Melway Paving Co Inc: ODOT bid record
Melway Paving Co Inc submitted 28 bids on Ohio DOT contracts in the data, from 13 FEB 2020 to 30 JUL 2026, and was the low bidder on 14 of them (50%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $31,664,416
- Latest bid
- 30 JUL 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 4 | 2 | 50% |
| 2021 | 3 | 3 | 100% |
| 2022 | 3 | 0 | 0% |
| 2023 | 7 | 5 | 71% |
| 2024 | 3 | 2 | 67% |
| 2025 | 5 | 2 | 40% |
| 2026 | 3 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| HOL | 10 | 8 | 80% |
| COS | 3 | 1 | 33% |
| HAS | 2 | 1 | 50% |
| District 3 | 2 | 1 | 50% |
| HUR | 1 | 1 | 100% |
| CAR | 1 | 0 | 0% |
| TUS | 1 | 0 | 0% |
| CRA | 1 | 0 | 0% |
| District 11 | 1 | 1 | 100% |
| ASD | 1 | 0 | 0% |
| COL | 1 | 1 | 100% |
| BEL | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 22 | 22 (100%) | $1.00 | $1.00 |
| Work zone marking sign | 614E12460 | EACH | 19 | 10 (53%) | $60.00 | $92.00 |
| Prime coat, as per plan | 408E10001 | GAL | 12 | 10 (83%) | $3.75 | $5.00 |
| Center line, type 1 | 642E00300 | MI | 14 | 9 (64%) | $992.50 | $5,500.00 |
| Work zone center line, class III, 642 paint | 614E21550 | MI | 22 | 8 (36%) | $970.00 | $1,186.00 |
| Pavement repair | 253E02000 | CY | 14 | 8 (57%) | $277.50 | $340.00 |
| Raised pavement marker removed | 621E54000 | EACH | 25 | 7 (28%) | $14.00 | $12.00 |
| RPM | 621E00100 | EACH | 25 | 7 (28%) | $35.00 | $52.92 |
| Work zone stop line, class III, 642 paint | 614E26610 | FT | 17 | 7 (41%) | $3.50 | $3.50 |
| Edge line, 6", type 1 | 642E00104 | MI | 13 | 6 (46%) | $780.00 | $3,200.00 |
| Work zone center line, class II, 642 paint | 614E21500 | MI | 17 | 5 (29%) | $470.00 | $500.00 |
| Partial depth pavement repair (asphalt concrete base) | 251E01042 | CY | 14 | 5 (36%) | $325.00 | $325.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Shelly Company | 14 | 5 of 14 |
| Henry W Bergman Inc | 8 | 4 of 8 |
| Karvo Companies Inc | 8 | 0 of 8 |
| Kokosing Construction Company Inc | 8 | 4 of 8 |
| Shelly & Sands Inc | 7 | 3 of 7 |
| Specialized Construction Inc | 5 | 2 of 5 |
| Strawser Construction Inc | 4 | 0 of 4 |
| Allied Construction, LLC | 2 | 1 of 2 |
| Erie Blacktop Inc | 1 | 0 of 1 |
| Superior Paving & Materials Inc | 1 | 1 of 1 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 30 JUL 2026 | 260350 | HAS | HAS-/TUS-SR 342/SR 800-0.00/VAR (CHIP SEAL) | 4 of 4 | $738,331 | +9.0% |
| 16 JUL 2026 | 260326 | COS | COS-/TUS-SR 93/SR 651-11.96/00.00 (TWO LANE RESURFACING) | 2 of 2 | $5,510,272 | +16% |
| 19 FEB 2026 | 260109 | HOL | HOL-SR 179-00.00 (MINOR RECONSTRUCTION) | 3 of 4 | $3,562,637 | +17% |
| 23 OCT 2025 | 250491 | GUE | GUE-/GUE-SR 93/SR 541/SR 658 VAR (CHIP SEAL) | 2 of 2 | $1,760,145 | +12% |
| 09 OCT 2025 | 250465 | HOL | HOL-/TUS-US 62/US 39-VAR (TWO LANE RESURFACING) | 1 of 3 | $5,093,502 | Low, 15% under the second |
| 31 JUL 2025 | 250366 | WAY | WAY-SR 302-03.82 (TWO LANE RESURFACING) | 2 of 4 | $4,226,926 | +1.0% |
| 12 JUN 2025 | 250304 | HOL | HOL-SR 520-00.00 (TWO LANE RESURFACING) | 1 of 1 | $1,419,742 | Low |
| 30 JAN 2025 | 250043 | COS | COS-CR 621-00.00 (BIKEWAYS) | 2 of 2 | $2,559,741 | +9.0% |
| 27 JUN 2024 | 240342 | District 3 | D03-CHIP FY2025 (CHIP SEAL) | 1 of 1 | $3,193,195 | Low |
| 11 JAN 2024 | 240013 | HOL | HOL-SR 39-06.72 (TWO LANE RESURFACING) | 1 of 3 | $1,439,186 | Low, 2.0% under the second |
| 11 JAN 2024 | 240020 | MED | MED-/WAY-SR 83/SR 585-00.91/11.98 (TWO LANE RESURFACING) | 2 of 5 | $1,509,537 | +17% |
| 09 NOV 2023 | 230533 | BEL | BEL-SR 145-00.00 (CHIP SEAL) | 3 of 3 | $732,794 | +31% |
| 12 OCT 2023 | 230492 | HOL | HOL-/WAY-SR 83/VAR-14.70/VAR (TWO LANE RESURFACING) | 1 of 4 | $2,547,223 | Low, 9.0% under the second |
| 13 JUL 2023 | 230380 | COL | COL-SR 14T-00.00 (CHIP SEAL) | 1 of 2 | $621,814 | Low, 5.0% under the second |
| 22 JUN 2023 | 230364 | COS | COS-/LIC-SR 79/SR 657-00.00/00.00 (CHIP SEAL) | 1 of 4 | $1,453,434 | Low, 3.0% under the second |
| 27 APR 2023 | 230247 | ASD | ASD-/RIC-CHIP FY2023 (CHIP SEAL) | 3 of 4 | $1,731,071 | +20% |
| 23 FEB 2023 | 230118 | District 11 | D11-CHIP-FY2023 (CHIP SEAL) | 1 of 3 | $1,767,255 | Low, 15% under the second |
| 09 FEB 2023 | 230091 | HOL | HOL-US 62-05.66 (TWO LANE RESURFACING) | 1 of 4 | $1,312,478 | Low, 13% under the second |
| 12 MAY 2022 | 220308 | District 3 | D03-/RIC-SR 95/SR 603-01.46/00.00 (CHIP SEAL) | 2 of 3 | $653,009 | +4.0% |
| 17 MAR 2022 | 220177 | HOL | HOL-SR 3-00.00 (TWO LANE RESURFACING) | 3 of 3 | $1,297,422 | +5.0% |
| 17 MAR 2022 | 220191 | CRA | CRA-/RIC-SR 98-19.20/00.00 (CHIP SEAL) | 2 of 4 | $612,371 | 0.0% |
| 02 DEC 2021 | 210633 | HOL | HOL-SR 557-00.00, HOL-SR 643-00.00 (TWO LANE RESURFACING) | 1 of 2 | $7,717,134 | Low, 5.0% under the second |
| 18 NOV 2021 | 210605 | HAS | HAS-SR 519-00.00 (CHIP SEAL) | 1 of 4 | $547,437 | Low, 13% under the second |
| 28 JAN 2021 | 210060 | HOL | HOL-SR 514-00.00 (TWO LANE RESURFACING) | 1 of 4 | $2,193,244 | Low, 7.0% under the second |
| 03 DEC 2020 | 200580 | TUS | TUS-SR 516-00.00 (TWO LANE RESURFACING) | 4 of 9 | $767,789 | +6.0% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.