ODOT contract 260172 bid tabulation
D04-TSG FY2026 (SIGNALIZATION). Let by Ohio DOT on April 9, 2026, District 4. 5 bids received; low bid $591,998 by TC Randel Constructon LLC, +1.9% against the engineer's estimate of $581,000.
- Owner
- Ohio DOT
- Letting
- 09 APR 2026
- Pay items
- 51
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | TC Randel Constructon LLC | $591,998 | Low | +2.0% |
| 2 | Cornerstone Electric Inc | $604,955 | +2.0% | +4.0% |
| 3 | Perram Electric Inc | $675,895 | +14% | +16% |
| 4 | S E T Inc | $698,000 | +18% | +20% |
| 5 | Miller Cable Company | $700,158 | +18% | +21% |
Engineer's estimate: $581,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. TC Randel Constructon LLC | 2. Cornerstone Electric Inc | 3. Perram Electric Inc | 4. S E T Inc | 5. Miller Cable Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Walk removed (202E30000) | SF | 120 | $8.00 | $20.00 | $20.00 | $7.00 | $35.00 |
| 2 | Curb ramp, as per plan (608E52001) | SF | 105 | $32.00 | $60.00 | $60.00 | $50.00 | $85.00 |
| 3 | Special - as-built construction plans (690E91000) | LS | 1 | $1,500.00 | $500.00 | $2,810.00 | $2,000.00 | $2,500.00 |
| 4 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 5 | 4" conduit, type E (611E00400) | FT | 30 | $8.00 | $12.00 | $10.05 | $15.00 | $6.00 |
| 6 | Stop line (643E00500) | FT | 24 | $30.00 | $18.00 | $25.00 | $105.00 | $95.00 |
| 7 | Crosswalk line, 24" (646E10520) | FT | 234 | $16.00 | $15.00 | $15.00 | $16.00 | $41.00 |
| 8 | Removal of pavement marking (646E50100) | FT | 191 | $9.00 | $10.00 | $8.00 | $5.00 | $32.00 |
| 9 | Bracket arm, 20' (625E18400) | EACH | 2 | $1,700.00 | $1,500.00 | $1,450.00 | $2,300.00 | $1,800.00 |
| 10 | Conduit, 3", 725.04 (625E25500) | FT | 180 | $25.00 | $35.00 | $46.55 | $33.00 | $31.00 |
| 11 | Conduit, jacked or drilled, 725.04, 4" (625E25902) | FT | 417 | $101.00 | $75.00 | $117.00 | $78.00 | $76.00 |
| 12 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 2 | $475.00 | $500.00 | $421.50 | $570.00 | $500.00 |
| 13 | Trench (625E29000) | FT | 16 | $30.00 | $50.00 | $12.60 | $30.00 | $15.00 |
| 14 | Trench in paved area (625E29400) | FT | 164 | $50.00 | $95.00 | $31.70 | $135.00 | $39.00 |
| 15 | Pull box, 725.08, 24" (625E30706) | EACH | 9 | $985.00 | $1,500.00 | $2,283.00 | $1,200.00 | $1,500.00 |
| 16 | Pull box removed (625E31510) | EACH | 4 | $200.00 | $250.00 | $200.00 | $120.00 | $300.00 |
| 17 | Ground rod (625E32000) | EACH | 10 | $150.00 | $200.00 | $326.00 | $240.00 | $275.00 |
| 18 | Underground warning/marking tape, as per plan (625E36011) | FT | 180 | $2.00 | $2.00 | $0.40 | $2.00 | $3.00 |
| 19 | Arc flash calculations and label (meadowbrook, wil (625E76000) | EACH | 3 | $3,650.00 | $500.00 | $1,500.00 | $1,200.00 | $3,650.00 |
| 20 | Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate (632E05006) | EACH | 26 | $805.00 | $900.00 | $896.00 | $1,200.00 | $1,500.00 |
| 21 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 10 | $550.00 | $650.00 | $492.00 | $670.00 | $800.00 |
| 22 | Covering of vehicular signal head (632E25000) | EACH | 26 | $25.00 | $25.00 | $20.00 | $50.00 | $50.00 |
| 23 | Covering of pedestrian signal head (632E25010) | EACH | 10 | $15.00 | $25.00 | $10.00 | $40.00 | $40.00 |
| 24 | Pedestrian pushbutton (632E26000) | EACH | 10 | $375.00 | $250.00 | $342.00 | $250.00 | $265.00 |
| 25 | Signal cable, 3 conductor, no. 14 AWG (632E40300) | FT | 1,567 | $2.00 | $3.00 | $2.70 | $2.00 | $2.65 |
| 26 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,567 | $2.50 | $3.50 | $3.30 | $3.00 | $3.15 |
| 27 | Signal cable, 7 conductor, no. 14 AWG (632E40700) | FT | 2,444 | $3.25 | $4.00 | $3.90 | $3.00 | $3.50 |
| 28 | Signal support foundation (632E64010) | EACH | 7 | $5,800.00 | $9,000.00 | $7,280.00 | $8,200.00 | $7,050.00 |
| 29 | Pedestal foundation (632E64020) | EACH | 8 | $900.00 | $1,000.00 | $1,605.00 | $950.00 | $1,350.00 |
| 30 | Power cable, 3 conductor, no. 4 AWG (632E69300) | FT | 90 | $6.00 | $6.00 | $8.45 | $10.00 | $14.00 |
| 31 | Power service, as per plan (632E70001) | EACH | 3 | $2,200.00 | $5,000.00 | $3,205.00 | $4,000.00 | $2,700.00 |
| 32 | Signal support, type TC-12.31 design 6 pole, with mast arms TC-81.22 design 12 and design 4, as per plan (632E71245) | EACH | 1 | $21,000 | $20,500 | $20,435 | $26,000 | $23,600 |
| 33 | Signal support, type TC-81.22, design 4, as per plan (632E72111) | EACH | 4 | $11,300 | $11,750 | $11,030 | $13,500 | $12,600 |
| 34 | Combination signal support, type TC-12.31 design 1 (632E78349) | EACH | 1 | $27,500 | $27,500 | $26,875 | $34,000 | $31,000 |
| 35 | Combination signal support, type TC-81.22, design 12, as per plan (632E79131) | EACH | 1 | $15,300 | $15,250 | $14,720 | $18,000 | $17,300 |
| 36 | Pedestal, 8', transformer base (632E89900) | EACH | 8 | $865.00 | $1,200.00 | $1,618.00 | $850.00 | $1,100.00 |
| 37 | Removal of traffic signal installation (632E90100) | EACH | 3 | $4,400.00 | $2,500.00 | $5,845.00 | $2,500.00 | $3,700.00 |
| 38 | Cabinet, type TS-2, as per plan (633E65511) | EACH | 3 | $17,850 | $20,000 | $20,660 | $23,000 | $22,250 |
| 39 | Cabinet foundation, as per plan (633E67101) | EACH | 3 | $2,000.00 | $3,000.00 | $3,615.00 | $2,500.00 | $3,200.00 |
| 40 | Controller work pad, as per plan (633E67201) | EACH | 3 | $360.00 | $1,000.00 | $905.00 | $600.00 | $750.00 |
| 41 | Uninterruptible power supply (UPS), 1000 watt, as per plan (633E75001) | EACH | 3 | $5,000.00 | $6,500.00 | $5,485.00 | $7,000.00 | $7,000.00 |
| 42 | Advance radar detection, as per plan (809E69001) | EACH | 6 | $9,200.00 | $9,000.00 | $9,840.00 | $11,000 | $11,250 |
| 43 | Stop line radar detection, as per plan (809E69101) | EACH | 5 | $8,925.00 | $8,750.00 | $9,555.00 | $11,000 | $10,850 |
| 44 | Atc controller, as per plan (809E69123) | EACH | 3 | $1,000.00 | $500.00 | $550.00 | $1,000.00 | $1,100.00 |
| 45 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $86.00 | $50.00 | $80.00 | $50.00 | $75.00 |
| 46 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,750 | $6,076.00 | $11,088 | $6,000.00 | $4,250.00 |
| 47 | Maintaining traffic (614E11000) | LS | 1 | $15,000 | $5,500.00 | $33,000 | $40,000 | $26,000 |
| 48 | Field office, type B (619E16010) | MNTH | 12 | $1,000.00 | $1,200.00 | $1,500.00 | $900.00 | $800.00 |
| 49 | Construction layout stakes and surveying (623E10000) | LS | 1 | $12,550 | $12,000 | $3,500.00 | $9,128.00 | $15,000 |
| 50 | Mobilization (624E10000) | LS | 1 | $25,000 | $10,000 | $20,000 | $20,000 | $20,000 |
| 100 | Aggregate drains (605E31100) | FT | 27 | $9.00 | $50.00 | $219.00 | $40.00 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of April 9, 2026. Compiled by Mirage Metrics.