35 contracts let by Ohio DOT on February 19, 2026, $62,065,279 in low bids, a median of 3 bidders per contract. On the 35 with an engineer's estimate, the low bid came in under it 30 times; median low bid -15% against the estimate.

Owner
Ohio DOT
Contracts
35
Low bids, total
$62,065,279
Data through
12 NOV 2026

Contracts let that day

ContractProjectCountyBidsLow bidderLow bidSecond bidGapAgainst estimateSource
260096SUM-IR 277-03.73 (BRIDGE REPAIR)SUM4Kenmore Construction Co Inc$15,444,559$15,564,897+1.0%+4.0%ODOT
260095SAN-SR 510-00.00 Rehab (MINOR RECONSTRUCTION)SAN3Erie Blacktop Inc$5,649,088$6,022,385+7.0%-11%ODOT
260083D11-GR-FY2026 (GUARDRAIL REBUILDING)District 111Lake Erie Construction Company$4,038,120-6.0%ODOT
260109HOL-SR 179-00.00 (MINOR RECONSTRUCTION)HOL4Shelly & Sands Inc$3,057,729$3,068,9940.0%-25%ODOT
260106D07-FDPM FY26 (PAVEMENT MARKING)District 73Oglesby Construction Inc$2,634,711$2,655,000+1.0%-23%ODOT
260053D01-PM FY26 (PAVEMENT MARKING)District 13Oglesby Construction Inc$2,107,425$2,196,344+4.0%-15%ODOT
260094POR-SR 82/SR 306-02.37/00.00 (TWO LANE RESURFACING)POR5Karvo Companies Inc$2,088,525$1,787,187-14%-21%ODOT
260084D12-BH FY2026 Overlay (BRIDGE REPAIR)District 124Ohio Concrete Maintenance LLC$1,842,325$2,356,812+28%-15%ODOT
260108DEL-IR 71-SP-FY2026 (Priority) (SPOT PATCHING / PAVEMENT REPAIR)DEL3Kokosing Construction Company Inc$1,838,285$2,175,940+18%-25%ODOT
260077BRO-CR 62-00.42 (BRIDGE REPLACEMENT (1 BRIDGE))BRO4Complete General Construction Company$1,707,854$1,917,464+12%-15%ODOT
260099TUS-W. 3rd Street Bridge (BRIDGE REPAIR)TUS4Black Horse Bridge Construction Inc$1,626,062$1,904,614+17%-5.0%ODOT
260107D09-PM FY2026 (B) (PAVEMENT MARKING)District 93The Aero-Mark Company LLC$1,624,000$1,684,072+4.0%-18%ODOT
260086HAR-SR 235-02.39 (TWO LANE RESURFACING)HAR2Shelly Company$1,549,672$1,571,205+1.0%-19%ODOT
260011CUY-IR 480-18.42 Deck Sealing (BRIDGE REPAIR)CUY6Ram Construction Services of Michigan, Inc$1,392,283$1,724,170+24%-35%ODOT
260104D05-PM FY2026 (A) Fast Dry East (PAVEMENT MARKING)District 53Oglesby Construction Inc$1,296,184$1,339,000+3.0%-16%ODOT
260078CLI-SR 133-02.11 (BRIDGE REPAIR)CLI4Eagle Bridge Co$1,167,846$1,305,810+12%-17%ODOT
260092PAU-TR 33-04.75 (BRIDGE REPLACEMENT (1 BRIDGE))PAU3R G Zachrich Construction Inc$1,136,845$1,169,790+3.0%-13%ODOT
260082D10-Extrusheet Sign FY2026 (SIGNING)District 102M P Dory Co$1,072,887$1,191,350+11%-8.0%ODOT
260087JAC-SR 788-00.87 (BRIDGE REPLACEMENT (1 BRIDGE))JAC8D G M Inc$984,962$1,065,164+8.0%-15%ODOT
260101WAR-SR 73-05.88 (TWO LANE RESURFACING)WAR2Barrett Paving Materials Inc$969,995$1,043,643+8.0%-10%ODOT
260085GAL-Mercerville Shared Use Path (SIDEWALK)GAL2Parker Corporation$910,932$1,010,883+11%+9.0%ODOT
264006WAY-CULVERT FY2026 (CULVERT REPLACEMENT)WAY3Crawford Construction Company Inc$878,585$1,114,791+27%-14%ODOT
260090MOT-Trotwood Olive Rd Walks SA22 (SPOT SAFETY)MOT5Performance Site Development$828,511$844,632+2.0%-9.0%ODOT
260093PER-SR 669-00.00 (CHIP SEAL)PER2Shelly Company$820,747$931,611+14%-16%ODOT
260103D01-BM FY26 (BRIDGE REPAIR)District 14BCC Ohio Inc$815,072$872,698+7.0%-9.0%ODOT
264004LAW-SR 775-05.77 (SLIDE REPAIR)LAW3Alan Stone Co Inc$713,047$564,007-21%+26%ODOT
264005MRW-SR 95-(01.92) (03.40) (BRIDGE REPAIR)MRW2BCC Ohio Inc$686,462$897,437+31%-11%ODOT
260081CUY-SR 87-14.72 (TWO LANE RESURFACING)CUY7Ronyak Paving Inc$669,304$734,385+10%-22%ODOT
260088MEG-SR 124-09.20 (MINOR RECONSTRUCTION)MEG3Shelly Company$574,574$684,680+19%-18%ODOT
260105D06-CS-FY2026 (CRACK SEALING)District 63Scodeller Construction Inc$559,871$678,666+21%+30%ODOT
260100VAN-Fox Road Walk Connections (SIDEWALK)VAN3Oglesby Construction Inc$343,076$511,763+49%-29%ODOT
260089MOT-GMR Trail IMP CR22A (BIKEWAYS)MOT4L J Deweese Co Inc$322,529$367,505+14%-5.0%ODOT
260110PIC-US 23-18.52 (SPOT SAFETY)PIC5Shelly & Sands Inc$302,122$350,475+16%0.0%ODOT
260091MOT-Westbrook RSF 03.11 (TWO LANE RESURFACING)MOT2Barrett Paving Materials Inc$294,670$431,529+46%-28%ODOT
260102CUY-York Rd/Bennett Road (MISCELLANEOUS)CUY7V3 Construction Group LTD$116,423$122,852+6.0%-5.0%ODOT
ODOT contracts let on February 19, 2026, largest low bid first

Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy