17 contracts let by Ohio DOT on July 16, 2026, $34,698,423 in low bids, a median of 2 bidders per contract. On the 16 with an engineer's estimate, the low bid came in under it 9 times; median low bid -1.0% against the estimate.
- Owner
- Ohio DOT
- Contracts
- 17
- Low bids, total
- $34,698,423
- Data through
- 12 NOV 2026
Contracts let that day
| Contract | Project | County | Bids | Low bidder | Low bid | Second bid | Gap | Against estimate | Source |
|---|---|---|---|---|---|---|---|---|---|
| 260328 | CUY-/GEA BH FY2027 Misc (PART 1 AND PART 2) (BRIDGE REPAIR) | CUY | 4 | Fechko Excavating LLC | $8,838,828 | $9,452,324 | +7.0% | -20% | ODOT |
| 260326 | COS-/TUS-SR 93/SR 651-11.96/00.00 (TWO LANE RESURFACING) | COS | 2 | Shelly Company | $4,745,815 | $5,510,272 | +16% | -7.0% | ODOT |
| 260306 | BUT-/WAR-IR 75-07.04/00.00 Long Jts | BUT | 2 | Barrett Paving Materials Inc | $4,605,676 | $6,846,717 | +49% | ODOT | |
| 260331 | ROS-US 35-04.48 (FOUR LANE RESURFACING) | ROS | 2 | Shelly & Sands Inc | $3,893,340 | $3,999,453 | +3.0% | +13% | ODOT |
| 260339 | FRA-IR 270/SR 665-SP-FY2027 (CONCRETE) (SPOT PATCHING / PAVEMENT REPAIR) | FRA | 2 | Shelly & Sands Inc | $1,965,112 | $1,996,586 | +2.0% | +17% | ODOT |
| 260329 | D08-PM Bridge FY27 (BRIDGE REPAIR) | District 8 | 7 | BCC Ohio Inc | $1,950,457 | $2,248,159 | +15% | -21% | ODOT |
| 260335 | D02-LG FY2027 (LIGHTING) | District 2 | 2 | J Ranck Electric Inc | $1,699,995 | $1,853,762 | +9.0% | +32% | ODOT |
| 260336 | D05-GR FY2027 (Ding N Dent) (GUARDRAIL REBUILDING) | District 5 | 2 | Lake Erie Construction Company | $1,177,325 | $1,296,346 | +10% | -1.0% | ODOT |
| 260325 | BRO-SR 125-16.17 (MICROSURFACING) | BRO | 1 | Strawser Construction Inc | $989,274 | +19% | ODOT | ||
| 260330 | NOB-CR 16-00.00 (TWO LANE RESURFACING) | NOB | 3 | Saorsa Construction Ohio, Inc. | $932,303 | $950,160 | +2.0% | +3.0% | ODOT |
| 260338 | D11-LG-FY2027 (LIGHTING) | District 11 | 1 | Cornerstone Electric Inc | $781,876 | -2.0% | ODOT | ||
| 260337 | D09-DS-FY2027 (BRIDGE REPAIR) | District 9 | 3 | Twin Rivers Construction Co | $773,726 | $824,330 | +7.0% | -31% | ODOT |
| 260340 | HAM-IR 275-23.38L (BRIDGE REPAIR) | HAM | 2 | Vimas Painting Company Inc | $723,230 | $744,567 | +3.0% | +61% | ODOT |
| 264017 | CRA-SR 100-18.38 (CULVERT REPLACEMENT) | CRA | 4 | Great Lakes Demolition Company | $440,509 | $471,318 | +7.0% | -28% | ODOT |
| 260334 | D01-RPM FY27 (RAISED PAVEMENT MARKERS) | District 1 | 3 | W L Markers Inc | $428,845 | $455,288 | +6.0% | -12% | ODOT |
| 260333 | TRU-SR 46-00.50 (Sidewalks) (SIDEWALK) | TRU | 4 | Foust Construction Inc | $383,648 | $388,800 | +1.0% | -4.0% | ODOT |
| 264018 | MRG-SR 669-02.09 (CULVERT REPLACEMENT) | MRG | 4 | Alan Stone Co Inc | $368,465 | $406,919 | +10% | +2.0% | ODOT |
Gap is the second bid over the low bid. Where a contract shows fewer bids than ODOT received, the others did not match their published totals and are left out. Each contract number opens its full bid tabulation.