ODOT contract 264017 bid tabulation
CRA-SR 100-18.38 (CULVERT REPLACEMENT). Let by Ohio DOT on July 16, 2026, CRA. 4 bids received; low bid $440,509 by Great Lakes Demolition Company, -28% against the engineer's estimate of $615,000.
- Owner
- Ohio DOT
- Letting
- 16 JUL 2026
- Pay items
- 69
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Great Lakes Demolition Company | $440,509 | Low | -28% |
| 2 | BCC Ohio Inc | $471,318 | +7.0% | -23% |
| 3 | Vernon Nagel Inc | $479,071 | +9.0% | -22% |
| 4 | Crawford Construction Company Inc | $488,779 | +11% | -21% |
Engineer's estimate: $615,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Great Lakes Demolition Company | 2. BCC Ohio Inc | 3. Vernon Nagel Inc | 4. Crawford Construction Company Inc |
|---|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $200.00 | $1,032.00 | $500.00 | $1,500.00 |
| 2 | Structure removed, as per plan (202E11001) | LS | 1 | $16,500 | $14,475 | $20,000 | $36,700 |
| 3 | Pavement removed (202E23000) | SY | 193 | $30.00 | $8.89 | $18.00 | $43.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 46 | $25.00 | $12.90 | $35.00 | $16.50 |
| 5 | Guardrail removed (202E38000) | FT | 162.50 | $2.00 | $2.52 | $8.00 | $14.00 |
| 6 | Anchor assembly removed, type E (202E42010) | EACH | 3 | $200.00 | $173.25 | $250.00 | $505.00 |
| 7 | Excavation (203E10000) | CY | 201 | $20.00 | $27.46 | $28.00 | $34.00 |
| 8 | Embankment (203E20000) | CY | 182 | $25.00 | $12.90 | $28.00 | $37.50 |
| 9 | Subgrade compaction (204E10000) | SY | 203 | $5.00 | $2.58 | $6.00 | $3.74 |
| 10 | Guardrail, type MGS (606E15050) | FT | 225 | $27.00 | $25.62 | $39.00 | $31.00 |
| 11 | Guardrail, type MGS with long posts (606E15100) | FT | 37.50 | $35.00 | $34.86 | $45.00 | $38.00 |
| 12 | Anchor assembly, MGS type E(MASH 2016) (606E26150) | EACH | 3 | $3,200.00 | $2,982.00 | $3,000.00 | $3,270.00 |
| 13 | Monument assembly, type C (623E38500) | EACH | 2 | $1,420.00 | $2,325.75 | $1,200.00 | $1,728.00 |
| 14 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $1,200.00 | $1,890.00 | $2,500.00 | $863.00 |
| 15 | Post construction survey monument verification and report (623E51000) | LS | 1 | $1,200.00 | $1,890.00 | $2,500.00 | $863.00 |
| 16 | Rock channel protection, type B with filter (601E32100) | CY | 85 | $140.00 | $202.03 | $120.00 | $161.00 |
| 17 | Soil analysis test (659E00100) | EACH | 2 | $100.00 | $62.10 | $250.00 | $50.00 |
| 18 | Topsoil (659E00300) | CY | 62 | $35.00 | $73.35 | $45.00 | $73.00 |
| 19 | Seeding and mulching (659E10000) | SY | 555 | $5.00 | $2.73 | $6.50 | $6.60 |
| 20 | Repair seeding and mulching (659E14000) | SY | 28 | $1.00 | $2.73 | $5.00 | $1.00 |
| 21 | Inter-seeding (659E15000) | SY | 28 | $1.00 | $0.63 | $4.00 | $1.00 |
| 22 | Commercial fertilizer (659E20000) | TON | 0.07 | $800.00 | $840.00 | $900.00 | $650.00 |
| 23 | Lime (659E31000) | ACRE | 0.11 | $1,000.00 | $1.09 | $1,800.00 | $50.00 |
| 24 | Water (659E35000) | MGAL | 3.08 | $1.00 | $0.20 | $25.00 | $7.00 |
| 25 | Slope erosion protection mat, type C (670E00530) | SY | 232 | $5.00 | $2.10 | $8.00 | $5.20 |
| 26 | Erosion control (832E30000) | EACH | 5,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | 12" conduit, type C (611E04600) | FT | 11 | $100.00 | $138.65 | $85.00 | $110.00 |
| 28 | 24" conduit, type C (611E10600) | FT | 36 | $100.00 | $176.58 | $140.00 | $115.00 |
| 29 | 10' X 6' conduit, type A, 706.05 (611E95200) | FT | 54 | $1,400.00 | $1,747.31 | $1,600.00 | $1,378.00 |
| 30 | Catch basin, no. 5 (611E98300) | EACH | 2 | $4,200.00 | $8,604.00 | $5,000.00 | $3,960.00 |
| 31 | Pavement planing, asphalt concrete (3.0") (254E01000) | SY | 100 | $70.00 | $26.25 | $95.00 | $34.50 |
| 32 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 33 | $560.00 | $472.50 | $450.00 | $488.00 |
| 33 | Aggregate base (304E20000) | CY | 72 | $80.00 | $127.69 | $65.00 | $138.00 |
| 34 | Tack coat (407E10000) | GAL | 15 | $8.00 | $1.05 | $8.00 | $11.00 |
| 35 | Prime coat, as per plan (408E10001) | GAL | 46 | $12.00 | $21.00 | $12.00 | $17.00 |
| 36 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E22001) | CY | 26 | $670.00 | $651.00 | $550.00 | $586.00 |
| 37 | RPM (621E00100) | EACH | 2 | $1,580.00 | $264.00 | $150.00 | $1,800.00 |
| 38 | Raised pavement marker removed (621E54000) | EACH | 2 | $50.00 | $12.90 | $50.00 | $120.00 |
| 39 | Barrier reflector, type 2 (bidirectional) (626E00110) | EACH | 8 | $15.00 | $15.75 | $40.00 | $21.00 |
| 40 | Removal of ground mounted sign and reerection (630E85100) | EACH | 4 | $350.00 | $309.75 | $400.00 | $173.00 |
| 41 | Edge line, 6", type 1 (642E00104) | MI | 0.29 | $6,000.00 | $525.00 | $6,500.00 | $5,750.00 |
| 42 | Center line, type 1 (642E00300) | MI | 0.01 | $60,000 | $307,314 | $50,000 | $57,500 |
| 43 | Stop line, type 1 (642E00500) | FT | 24 | $12.00 | $5.25 | $12.00 | $11.50 |
| 44 | Work zone impact attenuator, 24" wide hazards, (bidirectional) (614E12384) | EACH | 2 | $2,800.00 | $2,238.75 | $8,500.00 | $2,800.00 |
| 45 | Detour signing (614E12420) | LS | 1 | $6,500.00 | $5,730.00 | $7,500.00 | $6,300.00 |
| 46 | Barrier reflector, type 1 (one-way) (614E13310) | EACH | 6 | $30.00 | $13.00 | $40.00 | $29.00 |
| 47 | Object marker, one way (614E13350) | EACH | 6 | $30.00 | $22.72 | $75.00 | $29.00 |
| 48 | Work zone center line, class I, 740.06, type I (614E21200) | MI | 0.19 | $20,000 | $14,775 | $15,000 | $17,250 |
| 49 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 0.05 | $25,000 | $10,357 | $7,000.00 | $23,000 |
| 50 | Work zone stop line, class I, 740.06, type I (614E26400) | FT | 25 | $30.00 | $6.49 | $15.00 | $11.50 |
| 51 | Pavement for maintaining traffic, class B (615E25000) | SY | 90 | $80.00 | $140.85 | $70.00 | $112.00 |
| 52 | Portable barrier, unanchored (622E41100) | FT | 284 | $35.00 | $22.81 | $45.00 | $69.00 |
| 53 | Cofferdams and excavation bracing (503E11100) | LS | 1 | $12,500 | $11,678 | $15,000 | $5,500.00 |
| 54 | Unclassified excavation (503E21300) | LS | 1 | $8,500.00 | $1,238.40 | $15,000 | $25,000 |
| 55 | Epoxy coated steel reinforcement (509E10000) | LB | 4,267 | $3.00 | $2.23 | $2.20 | $3.10 |
| 56 | Class QC1 concrete, retaining/wingwall not including footing (511E46010) | CY | 15 | $850.00 | $1,746.09 | $1,500.00 | $1,150.00 |
| 57 | Class QC1 concrete, footing (511E46510) | CY | 29 | $650.00 | $1,243.56 | $1,200.00 | $1,200.00 |
| 58 | Class QC1 concrete, headwall (511E46610) | CY | 2 | $1,100.00 | $1,775.63 | $2,000.00 | $1,600.00 |
| 59 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 48 | $40.00 | $41.97 | $35.00 | $46.00 |
| 60 | Type 2 waterproofing (512E33000) | SY | 93 | $40.00 | $36.90 | $28.00 | $46.00 |
| 61 | Type 3 waterproofing (512E33010) | SY | 82 | $50.00 | $78.30 | $32.00 | $100.00 |
| 62 | 1" preformed expansion joint filler (516E13600) | SF | 29 | $20.00 | $11.88 | $25.00 | $17.00 |
| 63 | Porous backfill with geotextile fabric (518E21230) | LS | 1 | $8,500.00 | $3,306.00 | $12,000 | $2,170.00 |
| 64 | Concrete masonry (602E20000) | CY | 0.67 | $2,000.00 | $2,843.28 | $1,200.00 | $3,160.00 |
| 65 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $5,100.00 | $5,818.71 | $8,000.00 | $4,930.00 |
| 66 | Maintaining traffic (614E11000) | LS | 1 | $15,000 | $36,441 | $30,000 | $19,325 |
| 67 | Field office, type B (619E16010) | MNTH | 7 | $500.00 | $3,116.14 | $250.00 | $500.00 |
| 68 | Construction layout stakes and surveying (623E10000) | LS | 1 | $8,500.00 | $3,600.00 | $5,000.00 | $7,200.00 |
| 69 | Mobilization (624E10000) | LS | 1 | $60,000 | $14,302 | $23,000 | $31,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 16, 2026. Compiled by Mirage Metrics.