ODOT contract 260053 bid tabulation
D01-PM FY26 (PAVEMENT MARKING). Let by Ohio DOT on February 19, 2026, District 1. 3 bids received; low bid $2,107,425 by Oglesby Construction Inc, -15% against the engineer's estimate of $2,471,000.
- Owner
- Ohio DOT
- Letting
- 19 FEB 2026
- Pay items
- 41
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Oglesby Construction Inc | $2,107,425 | Low | -15% |
| 2 | Alpha Space Control LLC | $2,196,344 | +4.0% | -11% |
| 3 | The Aero-Mark Company LLC | $2,327,000 | +10% | -6.0% |
Engineer's estimate: $2,471,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Oglesby Construction Inc | 2. Alpha Space Control LLC | 3. The Aero-Mark Company LLC |
|---|---|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 1,200 | $1.00 | $1.00 | $1.00 |
| 2 | Ground mounted support, no. 3 post (630E03100) | FT | 3,928 | $7.70 | $18.75 | $12.00 |
| 3 | Sign post reflector (630E08600) | EACH | 342 | $21.00 | $29.22 | $40.00 |
| 4 | Sign, flat sheet (630E80100) | SF | 4,241 | $14.25 | $44.25 | $16.00 |
| 5 | Removal of ground mounted sign and disposal (630E84900) | EACH | 217 | $22.00 | $35.00 | $20.00 |
| 6 | Removal of ground mounted post support and disposal (630E86002) | EACH | 282 | $16.00 | $65.00 | $20.00 |
| 7 | Edge line, 6", type 1 (642E00104) | MI | 200 | $600.00 | $745.35 | $575.00 |
| 8 | Lane line, 4", type 1 (642E00200) | MI | 10 | $100.00 | $595.65 | $225.00 |
| 10 | Lane line, 6", type 1 (642E00204) | MI | 10 | $200.00 | $615.00 | $325.00 |
| 11 | Center line, type 1 (642E00300) | MI | 100 | $305.00 | $715.95 | $450.00 |
| 12 | Channelizing line, 8", type 1 (642E00400) | FT | 30,452 | $0.40 | $0.45 | $0.40 |
| 13 | Channelizing line, 12", type 1 (642E00404) | FT | 50,374 | $0.40 | $0.59 | $0.45 |
| 14 | Stop line, type 1 (642E00500) | FT | 11,230 | $3.00 | $3.75 | $2.80 |
| 15 | Crosswalk line, 12", type 1 (642E00620) | FT | 25,978 | $1.75 | $3.35 | $1.70 |
| 16 | Crosswalk line, 24", type 1 (642E00630) | FT | 460 | $2.50 | $4.85 | $1.70 |
| 17 | Transverse/diagonal line, type 1 (642E00700) | FT | 8,460 | $2.50 | $3.65 | $1.70 |
| 18 | Chevron marking, type 1 (642E00720) | FT | 1,042 | $2.50 | $3.65 | $1.70 |
| 19 | Island marking, type 1 (642E00900) | SF | 633 | $1.00 | $3.65 | $1.00 |
| 20 | Railroad symbol marking, type 1 (642E01000) | EACH | 48 | $250.00 | $355.65 | $250.00 |
| 21 | School symbol marking, 96", type 1 (642E01110) | EACH | 16 | $250.00 | $285.35 | $250.00 |
| 22 | Lane arrow, type 1 (642E01300) | EACH | 551 | $40.00 | $69.15 | $44.00 |
| 23 | Lane reduction arrow, type 1 (642E01312) | EACH | 8 | $245.00 | $276.45 | $200.00 |
| 24 | Wrong way arrow, type 1 (642E01322) | EACH | 268 | $120.00 | $215.55 | $200.00 |
| 25 | Two way left turn arrow, type 1 (642E01352) | EACH | 21 | $50.00 | $130.35 | $80.00 |
| 26 | Word on pavement, 96", type 1 (642E01410) | EACH | 4 | $85.00 | $265.65 | $60.00 |
| 27 | Dotted line, 4", type 1 (642E01500) | FT | 3,847 | $0.40 | $0.58 | $0.44 |
| 28 | Dotted line, 6", type 1 (642E01510) | FT | 32,995 | $0.40 | $0.69 | $0.44 |
| 29 | Bike lane symbol marking, type 1 (642E01602) | EACH | 5 | $60.00 | $75.25 | $200.00 |
| 30 | Yield line, type 1 (642E20802) | FT | 320 | $3.50 | $13.65 | $4.00 |
| 31 | Removal of pavement marking (642E30000) | FT | 100 | $5.00 | $2.50 | $5.00 |
| 32 | Removal of pavement marking (642E30020) | EACH | 5 | $200.00 | $225.00 | $200.00 |
| 33 | Pavement marking, misc.: seventy two hour (72) wor (642E50010) | EACH | 8 | $500.00 | $9,500.00 | $1,000.00 |
| 34 | Pavement marking, misc.:fourteen day (14) work ord (642E50010) | EACH | 8 | $500.00 | $5,500.00 | $1,000.00 |
| 35 | Edge line, 6" (643E00104) | MI | 769 | $1,240.00 | $707.85 | $1,306.00 |
| 36 | Edge line, 6", as per plan (643E00105) | MI | 206 | $1,240.00 | $745.35 | $1,306.00 |
| 37 | Lane line, 6" (643E00204) | MI | 117 | $425.00 | $568.45 | $484.00 |
| 38 | Center line (643E00300) | MI | 401 | $725.00 | $681.25 | $901.00 |
| 39 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 40 | $80.00 | $100.00 | $60.00 |
| 40 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $10,700 | $34,000 | $10,090 |
| 41 | Maintaining traffic (614E11000) | LS | 1 | $25,000 | $13,500 | $35,250 |
| 42 | Mobilization (624E10000) | LS | 1 | $21,000 | $89,650 | $21,250 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of February 19, 2026. Compiled by Mirage Metrics.