ODOT contract 260337 bid tabulation
D09-DS-FY2027 (BRIDGE REPAIR). Let by Ohio DOT on July 16, 2026, District 9. 3 bids received; low bid $773,726 by Twin Rivers Construction Co, -31% against the engineer's estimate of $1,126,000.
- Owner
- Ohio DOT
- Letting
- 16 JUL 2026
- Pay items
- 115
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Twin Rivers Construction Co | $773,726 | Low | -31% |
| 2 | Aad Contracting Inc | $824,330 | +7.0% | -27% |
| 3 | BCC Ohio Inc | $1,122,216 | +45% | 0.0% |
Engineer's estimate: $1,126,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Twin Rivers Construction Co | 2. Aad Contracting Inc | 3. BCC Ohio Inc |
|---|---|---|---|---|---|---|
| 1 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 2 | Edge line, 6", type 1 (642E00104) | MI | 4.20 | $3,845.00 | $2,000.00 | $4,299.75 |
| 3 | Lane line, 6", type 1 (642E00204) | MI | 1.58 | $2,655.00 | $1,200.00 | $9,712.50 |
| 4 | Center line, type 1 (642E00300) | MI | 0.67 | $4,820.00 | $2,400.00 | $3,990.00 |
| 5 | Channelizing line, 8", type 1 (642E00400) | FT | 559 | $1.50 | $1.50 | $3.68 |
| 6 | Transverse/diagonal line, type 1 (642E00700) | FT | 516 | $6.50 | $3.00 | $5.78 |
| 7 | Lane arrow, type 1 (642E01300) | EACH | 2 | $150.00 | $150.00 | $262.50 |
| 8 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $100.00 | $10.00 | $93.45 |
| 9 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 96 | $16.00 | $18.00 | $58.30 |
| 10 | Treating of concrete bridge deck with SRS (512E10400) | SY | 952 | $7.00 | $7.20 | $7.70 |
| 11 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 37 | $25.00 | $45.00 | $23.66 |
| 12 | Removal of existing pavement marking (512E74500) | FT | 662 | $0.75 | $3.00 | $2.03 |
| 13 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 96 | $16.00 | $18.00 | $58.30 |
| 14 | Treating of concrete bridge deck with SRS (512E10400) | SY | 952 | $7.00 | $8.10 | $7.70 |
| 15 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 37 | $25.00 | $27.00 | $23.66 |
| 16 | Removal of existing pavement marking (512E74500) | FT | 662 | $0.75 | $0.70 | $2.03 |
| 17 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 272 | $16.00 | $18.00 | $58.60 |
| 18 | Treating of concrete bridge deck with SRS (512E10400) | SY | 2,714 | $7.00 | $8.10 | $7.70 |
| 19 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 60 | $25.00 | $27.00 | $23.66 |
| 20 | Removal of existing pavement marking (512E74500) | FT | 962 | $0.75 | $0.70 | $2.03 |
| 21 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 118 | $16.00 | $18.00 | $58.34 |
| 22 | Treating of concrete bridge deck with SRS (512E10400) | SY | 1,171 | $7.00 | $8.10 | $7.70 |
| 23 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 66 | $25.00 | $27.00 | $23.66 |
| 24 | Removal of existing pavement marking (512E74500) | FT | 785 | $0.75 | $0.70 | $2.03 |
| 25 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 109 | $16.00 | $18.00 | $58.35 |
| 26 | Treating of concrete bridge deck with SRS (512E10400) | SY | 1,082 | $7.00 | $8.10 | $7.70 |
| 27 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 61 | $25.00 | $27.00 | $23.66 |
| 28 | Removal of existing pavement marking (512E74500) | FT | 726 | $0.75 | $0.70 | $2.03 |
| 29 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 142 | $16.00 | $18.00 | $58.71 |
| 30 | Treating of concrete bridge deck with SRS (512E10400) | SY | 1,420 | $7.00 | $8.10 | $7.70 |
| 31 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 55 | $25.00 | $27.00 | $23.66 |
| 32 | Removal of existing pavement marking (512E74500) | FT | 987 | $0.75 | $0.70 | $2.03 |
| 33 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 142 | $16.00 | $18.00 | $58.71 |
| 34 | Treating of concrete bridge deck with SRS (512E10400) | SY | 1,420 | $7.00 | $8.10 | $7.70 |
| 35 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 55 | $25.00 | $27.00 | $23.66 |
| 36 | Removal of existing pavement marking (512E74500) | FT | 987 | $0.75 | $0.70 | $2.03 |
| 37 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 102 | $16.00 | $18.00 | $58.62 |
| 38 | Treating of concrete bridge deck with SRS (512E10400) | SY | 1,018 | $7.00 | $8.10 | $7.70 |
| 39 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 40 | $25.00 | $27.00 | $23.66 |
| 40 | Removal of existing pavement marking (512E74500) | FT | 708 | $0.75 | $0.70 | $2.03 |
| 41 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 88 | $16.00 | $18.00 | $58.49 |
| 42 | Treating of concrete bridge deck with SRS (512E10400) | SY | 876 | $7.10 | $8.10 | $7.70 |
| 43 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 34 | $30.00 | $27.00 | $23.66 |
| 44 | Removal of existing pavement marking (512E74500) | FT | 609 | $0.75 | $0.70 | $2.03 |
| 45 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 85 | $16.00 | $18.00 | $58.65 |
| 46 | Treating of concrete bridge deck with SRS (512E10400) | SY | 849 | $7.10 | $8.10 | $7.70 |
| 47 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 33 | $30.00 | $27.00 | $23.66 |
| 48 | Removal of existing pavement marking (512E74500) | FT | 591 | $0.75 | $0.70 | $2.03 |
| 49 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 85 | $16.00 | $18.00 | $58.65 |
| 50 | Treating of concrete bridge deck with SRS (512E10400) | SY | 849 | $7.10 | $8.10 | $7.70 |
| 51 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 33 | $30.00 | $27.00 | $23.66 |
| 52 | Removal of existing pavement marking (512E74500) | FT | 591 | $0.75 | $0.70 | $2.03 |
| 53 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 90 | $16.00 | $18.00 | $58.66 |
| 54 | Treating of concrete bridge deck with SRS (512E10400) | SY | 899 | $7.10 | $8.10 | $7.70 |
| 55 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 35 | $35.00 | $27.00 | $23.66 |
| 56 | Removal of existing pavement marking (512E74500) | FT | 625 | $0.75 | $0.70 | $2.03 |
| 57 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 90 | $16.00 | $18.00 | $58.66 |
| 58 | Treating of concrete bridge deck with SRS (512E10400) | SY | 899 | $7.10 | $8.10 | $7.70 |
| 59 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 35 | $35.00 | $27.00 | $23.66 |
| 60 | Removal of existing pavement marking (512E74500) | FT | 625 | $0.75 | $0.70 | $2.03 |
| 61 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 111 | $16.00 | $18.00 | $58.40 |
| 62 | Treating of concrete bridge deck with SRS (512E10400) | SY | 1,103 | $7.00 | $8.10 | $7.70 |
| 63 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 41 | $30.00 | $27.00 | $23.66 |
| 64 | Removal of existing pavement marking (512E74500) | FT | 726 | $0.75 | $0.70 | $2.03 |
| 65 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 59 | $16.75 | $18.00 | $57.96 |
| 66 | Treating of concrete bridge deck with SRS (512E10400) | SY | 581 | $8.00 | $8.10 | $7.70 |
| 67 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 24 | $40.00 | $27.00 | $23.66 |
| 68 | Removal of existing pavement marking (512E74500) | FT | 428 | $0.75 | $0.70 | $2.03 |
| 69 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 50 | $16.75 | $18.00 | $58.61 |
| 70 | Treating of concrete bridge deck with SRS (512E10400) | SY | 499 | $8.00 | $8.10 | $7.70 |
| 71 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 21 | $40.00 | $27.00 | $23.66 |
| 72 | Removal of existing pavement marking (512E74500) | FT | 368 | $0.75 | $0.70 | $2.03 |
| 73 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 46 | $16.00 | $18.00 | $57.97 |
| 74 | Treating of concrete bridge deck with SRS (512E10400) | SY | 453 | $8.00 | $8.10 | $7.70 |
| 75 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 16 | $40.00 | $27.00 | $23.66 |
| 76 | Removal of existing pavement marking (512E74500) | FT | 278 | $0.75 | $0.70 | $2.03 |
| 77 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 46 | $16.00 | $18.00 | $57.97 |
| 78 | Treating of concrete bridge deck with SRS (512E10400) | SY | 453 | $8.00 | $8.10 | $7.70 |
| 79 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 16 | $40.00 | $27.00 | $23.66 |
| 80 | Removal of existing pavement marking (512E74500) | FT | 278 | $0.75 | $0.70 | $2.03 |
| 81 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 821 | $16.00 | $18.00 | $58.68 |
| 82 | Treating of concrete bridge deck with SRS (512E10400) | SY | 8,204 | $6.85 | $8.10 | $7.70 |
| 83 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 139 | $25.00 | $27.00 | $23.66 |
| 84 | Removal of existing pavement marking (512E74500) | FT | 4,978 | $0.75 | $0.70 | $2.03 |
| 85 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 879 | $16.00 | $18.00 | $58.70 |
| 86 | Treating of concrete bridge deck with SRS (512E10400) | SY | 8,788 | $6.85 | $8.10 | $7.70 |
| 87 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 149 | $25.00 | $27.00 | $23.66 |
| 88 | Removal of existing pavement marking (512E74500) | FT | 5,332 | $0.75 | $0.70 | $2.03 |
| 89 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 465 | $16.00 | $18.00 | $58.68 |
| 90 | Treating of concrete bridge deck with SRS (512E10400) | SY | 4,647 | $6.85 | $8.10 | $7.70 |
| 91 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 79 | $30.00 | $27.00 | $23.66 |
| 92 | Removal of existing pavement marking (512E74500) | FT | 2,820 | $0.75 | $0.70 | $2.03 |
| 93 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 125 | $16.00 | $18.00 | $58.71 |
| 94 | Treating of concrete bridge deck with SRS (512E10400) | SY | 1,250 | $7.10 | $8.10 | $7.70 |
| 95 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 23 | $40.00 | $27.00 | $23.66 |
| 96 | Removal of existing pavement marking (512E74500) | FT | 816 | $0.75 | $0.70 | $2.03 |
| 97 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 153 | $16.00 | $18.00 | $58.55 |
| 98 | Treating of concrete bridge deck with SRS (512E10400) | SY | 1,525 | $7.10 | $8.10 | $7.70 |
| 99 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 28 | $40.00 | $27.00 | $23.66 |
| 100 | Removal of existing pavement marking (512E74500) | FT | 904 | $0.75 | $0.70 | $2.03 |
| 101 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 212 | $16.00 | $18.00 | $58.50 |
| 102 | Treating of concrete bridge deck with SRS (512E10400) | SY | 2,111 | $7.00 | $8.10 | $7.70 |
| 103 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 43 | $30.00 | $27.00 | $23.66 |
| 104 | Removal of existing pavement marking (512E74500) | FT | 1,524 | $0.75 | $0.07 | $2.03 |
| 105 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 502 | $16.00 | $18.00 | $58.71 |
| 106 | Treating of concrete bridge deck with SRS (512E10400) | SY | 5,020 | $6.85 | $8.10 | $7.70 |
| 107 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 260 | $25.00 | $27.00 | $23.66 |
| 108 | Removal of existing pavement marking (512E74500) | FT | 4,674 | $0.75 | $0.70 | $2.03 |
| 109 | Sealing concrete bridge decks with HMWM resin, as per plan (512E10301) | SY | 460 | $16.00 | $18.00 | $58.64 |
| 110 | Treating of concrete bridge deck with SRS (512E10400) | SY | 4,593 | $6.85 | $8.10 | $7.70 |
| 111 | Removal of existing coatings from concrete surfaces (512E74000) | SY | 99 | $25.00 | $27.00 | $23.66 |
| 112 | Removal of existing pavement marking (512E74500) | FT | 2,362 | $0.75 | $0.70 | $2.03 |
| 113 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $18,000 | $20,000 | $3,335.43 |
| 114 | Maintaining traffic (614E11000) | LS | 1 | $85,000 | $164,000 | $158,360 |
| 115 | Mobilization (624E10000) | LS | 1 | $100,000 | $20,000 | $65,993 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of July 16, 2026. Compiled by Mirage Metrics.