Crawford Construction Company Inc: ODOT bid record

Crawford Construction Company Inc submitted 49 bids on Ohio DOT contracts in the data, from 27 FEB 2020 to 12 NOV 2026, and was the low bidder on 12 of them (24%). When it was not low, its total sat a median +12% above the low bid.

Owner
Ohio DOT
Low bid volume
$5,120,458
Latest bid
12 NOV 2026
Data through
12 NOV 2026
49Bids
12Low bids
24Win rate, percent
+12%Median gap to the low bid when not low, 37 bids

By year

YearBidsLow bidsWin rate
2020100%
20212150%
2022100%
20236233%
202410220%
202514321%
202615427%
Crawford Construction Company Inc, ODOT: bids and low bids by year of letting

By county

CountyBidsLow bidsWin rate
WYA5120%
RIC5360%
ASD4125%
MRW300%
ERI300%
WAY3267%
OTT22100%
CRA200%
SEN200%
HUR200%
KNO2150%
STA2150%
Crawford Construction Company Inc, ODOT: bids and low bids by county

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion control832E30000EACH4646 (100%)$1.00$1.00
Repair seeding and mulching659E14000SY3220 (63%)$1.00$1.25
Pavement removed202E23000SY3817 (45%)$14.75$17.00
Commercial fertilizer659E20000TON4216 (38%)$987.50$850.00
Inter-seeding659E15000SY2915 (52%)$1.00$1.00
Embankment203E20000CY4914 (29%)$42.00$25.00
Topsoil659E00300CY3613 (36%)$44.00$45.00
Water659E35000MGAL4311 (26%)$2.60$1.00
Subgrade compaction204E10000SY4011 (28%)$2.50$3.00
Soil analysis test659E00100EACH2411 (46%)$100.00$115.50
Lime659E31000ACRE4010 (25%)$161.00$150.00
Excavation203E10000CY499 (18%)$56.00$27.00
Crawford Construction Company Inc, ODOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Crawford Construction Company Inc, ODOT: the firms on the same contracts most often

Latest bids

LetContractCountyProjectRankIts bidAgainst the low bid
12 NOV 2026260505LORLOR-SR 252-03.65 (CULVERT REPLACEMENT)1 of 7$508,373Low, 1.0% under the second
12 NOV 2026260508RICRIC-SR 13-28.73 (CULVERT REPLACEMENT)2 of 8$363,195+2.0%
29 OCT 2026260476WOOWOO-SR 281-11.91 Structure Repl (BRIDGE REPLACEMENT (1 BRIDGE))4 of 7$1,149,606+21%
29 OCT 2026264028HANHAN-SR 103-12.43 (BRIDGE REPAIR)2 of 4$593,528+2.0%
01 OCT 2026260451WYAWYA-Killdeer Plains WLF (PARKING AREAS)7 of 8$438,607+34%
17 SEP 2026264022ASDASD-/WAY BH FY2027(B) (BRIDGE REPAIR)1 of 3$286,768Low, 2.0% under the second
27 AUG 2026260392District 3D03-PR FY2027 (PRUNING/OR TREE/BRUSH REMOVAL)4 of 5$169,787+31%
27 AUG 2026264021FRAFRA-US 62-04.90 (CULVERT REPLACEMENT)2 of 2$584,857+8.0%
16 JUL 2026264017CRACRA-SR 100-18.38 (CULVERT REPLACEMENT)4 of 4$488,779+11%
25 JUN 2026260314RICRIC-US 42-03.22 (Lexington) (CULVERT REPLACEMENT)1 of 3$214,379Low, 7.0% under the second
21 MAY 2026264015WAYWAY-SR 3-04.62/08.55/08.96/11.61 (CULVERT REPLACEMENT)2 of 3$647,464+6.0%
07 MAY 2026264012RICRIC-US 42-(06.01)(06.02) (CULVERT REPLACEMENT)2 of 2$361,843+16%
09 APR 2026260187WYAWYA-Carey SRTS Phase 2 (SIDEWALK)5 of 6$366,080+40%
19 FEB 2026264006WAYWAY-CULVERT FY2026 (CULVERT REPLACEMENT)1 of 3$878,585Low, 27% under the second
15 JAN 2026264002HOLHOL-SR 39-00.25 (CULVERT REPLACEMENT)3 of 7$459,904+29%
18 DEC 2025254033KNOKNO-SR 3-25.94 (SIDEWALK)1 of 3$154,585Low, 2.0% under the second
23 OCT 2025250510ERIERI-US 6-11.36 (PRUNING/OR TREE/BRUSH REMOVAL)3 of 3$269,607+50%
23 OCT 2025250513HURHUR-SR 303-02.42 (CULVERT REPLACEMENT)2 of 8$218,770+2.0%
25 SEP 2025254026SANSAN-SR 523-03.07 Brdg Rehab (BRIDGE REPAIR)2 of 4$771,018+12%
11 SEP 2025254023ASDASD-SR 39-05.20 (CULVERT REPLACEMENT)3 of 4$476,365+8.0%
22 MAY 2025254017WAYWAY-US 250-27.50 (Culvert Replacement)1 of 3$210,450Low, 42% under the second
24 APR 2025254014District 5D05-CUL FY2025 (A) (CULVERT REPLACEMENT)2 of 2$1,073,363+15%
10 APR 2025250200STASTA-Sippo Valley Trail Bridge 11 (CULVERT REPLACEMENT)2 of 5$368,958+12%
13 FEB 2025254006ALLALL-SR 117-03.47/04.64 (CULVERT REPLACEMENT)4 of 4$1,067,676+22%
13 FEB 2025254007ERIERI-/HUR-SR 113/SR 13-20.18/04.13 (CULVERT REPLACEMENT)2 of 2$583,898+10%
Crawford Construction Company Inc: latest ODOT bids in the data

How this record was read

ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.

  • Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy