | 3 | Geddis Paving & Excavating Inc | $404,515 | $426,132 | +5.0% | -5.0% | ODOT |
| 264022 | ASD-/WAY BH FY2027(B) (BRIDGE REPAIR) | ASD | 3 | Crawford Construction Company Inc | $286,768 | $291,561 | +2.0% | +6.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.