Capital Electric Line Builders Inc: ODOT bid record
Capital Electric Line Builders Inc submitted 34 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 01 OCT 2026, and was the low bidder on 15 of them (44%). When it was not low, its total sat a median +20% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $18,477,532
- Latest bid
- 01 OCT 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 6 | 4 | 67% |
| 2021 | 3 | 0 | 0% |
| 2022 | 4 | 2 | 50% |
| 2023 | 3 | 1 | 33% |
| 2024 | 4 | 3 | 75% |
| 2025 | 9 | 3 | 33% |
| 2026 | 5 | 2 | 40% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| District 8 | 8 | 4 | 50% |
| District 7 | 8 | 7 | 88% |
| HAM | 5 | 3 | 60% |
| MOT | 4 | 1 | 25% |
| District 6 | 3 | 0 | 0% |
| BUT | 1 | 0 | 0% |
| WAR | 1 | 0 | 0% |
| CLE | 1 | 0 | 0% |
| MIA | 1 | 0 | 0% |
| CLA | 1 | 0 | 0% |
| District 3 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Luminaire, conventional, solid state (LED), as per plan | 625E26253 | EACH | 24 | 19 (79%) | $221.57 | $500.00 |
| Erosion control | 832E30000 | EACH | 12 | 12 (100%) | $1.00 | $1.00 |
| Ground rod | 625E32000 | EACH | 14 | 7 (50%) | $255.32 | $285.00 |
| Relamp existing signal section with LED lamp unit, as per plan | 632E10101 | EACH | 15 | 6 (40%) | $60.12 | $83.25 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 21 | 5 (24%) | $77.00 | $80.00 |
| Connection, fused pull apart | 625E00450 | EACH | 6 | 4 (67%) | $111.19 | $122.84 |
| Luminaire, underpass, solid state (LED), as per plan | 625E27503 | EACH | 5 | 4 (80%) | $402.42 | $720.00 |
| Covering of vehicular signal head | 632E25000 | EACH | 12 | 3 (25%) | $19.16 | $40.00 |
| Connection, unfused permanent | 625E00480 | EACH | 8 | 3 (38%) | $82.35 | $120.00 |
| Power service, as per plan | 632E70001 | EACH | 8 | 3 (38%) | $2,625.23 | $2,879.00 |
| Service cable, 3 conductor, no. 6 AWG | 632E69800 | FT | 8 | 3 (38%) | $5.50 | $6.00 |
| Ethernet cable, outdoor-rated | 809E64550 | FT | 8 | 3 (38%) | $3.02 | $3.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Complete General Construction Company | 21 | 14 of 21 |
| Bansal Construction Inc | 18 | 11 of 18 |
| Miller Cable Company | 16 | 5 of 16 |
| Perram Electric Inc | 13 | 7 of 13 |
| Asplundh Construction LLC | 7 | 4 of 7 |
| Danbert Electrical Corp | 6 | 3 of 6 |
| Security Fence Group Inc | 5 | 4 of 5 |
| J Ranck Electric Inc | 4 | 0 of 4 |
| Elex Inc | 3 | 2 of 3 |
| U S Utility Contractor Company | 2 | 1 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 01 OCT 2026 | 260445 | District 6 | D06-ELEC-FY2027 (LIGHTING) | 4 of 4 | $932,227 | +69% |
| 17 SEP 2026 | 260404 | District 8 | D08-LED LG FY2027 (LIGHTING) | 4 of 5 | $3,427,597 | +49% |
| 11 JUN 2026 | 260297 | District 7 | D07-TSG & Lighting MAINT FY27 (SIGNALIZATION) | 1 of 1 | $1,809,897 | Low |
| 09 APR 2026 | 260180 | MOT | MOT-CR 74-08.40 (SIGNALIZATION) | 1 of 4 | $818,666 | Low, 3.0% under the second |
| 26 MAR 2026 | 260165 | MOT | MOT-SR 725/Jamaica TSG (SIGNALIZATION) | 5 of 6 | $253,314 | +27% |
| 09 OCT 2025 | 250478 | District 6 | D06-ELEC FY26 (LIGHTING) | 3 of 4 | $650,535 | +33% |
| 25 SEP 2025 | 250446 | District 3 | D03-TSG Radar FY2026 (SIGNALIZATION) | 6 of 6 | $327,618 | +56% |
| 11 SEP 2025 | 250406 | CLA | CLA-SR 235/SR 571-04.36/01.05 (LIGHTING) | 3 of 9 | $69,944 | +3.0% |
| 17 JUL 2025 | 250351 | District 6 | D06-ITS MAINT-FY2026 (SIGNALIZATION) | 5 of 7 | $2,017,671 | +68% |
| 17 JUL 2025 | 250352 | District 7 | D07-TSG & Lighting MAINT FY26 (SIGNALIZATION) | 1 of 1 | $1,536,853 | Low |
| 17 JUL 2025 | 250353 | District 8 | D08-ITS Maint FY2026 (SIGNALIZATION) | 2 of 2 | $1,639,079 | +26% |
| 12 JUN 2025 | 250314 | District 8 | D08-LG-FY2026/2027 (LIGHTING) | 1 of 1 | $2,591,576 | Low |
| 27 MAR 2025 | 250175 | District 8 | D08-LG LED FY25 (LIGHTING) | 1 of 6 | $440,699 | Low, 52% under the second |
| 16 JAN 2025 | 250030 | District 7 | D07-ITS Maint-FY 2025 (SIGNALIZATION) | 3 of 5 | $945,622 | +17% |
| 19 DEC 2024 | 240583 | HAM | HAM-VAR Sharonville Signals (SIGNALIZATION) | 1 of 4 | $831,166 | Low, 1.0% under the second |
| 11 JUL 2024 | 240367 | District 7 | D07-TSG & Lighting MAINT FY25 (LIGHTING) | 1 of 1 | $1,112,392 | Low |
| 13 JUN 2024 | 240336 | District 8 | D08-LG-FY2025 (LIGHTING) | 1 of 1 | $1,479,611 | Low |
| 18 APR 2024 | 240258 | MIA | MIA-/MER-US 40/US 127-01.637/08.981 (SIGNALIZATION) | 3 of 3 | $425,576 | +14% |
| 13 JUL 2023 | 230390 | District 7 | D07-TSG MAINT FY24 (SIGNALIZATION) | 1 of 1 | $638,442 | Low |
| 08 JUN 2023 | 230362 | MOT | MOT-IR 75-22.92 (SIGNALIZATION) | 6 of 6 | $348,180 | +21% |
| 30 MAR 2023 | 230201 | District 8 | D08-TSG-FY2023/FY2024 (SIGNALIZATION) | 2 of 2 | $2,104,390 | +9.0% |
| 13 OCT 2022 | 220544 | CLE | CLE-SR 125-01.47 (INTERSECTION) | 5 of 5 | $322,464 | +15% |
| 29 SEP 2022 | 220516 | HAM | HAM-CR 457-01.52 (INTERSECTION) | 4 of 4 | $594,550 | +20% |
| 28 JUL 2022 | 220452 | District 7 | D07-TSG Maint FY23 (SIGNALIZATION) | 1 of 1 | $373,771 | Low |
| 17 FEB 2022 | 220119 | District 7 | D07-/D08-LG FY2022/FY2023 (LIGHTING) | 1 of 2 | $3,359,009 | Low, 49% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.