Perram Electric Inc: ODOT bid record
Perram Electric Inc submitted 192 bids on Ohio DOT contracts in the data, from 23 JAN 2020 to 12 NOV 2026, and was the low bidder on 69 of them (36%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Ohio DOT
- Low bid volume
- $44,689,376
- Latest bid
- 12 NOV 2026
- Data through
- 12 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 30 | 9 | 30% |
| 2021 | 42 | 18 | 43% |
| 2022 | 32 | 10 | 31% |
| 2023 | 29 | 11 | 38% |
| 2024 | 22 | 6 | 27% |
| 2025 | 17 | 7 | 41% |
| 2026 | 20 | 8 | 40% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| CUY | 20 | 9 | 45% |
| District 3 | 20 | 10 | 50% |
| District 6 | 11 | 6 | 55% |
| District 4 | 10 | 1 | 10% |
| District 12 | 9 | 3 | 33% |
| MAH | 8 | 0 | 0% |
| District 2 | 8 | 5 | 63% |
| MOT | 6 | 1 | 17% |
| LOR | 5 | 0 | 0% |
| WAS | 4 | 3 | 75% |
| LUC | 4 | 3 | 75% |
| MED | 4 | 2 | 50% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Erosion control | 832E30000 | EACH | 137 | 137 (100%) | $1.00 | $1.00 |
| Covering of vehicular signal head | 632E25000 | EACH | 85 | 79 (93%) | $10.00 | $40.00 |
| Law enforcement officer with patrol car for assistance | 614E11110 | HR | 150 | 68 (45%) | $70.00 | $80.00 |
| No. 10 AWG pole and bracket cable | 625E23400 | FT | 66 | 53 (80%) | $1.27 | $1.80 |
| Covering of pedestrian signal head | 632E25010 | EACH | 51 | 47 (92%) | $5.00 | $35.00 |
| Vehicular signal head, (LED), 3-section, 12" lens, 1-way, polycarbonate, as per plan | 632E05007 | EACH | 59 | 42 (71%) | $823.00 | $925.30 |
| Pull box removed | 625E31510 | EACH | 71 | 41 (58%) | $161.00 | $245.00 |
| Signal cable, 7 conductor, no. 14 AWG | 632E40700 | FT | 86 | 40 (47%) | $2.90 | $3.25 |
| Pedestrian signal head (LED), type D2, countdown, as per plan | 632E20731 | EACH | 47 | 39 (83%) | $490.00 | $650.00 |
| Signal cable, 5 conductor, no. 14 AWG | 632E40500 | FT | 67 | 31 (46%) | $2.60 | $2.95 |
| Underground warning marking tape | 625E36010 | FT | 56 | 31 (55%) | $1.27 | $1.50 |
| Seeding and mulching | 659E10000 | SY | 55 | 29 (53%) | $3.65 | $2.60 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Miller Cable Company | 135 | 45 of 135 |
| Complete General Construction Company | 78 | 37 of 78 |
| Cornerstone Electric Inc | 42 | 38 of 42 |
| Asplundh Construction LLC | 37 | 10 of 37 |
| Ruhlin Company | 32 | 18 of 32 |
| U S Utility Contractor Company | 28 | 3 of 28 |
| Greenwich Electric Inc | 18 | 10 of 18 |
| S E T Inc | 16 | 2 of 16 |
| M P Dory Co | 16 | 2 of 16 |
| J Ranck Electric Inc | 13 | 0 of 13 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 12 NOV 2026 | 260495 | COL | COL-SR 9-15.244 (SIGNALIZATION) | 2 of 3 | $133,320 | +23% |
| 12 NOV 2026 | 260515 | District 3 | D03-TSG FY2027 (M) (SIGNALIZATION) | 1 of 2 | $696,256 | Low, 10% under the second |
| 12 NOV 2026 | 260516 | District 7 | D07-Lighting RPL FY 2027 (LIGHTING) | 4 of 4 | $2,449,110 | +17% |
| 01 OCT 2026 | 260442 | District 3 | D03-LG TSG RM FY2027 (LIGHTING) | 1 of 1 | $176,303 | Low |
| 01 OCT 2026 | 260445 | District 6 | D06-ELEC-FY2027 (LIGHTING) | 1 of 4 | $550,733 | Low, 19% under the second |
| 17 SEP 2026 | 260406 | GEA | GEA-Chardon TSG upgrade (SIGNALIZATION) | 2 of 3 | $1,612,955 | 0.0% |
| 13 AUG 2026 | 260372 | SUM | SUM-SR 532-00.80 (SIGNALIZATION) | 1 of 2 | $373,050 | Low, 2.0% under the second |
| 25 JUN 2026 | 260319 | FRA | FRA-VAR DMS & QWS-FY2026 (SIGNALIZATION) | 3 of 3 | $3,197,800 | +36% |
| 25 JUN 2026 | 260321 | MAH | MAH-LG FY2027 (LIGHTING) | 3 of 4 | $1,432,132 | +40% |
| 25 JUN 2026 | 268012 | VAN | VAN-Bonnewitz Avenue Signal (SIGNALIZATION) | 1 of 3 | $567,680 | Low, 5.0% under the second |
| 11 JUN 2026 | 260293 | CUY | CUY-DMS & QWS FY2026 (SIGNALIZATION) | 2 of 3 | $1,233,133 | +24% |
| 07 MAY 2026 | 260258 | District 12 | D12-TSG FY2026 (SIGNALIZATION) | 1 of 3 | $339,750 | Low, 22% under the second |
| 23 APR 2026 | 260218 | District 2 | D02-TSG FY2026 (SIGNALIZATION) | 1 of 3 | $459,710 | Low, 30% under the second |
| 09 APR 2026 | 260172 | District 4 | D04-TSG FY2026 (SIGNALIZATION) | 3 of 5 | $675,895 | +14% |
| 09 APR 2026 | 260180 | MOT | MOT-CR 74-08.40 (SIGNALIZATION) | 4 of 4 | $928,788 | +13% |
| 26 MAR 2026 | 260164 | District 12 | D12-LG FY2026 (LIGHTING) | 3 of 3 | $2,144,674 | +53% |
| 26 MAR 2026 | 260165 | MOT | MOT-SR 725/Jamaica TSG (SIGNALIZATION) | 3 of 6 | $203,633 | +2.0% |
| 12 MAR 2026 | 260139 | ERI | ERI-/HUR TSG FY2026 (SIGNALIZATION) | 2 of 3 | $751,000 | +4.0% |
| 19 FEB 2026 | 260090 | MOT | MOT-Trotwood Olive Rd Walks SA22 (SPOT SAFETY) | 4 of 5 | $1,113,500 | +34% |
| 29 JAN 2026 | 260055 | LAK | LAK-IR 90-08.77 VSL Signs (SIGNALIZATION) | 1 of 2 | $4,123,000 | Low, 16% under the second |
| 18 DEC 2025 | 250598 | TRU | TRU-US 422-08.01 (SIGNALIZATION) | 2 of 6 | $208,078 | +2.0% |
| 09 OCT 2025 | 250461 | District 3 | D03-TSG FY2026 (M) (SIGNALIZATION) | 2 of 6 | $303,579 | +2.0% |
| 09 OCT 2025 | 250478 | District 6 | D06-ELEC FY26 (LIGHTING) | 1 of 4 | $489,159 | Low, 19% under the second |
| 25 SEP 2025 | 250446 | District 3 | D03-TSG Radar FY2026 (SIGNALIZATION) | 1 of 6 | $210,145 | Low, 10% under the second |
| 11 SEP 2025 | 250406 | CLA | CLA-SR 235/SR 571-04.36/01.05 (LIGHTING) | 5 of 9 | $88,423 | +30% |
How this record was read
ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
- Every bid counted here matched its published total to within one dollar; ODOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.