ODOT contract 260404 bid tabulation
D08-LED LG FY2027 (LIGHTING). Let by Ohio DOT on September 17, 2026, District 8. 5 bids received; low bid $2,298,595 by Complete General Construction Company, +5.6% against the engineer's estimate of $2,176,000.
- Owner
- Ohio DOT
- Letting
- 17 SEP 2026
- Pay items
- 27
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Complete General Construction Company | $2,298,595 | Low | +6.0% |
| 2 | Bansal Construction Inc | $2,804,355 | +22% | +29% |
| 3 | Danbert Electrical Corp | $3,079,218 | +34% | +42% |
| 4 | Capital Electric Line Builders Inc | $3,427,597 | +49% | +58% |
| 5 | Miller Cable Company | $5,668,330 | +147% | +160% |
Engineer's estimate: $2,176,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Complete General Construction Company | 2. Bansal Construction Inc | 3. Danbert Electrical Corp | 4. Capital Electric Line Builders Inc | 5. Miller Cable Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $7,000.00 | $5,000.00 | $1,650.00 | $14,411 | $5,000.00 |
| 2 | Connection, unfused permanent (625E00480) | EACH | 3 | $115.00 | $205.00 | $132.00 | $167.69 | $185.00 |
| 3 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 10 | $320.00 | $525.00 | $374.00 | $215.02 | $525.00 |
| 4 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 791 | $320.00 | $540.00 | $385.00 | $228.12 | $600.00 |
| 5 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 186 | $415.00 | $615.00 | $456.50 | $319.80 | $600.00 |
| 6 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 54 | $455.00 | $650.00 | $489.50 | $371.50 | $600.00 |
| 7 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 140 | $1,050.00 | $1,520.00 | $1,280.00 | $1,069.39 | $2,000.00 |
| 8 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 15 | $675.00 | $610.00 | $478.50 | $402.42 | $875.00 |
| 9 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 32 | $675.00 | $620.00 | $489.50 | $402.42 | $875.00 |
| 10 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 14 | $675.00 | $650.00 | $522.50 | $415.35 | $800.00 |
| 11 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 127 | $655.00 | $640.00 | $506.00 | $389.49 | $875.00 |
| 12 | Luminaire, misc.: counterweight, high mast, as per (625E27600) | EACH | 15 | $495.00 | $1,190.00 | $962.50 | $233.17 | $2,250.00 |
| 13 | Luminaire, misc.: luminaire glass, reflector, and (625E27600) | EACH | 149 | $115.00 | $300.00 | $165.00 | $87.19 | $375.00 |
| 14 | Luminaire, misc.: luminaire, conventional, solid S (625E27600) | EACH | 50 | $215.00 | $405.00 | $313.50 | $226.45 | $450.00 |
| 15 | Luminaire, misc.: luminaire, underpass, solid stat (625E27600) | EACH | 20 | $325.00 | $450.00 | $396.00 | $343.98 | $450.00 |
| 16 | Pull box, 725.08, 18" (625E30700) | EACH | 1 | $1,500.00 | $1,115.00 | $1,331.00 | $3,112.18 | $1,850.00 |
| 17 | Power service, as per plan (625E34001) | EACH | 51 | $9,975.00 | $16,500 | $15,790 | $18,148 | $27,500 |
| 18 | Special - maintain existing lighting (625E40000) | LS | 1 | $10,000 | $15,000 | $12,100 | $117,866 | $42,000 |
| 19 | Light tower removed (625E75350) | EACH | 1 | $2,950.00 | $7,500.00 | $7,700.00 | $8,808.26 | $12,500 |
| 20 | Luminaire removed (625E75506) | EACH | 1,375 | $35.00 | $75.00 | $27.50 | $28.61 | $450.00 |
| 21 | Light tower foundation removed (625E75540) | EACH | 1 | $1,650.00 | $5,000.00 | $440.00 | $1,498.59 | $1,850.00 |
| 22 | Arc flash calculations and label (per S.S. 825) (625E76000) | EACH | 51 | $2,000.00 | $275.00 | $3,355.00 | $5,750.00 | $2,400.00 |
| 23 | Lighting, misc.:tower internal component replaceme (625E98000) | EACH | 51 | $15,550 | $12,500 | $22,750 | $19,001 | $36,750 |
| 24 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 150 | $110.00 | $75.00 | $110.00 | $97.75 | $225.00 |
| 25 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,500 | $20,875 | $14,850 | $34,271 | $14,500 |
| 26 | Maintaining traffic (614E11000) | LS | 1 | $25,000 | $36,000 | $22,000 | $448,500 | $225,000 |
| 27 | Mobilization (624E10000) | LS | 1 | $100,000 | $100,000 | $71,940 | $36,027 | $125,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of September 17, 2026. Compiled by Mirage Metrics.