Cornerstone Electric Inc: ODOT bid record
Cornerstone Electric Inc submitted 52 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 43 of them (83%). When it was not low, its total sat a median +10% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $29,186,069
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 11 | 8 | 73% |
| 2021 | 3 | 2 | 67% |
| 2022 | 8 | 6 | 75% |
| 2023 | 8 | 7 | 88% |
| 2024 | 11 | 10 | 91% |
| 2025 | 7 | 7 | 100% |
| 2026 | 4 | 3 | 75% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| MAH | 9 | 7 | 78% |
| District 4 | 8 | 6 | 75% |
| District 11 | 8 | 8 | 100% |
| LOR | 4 | 4 | 100% |
| TRU | 3 | 3 | 100% |
| BEL | 3 | 2 | 67% |
| COL | 3 | 3 | 100% |
| District 3 | 3 | 2 | 67% |
| District 12 | 2 | 1 | 50% |
| ATB | 2 | 2 | 100% |
| GUE | 1 | 1 | 100% |
| District 5 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 42 | 42 (100%) | $1.00 | $1.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 46 | 27 (59%) | $65.00 | $80.00 |
| Ground rod | 625E32000 | EACH | 37 | 17 (46%) | $200.00 | $285.00 |
| Luminaire, conventional, solid state (LED), as per plan | 625E26253 | EACH | 44 | 16 (36%) | $442.50 | $500.00 |
| Trench | 625E29000 | FT | 31 | 15 (48%) | $7.00 | $12.00 |
| No. 4 AWG 2400 volt distribution cable | 625E23200 | FT | 20 | 14 (70%) | $2.50 | $3.58 |
| 1-1/2" duct cable with three no. 4 AWG 2400 volt cables | 625E24320 | FT | 16 | 13 (81%) | $8.12 | $11.58 |
| Field office, type B | 619E16010 | MNTH | 20 | 10 (50%) | $1,000.00 | $2,000.00 |
| Underground warning/marking tape, as per plan | 625E36011 | FT | 17 | 9 (53%) | $0.50 | $1.00 |
| Stop line radar detection, as per plan | 809E69101 | EACH | 13 | 9 (69%) | $8,200.00 | $8,500.00 |
| Conduit, 3", 725.04 | 625E25500 | FT | 20 | 8 (40%) | $26.00 | $35.00 |
| Light pole removed | 625E75400 | EACH | 11 | 8 (73%) | $150.00 | $350.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Perram Electric Inc | 42 | 4 of 42 |
| Miller Cable Company | 32 | 1 of 32 |
| Ruhlin Company | 12 | 2 of 12 |
| Asplundh Construction LLC | 10 | 2 of 10 |
| Shelly Company | 9 | 0 of 9 |
| S E T Inc | 8 | 1 of 8 |
| Complete General Construction Company | 8 | 2 of 8 |
| J Ranck Electric Inc | 5 | 1 of 5 |
| Central-Allied Enterprises Inc | 5 | 2 of 5 |
| Greenwich Electric Inc | 5 | 1 of 5 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260495 | COL | COL-SR 9-15.244 (SIGNALIZATION) | 1 of 3 | $108,791 | Low, 23% under the second |
| 16 JUL 2026 | 260338 | District 11 | D11-LG-FY2027 (LIGHTING) | 1 of 1 | $781,876 | Low |
| 25 JUN 2026 | 260321 | MAH | MAH-LG FY2027 (LIGHTING) | 1 of 4 | $1,026,569 | Low, 35% under the second |
| 09 APR 2026 | 260172 | District 4 | D04-TSG FY2026 (SIGNALIZATION) | 2 of 5 | $604,955 | +2.0% |
| 18 DEC 2025 | 250598 | TRU | TRU-US 422-08.01 (SIGNALIZATION) | 1 of 6 | $204,472 | Low, 2.0% under the second |
| 11 SEP 2025 | 250423 | District 4 | D04-LG FY2026 (West) (LIGHTING) | 1 of 1 | $1,758,818 | Low |
| 31 JUL 2025 | 250368 | ATB | ATB-LG FY2026 (SIGNALIZATION) | 1 of 4 | $467,436 | Low, 20% under the second |
| 08 MAY 2025 | 250243 | COL | COL-Salem Signals Upgrades (SIGNALIZATION) | 1 of 2 | $506,424 | Low, 4.0% under the second |
| 08 MAY 2025 | 250244 | District 3 | D03-TSG FY2025(B) (SIGNALIZATION) | 1 of 3 | $1,247,324 | Low, 0.0% under the second |
| 08 MAY 2025 | 250256 | MAH | MAH-SR 7-10.25 (INTERSECTION) | 1 of 2 | $527,294 | Low, 31% under the second |
| 30 JAN 2025 | 250055 | LOR | LOR-IR 90-20.20 (LIGHTING) | 1 of 4 | $298,474 | Low, 2.0% under the second |
| 19 DEC 2024 | 240595 | District 3 | D03-TSG FY2025 (M) (SIGNALIZATION) | 3 of 5 | $184,176 | +19% |
| 17 OCT 2024 | 240462 | COS | COS-CR 271-06.26 (SIGNALIZATION) | 1 of 9 | $428,712 | Low, 7.0% under the second |
| 17 OCT 2024 | 240472 | MED | MED-IR 76-11.83 (LIGHTING) | 1 of 7 | $295,341 | Low, 18% under the second |
| 26 SEP 2024 | 240454 | District 3 | D03-LG FY2025(A) (LIGHTING) | 1 of 6 | $95,518 | Low, 18% under the second |
| 22 AUG 2024 | 240410 | District 4 | D04-LG FY2025 (East) (LIGHTING) | 1 of 1 | $692,831 | Low |
| 22 AUG 2024 | 240411 | District 11 | D11-LG-FY2025 (LIGHTING) | 1 of 2 | $635,907 | Low, 35% under the second |
| 11 JUL 2024 | 240369 | LOR | LOR-TSG FY2025(B) (SIGNALIZATION) | 1 of 4 | $215,869 | Low, 9.0% under the second |
| 27 JUN 2024 | 240358 | TRU | TRU-LG FY2025 (LIGHTING) | 1 of 5 | $1,381,821 | Low, 10% under the second |
| 09 MAY 2024 | 240265 | District 4 | D04-TSG FY2024 (SIGNALIZATION) | 1 of 3 | $399,980 | Low, 15% under the second |
| 21 MAR 2024 | 240166 | COL | COL-SR 170-00.13 (LIGHTING) | 1 of 4 | $640,437 | Low, 4.0% under the second |
| 11 JAN 2024 | 240030 | CUY | CUY-IR 90-11.33 Ramp Safety (SIGNALIZATION) | 1 of 4 | $190,000 | Low, 12% under the second |
| 14 DEC 2023 | 230595 | District 10 | D10-Lighting FY2024 (LIGHTING) | 2 of 5 | $1,217,601 | +4.0% |
| 30 NOV 2023 | 230570 | LAK | LAK-SR 84-02.07 Signals (INTERSECTION) | 1 of 6 | $317,307 | Low, 7.0% under the second |
| 30 NOV 2023 | 230585 | LOR | LOR-SR 2-01.51 (LIGHTING) | 1 of 6 | $312,196 | Low, 12% under the second |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.