ODOT letting results, June 12, 2025
16 contracts let by Ohio DOT on June 12, 2025, $23,565,169 in low bids, a median of 2 bidders per contract. On the 16 with an engineer's estimate, the low bid came in under it 8 times; median low bid -1.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 16
- Low bids, total
- $23,565,169
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 250300 | ATB-SR 7-14.95/18.44 (TWO LANE RESURFACING) | ATB | 2 | Karvo Companies Inc | $3,775,000 | $4,055,122 | +7.0% | -8.0% | ODOT |
| 250314 | D08-LG-FY2026/2027 (LIGHTING) | District 8 | 1 | Capital Electric Line Builders Inc | $2,591,576 | 0.0% | ODOT | ||
| 250305 | MED-SR 18/SR 57-15.05/17.807 (FOUR LANE RESURFACING) | MED | 3 | Karvo Companies Inc | $2,378,000 | $2,570,239 | +8.0% | -1.0% | ODOT |
| 250311 | D05-FY2026 Bridge Rehab East (BRIDGE REPAIR) | District 5 | 2 | BCC Ohio Inc | $1,970,231 | $2,763,915 | +40% | -9.0% | ODOT |
| 250302 | ERI-SR 101-02.72 (TWO LANE RESURFACING) | ERI | 2 | Erie Blacktop Inc | $1,787,595 | $1,949,935 | +9.0% | -22% | ODOT |
| 250308 | VIN-SR 93-00.00 (TWO LANE RESURFACING) | VIN | 1 | Shelly & Sands Inc | $1,771,327 | +13% | ODOT | ||
| 250304 | HOL-SR 520-00.00 (TWO LANE RESURFACING) | HOL | 1 | Melway Paving Co Inc | $1,419,742 | +8.0% | ODOT | ||
| 250301 | BEL-IR 70-07.64 (SPOT PATCHING / PAVEMENT REPAIR) | BEL | 4 | Shelly & Sands Inc | $1,159,640 | $1,476,650 | +27% | -24% | ODOT |
| 250312 | D05-FY2026 Bridge Rehab West (BRIDGE REPAIR) | District 5 | 2 | BCC Ohio Inc | $1,131,672 | $2,083,673 | +84% | -19% | ODOT |
| 250307 | SHE-SR 29-15.14 (FOUR LANE RESURFACING) | SHE | 1 | Barrett Paving Materials Inc | $1,103,000 | +30% | ODOT | ||
| 250303 | HAM-US 52-35.22 (SPOT PATCHING / PAVEMENT REPAIR) | HAM | 2 | John R Jurgensen Company | $994,758 | $1,862,700 | +87% | +77% | ODOT |
| 250317 | MED-US 42-03.10 L Reconstr. (BRIDGE REPAIR) | MED | 4 | J D Williamson Construction Co Inc | $875,141 | $1,003,987 | +15% | -12% | ODOT |
| 250306 | MOT-SR 741-08.43 (TWO LANE RESURFACING) | MOT | 2 | John R Jurgensen Company | $846,108 | $931,378 | +10% | +8.0% | ODOT |
| 250313 | D06-GR FY26 (GUARDRAIL REBUILDING) | District 6 | 2 | Lake Erie Construction Company | $712,570 | $765,376 | +7.0% | -6.0% | ODOT |
| 258013 | MAR-US 23-16.92 Damage Repair (BRIDGE REPAIR) | MAR | 1 | Evers Steel Construction LLC | $607,582 | +164% | ODOT | ||
| 250310 | D01-RPM FY26 (RAISED PAVEMENT MARKERS) | District 1 | 3 | W L Markers Inc | $441,228 | $482,974 | +9.0% | +2.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.