ODOT contract 260109 bid tabulation
HOL-SR 179-00.00 (MINOR RECONSTRUCTION). Let by Ohio DOT on February 19, 2026, HOL. 4 bids received; low bid $3,057,729 by Shelly & Sands Inc, -25% against the engineer's estimate of $4,093,000.
- Owner
- Ohio DOT
- Letting
- 19 FEB 2026
- Pay items
- 54
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly & Sands Inc | $3,057,729 | Low | -25% |
| 2 | Kokosing Construction Company Inc | $3,068,994 | 0.0% | -25% |
| 3 | Melway Paving Co Inc | $3,562,637 | +17% | -13% |
| 4 | Shelly Company | $3,838,868 | +26% | -6.0% |
Engineer's estimate: $4,093,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly & Sands Inc | 2. Kokosing Construction Company Inc | 3. Melway Paving Co Inc | 4. Shelly Company |
|---|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 1,907 | $10.00 | $3.50 | $25.00 | $6.00 |
| 2 | Excavation of subgrade (204E13000) | CY | 1,363 | $25.00 | $15.00 | $25.00 | $16.00 |
| 3 | Geotextile fabric (204E50000) | SY | 4,089 | $0.75 | $0.56 | $1.35 | $1.85 |
| 4 | Linear grading (209E60500) | MI | 7.79 | $880.00 | $2,000.00 | $1,300.00 | $2,125.00 |
| 5 | Preparing subgrade for shoulder paving, as per plan (209E72051) | MI | 7.79 | $2,300.00 | $200.00 | $430.00 | $5,400.00 |
| 6 | Special - mailbox support system, single (690E50100) | EACH | 2 | $350.00 | $250.00 | $275.00 | $150.00 |
| 7 | Special - mailbox support system, double (690E50200) | EACH | 1 | $400.00 | $350.00 | $400.00 | $200.00 |
| 8 | Soil analysis test (659E00100) | EACH | 2 | $25.00 | $25.00 | $135.00 | $25.00 |
| 9 | Seeding and mulching (659E10000) | SY | 16,000 | $0.82 | $0.25 | $0.99 | $0.80 |
| 10 | Repair seeding and mulching (659E14000) | SY | 800 | $0.75 | $0.25 | $0.80 | $0.75 |
| 11 | Commercial fertilizer (659E20000) | TON | 2.16 | $250.00 | $100.00 | $885.00 | $250.00 |
| 12 | Lime (659E31000) | ACRE | 3.31 | $25.00 | $10.00 | $161.00 | $25.00 |
| 13 | Water (659E35000) | MGAL | 87 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | Erosion control (832E30000) | EACH | 8,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 15 | Conduit, misc.:review of drainage facilities (611E97300) | LS | 1 | $1,000.00 | $2,000.00 | $500.00 | $2,500.00 |
| 17 | Aggregate base (304E20000) | CY | 1,363 | $90.00 | $40.00 | $70.00 | $45.00 |
| 18 | Tack coat (407E10000) | GAL | 6,562 | $3.50 | $2.75 | $2.35 | $3.00 |
| 19 | Prime coat, as per plan (408E10001) | GAL | 3,641 | $5.00 | $5.00 | $3.90 | $6.00 |
| 20 | Asphalt concrete surface course, type 1, (446), PG70-22M (441E10100) | CY | 2,075 | $190.00 | $205.00 | $250.00 | $250.00 |
| 21 | Asphalt concrete intermediate course, type 2, (446) (441E10200) | CY | 5,989 | $160.00 | $160.00 | $200.00 | $190.00 |
| 22 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 84 | $475.00 | $400.00 | $460.00 | $580.00 |
| 23 | Compacted aggregate, as per plan (617E10101) | CY | 1,015 | $38.00 | $30.00 | $70.00 | $32.00 |
| 24 | Pavement removed (827E10000) | SY | 57,365 | $1.90 | $1.75 | $4.40 | $7.40 |
| 25 | Cement (827E11000) | TON | 2,001 | $194.50 | $194.00 | $195.00 | $189.00 |
| 26 | Curing coat (827E12000) | SY | 57,031 | $1.40 | $1.00 | $0.80 | $1.00 |
| 27 | Full depth reclaimed base course, 12" deep (827E20000) | SY | 57,031 | $3.90 | $4.20 | $3.95 | $4.00 |
| 28 | Mixture design for full depth reclaimed base (827E21000) | LS | 1 | $25,700 | $33,000 | $25,800 | $25,000 |
| 29 | Corrective material (827E22000) | TON | 287 | $12.90 | $20.00 | $29.00 | $30.00 |
| 30 | Cover aggregate (827E23000) | TON | 419 | $26.50 | $20.00 | $19.00 | $20.00 |
| 31 | Just-in-time training (827E30000) | LS | 1 | $2,000.00 | $1,500.00 | $2,000.00 | $1,500.00 |
| 32 | RPM (621E00100) | EACH | 513 | $38.00 | $38.00 | $55.00 | $33.00 |
| 33 | Raised pavement marker removed (621E54000) | EACH | 513 | $9.00 | $1.00 | $0.80 | $6.00 |
| 34 | Ground mounted support, no. 3 post (630E03100) | FT | 9 | $20.00 | $20.00 | $20.00 | $80.00 |
| 35 | Sign, flat sheet (630E80100) | SF | 9 | $25.00 | $25.00 | $25.00 | $90.00 |
| 36 | Removal of ground mounted sign and disposal (630E84900) | EACH | 1 | $25.00 | $25.00 | $25.00 | $250.00 |
| 37 | Removal of ground mounted post support and disposal (630E86002) | EACH | 1 | $25.00 | $25.00 | $25.00 | $250.00 |
| 38 | Edge line, 6" (646E10010) | MI | 7.78 | $3,075.00 | $3,075.00 | $3,015.00 | $3,000.00 |
| 39 | Center line (646E10200) | MI | 3.89 | $3,515.00 | $3,515.00 | $3,615.00 | $3,600.00 |
| 40 | Railroad symbol marking (646E20000) | EACH | 1 | $650.00 | $650.00 | $1,005.00 | $1,000.00 |
| 41 | Dotted line, 6" (646E20504) | FT | 134 | $3.00 | $3.00 | $1.50 | $1.50 |
| 42 | Traffic compacted surface, type A or B (410E12000) | CY | 50 | $140.00 | $30.00 | $120.00 | $45.00 |
| 43 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 200 | $95.00 | $105.00 | $75.00 | $120.00 |
| 44 | Detour signing (614E12420) | LS | 1 | $4,250.00 | $13,000 | $4,300.00 | $10,000 |
| 45 | Asphalt concrete for maintaining traffic (614E13000) | CY | 508 | $230.00 | $125.00 | $205.00 | $110.00 |
| 46 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $975.00 | $850.00 | $855.00 | $1,500.00 |
| 47 | Water (616E10000) | MGAL | 300 | $68.00 | $1.00 | $1.00 | $5.00 |
| 48 | Railroad flagging services (900E00100) | EACH | 15,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 49 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $3,000.00 | $6,000.00 | $5,000.00 | $2,500.00 |
| 50 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,500 | $14,000 | $14,000 | $40,000 |
| 51 | CPM progress schedule short duration projects (108E30000) | LS | 1 | $500.00 | $2,000.00 | $12,000 | $10,000 |
| 52 | Maintaining traffic (614E11000) | LS | 1 | $100,000 | $206,700 | $150,000 | $360,000 |
| 53 | Field office, type B (619E16010) | MNTH | 5 | $6,400.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 54 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 | $60,000 | $50,000 | $30,000 |
| 55 | Mobilization (624E10000) | LS | 1 | $101,000 | $150,000 | $58,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.