Crawford Construction Company Inc: ODOT bid record
Crawford Construction Company Inc submitted 49 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 12 NOV 2026, and was the low bidder on 12 of them (24%). When it was not low, its total sat a median +12% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $5,120,458
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 1 | 0 | 0% |
| 2021 | 2 | 1 | 50% |
| 2022 | 1 | 0 | 0% |
| 2023 | 6 | 2 | 33% |
| 2024 | 10 | 2 | 20% |
| 2025 | 14 | 3 | 21% |
| 2026 | 15 | 4 | 27% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| WYA | 5 | 1 | 20% |
| RIC | 5 | 3 | 60% |
| ASD | 4 | 1 | 25% |
| MRW | 3 | 0 | 0% |
| ERI | 3 | 0 | 0% |
| WAY | 3 | 2 | 67% |
| OTT | 2 | 2 | 100% |
| CRA | 2 | 0 | 0% |
| SEN | 2 | 0 | 0% |
| HUR | 2 | 0 | 0% |
| KNO | 2 | 1 | 50% |
| STA | 2 | 1 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 46 | 46 (100%) | $1.00 | $1.00 |
| Repair seeding and mulching | 659E14000 | SY | 32 | 20 (63%) | $1.00 | $1.25 |
| Pavement removed | 202E23000 | SY | 38 | 17 (45%) | $14.75 | $17.00 |
| Commercial fertilizer | 659E20000 | TON | 42 | 16 (38%) | $987.50 | $850.00 |
| Inter-seeding | 659E15000 | SY | 29 | 15 (52%) | $1.00 | $1.00 |
| Embankment | 203E20000 | CY | 49 | 14 (29%) | $42.00 | $25.00 |
| Topsoil | 659E00300 | CY | 36 | 13 (36%) | $44.00 | $45.00 |
| Water | 659E35000 | MGAL | 43 | 11 (26%) | $2.60 | $1.00 |
| Subgrade compaction | 204E10000 | SY | 40 | 11 (28%) | $2.50 | $3.00 |
| Soil analysis test | 659E00100 | EACH | 24 | 11 (46%) | $100.00 | $115.50 |
| Lime | 659E31000 | ACRE | 40 | 10 (25%) | $161.00 | $150.00 |
| Excavation | 203E10000 | CY | 49 | 9 (18%) | $56.00 | $27.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Great Lakes Demolition Company | 18 | 15 of 18 |
| BCC Ohio Inc | 12 | 4 of 12 |
| Eclipse Co LLC | 9 | 0 of 9 |
| Advanced Excavating & Demolition LLC | 9 | 5 of 9 |
| Vernon Nagel Inc | 8 | 2 of 8 |
| Rietschlin Construction Inc | 8 | 1 of 8 |
| Madex Construction Co | 8 | 0 of 8 |
| Adena Corporation | 7 | 2 of 7 |
| Axis Civil Construction LLC | 6 | 4 of 6 |
| R & I Construction Inc | 5 | 1 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260505 | LOR | LOR-SR 252-03.65 (CULVERT REPLACEMENT) | 1 of 7 | $508,373 | Low, 1.0% under the second |
| 12 NOV 2026 | 260508 | RIC | RIC-SR 13-28.73 (CULVERT REPLACEMENT) | 2 of 8 | $363,195 | +2.0% |
| 29 OCT 2026 | 260476 | WOO | WOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE)) | 4 of 7 | $1,149,606 | +21% |
| 29 OCT 2026 | 264028 | HAN | HAN-SR 103-12.43 (BRIDGE REPAIR) | 2 of 4 | $593,528 | +2.0% |
| 01 OCT 2026 | 260451 | WYA | WYA-Killdeer Plains WLF (PARKING AREAS) | 7 of 8 | $438,607 | +34% |
| 17 SEP 2026 | 264022 | ASD | ASD-/WAY BH FY2027(B) (BRIDGE REPAIR) | 1 of 3 | $286,768 | Low, 2.0% under the second |
| 27 AUG 2026 | 260392 | District 3 | D03-PR FY2027 (PRUNING/OR TREE/BRUSH REMOVAL) | 4 of 5 | $169,787 | +31% |
| 27 AUG 2026 | 264021 | FRA | FRA-US 62-04.90 (CULVERT REPLACEMENT) | 2 of 2 | $584,857 | +8.0% |
| 16 JUL 2026 | 264017 | CRA | CRA-SR 100-18.38 (CULVERT REPLACEMENT) | 4 of 4 | $488,779 | +11% |
| 25 JUN 2026 | 260314 | RIC | RIC-US 42-03.22 (Lexington) (CULVERT REPLACEMENT) | 1 of 3 | $214,379 | Low, 7.0% under the second |
| 21 MAY 2026 | 264015 | WAY | WAY-SR 3-04.62/08.55/08.96/11.61 (CULVERT REPLACEMENT) | 2 of 3 | $647,464 | +6.0% |
| 07 MAY 2026 | 264012 | RIC | RIC-US 42-(06.01)(06.02) (CULVERT REPLACEMENT) | 2 of 2 | $361,843 | +16% |
| 09 APR 2026 | 260187 | WYA | WYA-Carey SRTS Phase 2 (SIDEWALK) | 5 of 6 | $366,080 | +40% |
| 19 FEB 2026 | 264006 | WAY | WAY-CULVERT FY2026 (CULVERT REPLACEMENT) | 1 of 3 | $878,585 | Low, 27% under the second |
| 15 JAN 2026 | 264002 | HOL | HOL-SR 39-00.25 (CULVERT REPLACEMENT) | 3 of 7 | $459,904 | +29% |
| 18 DEC 2025 | 254033 | KNO | KNO-SR 3-25.94 (SIDEWALK) | 1 of 3 | $154,585 | Low, 2.0% under the second |
| 23 OCT 2025 | 250510 | ERI | ERI-US 6-11.36 (PRUNING/OR TREE/BRUSH REMOVAL) | 3 of 3 | $269,607 | +50% |
| 23 OCT 2025 | 250513 | HUR | HUR-SR 303-02.42 (CULVERT REPLACEMENT) | 2 of 8 | $218,770 | +2.0% |
| 25 SEP 2025 | 254026 | SAN | SAN-SR 523-03.07 Brdg Rehab (BRIDGE REPAIR) | 2 of 4 | $771,018 | +12% |
| 11 SEP 2025 | 254023 | ASD | ASD-SR 39-05.20 (CULVERT REPLACEMENT) | 3 of 4 | $476,365 | +8.0% |
| 22 MAY 2025 | 254017 | WAY | WAY-US 250-27.50 (Culvert Replacement) | 1 of 3 | $210,450 | Low, 42% under the second |
| 24 APR 2025 | 254014 | District 5 | D05-CUL FY2025 (A) (CULVERT REPLACEMENT) | 2 of 2 | $1,073,363 | +15% |
| 10 APR 2025 | 250200 | STA | STA-Sippo Valley Trail Bridge 11 (CULVERT REPLACEMENT) | 2 of 5 | $368,958 | +12% |
| 13 FEB 2025 | 254006 | ALL | ALL-SR 117-03.47/04.64 (CULVERT REPLACEMENT) | 4 of 4 | $1,067,676 | +22% |
| 13 FEB 2025 | 254007 | ERI | ERI-/HUR-SR 113/SR 13-20.18/04.13 (CULVERT REPLACEMENT) | 2 of 2 | $583,898 | +10% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.